{"help": "https://energydata.info/en/api/3/action/help_show?name=datastore_search", "success": true, "result": {"include_total": true, "limit": 100, "records_format": "objects", "resource_id": "56f8f504-8d75-4c2d-9262-edbfc4c601fa", "total_estimation_threshold": null, "records": [{"_id":1,"Organization":"WB","Approval date":"2013","Country":"Djibouti","Region":"AFR","Project ID":"P127143, P127144","Project Name":"Geothermal Power Generation Program","Total Project Cost (US$ milion)":31.23,"Contribution by organization (US$ million)":13.14,"Contribution by Organization (constant 2010 US$ million)":12.46,"Total exploratory phase (constant 2010 US$)":12.46,"Total production phase (constant 2010 US$)":0,"Total TA (constant 2010 US$)":0,"Total risk mitigation instruments (constant 2010 US$)":null,"Source":"IDA ($6 milion), GEF ($6.04 million), ESMAP ($1.1 million)","Comments":"Project has co-financing from AfDB ($7.34 million - exploratory drillling), OFID ($7 million - exploratory drilling + TA) and AFD ($3.25 million - exploratory drilling)","Location 1":"(11.588333, 43.145)"},{"_id":2,"Organization":"WB","Approval date":"1984","Country":"Djibouti","Region":"AFR","Project ID":"P000609","Project Name":"Djibouti - Geothermal Exploration Project","Total Project Cost (US$ milion)":17.4,"Contribution by organization (US$ million)":6,"Contribution by Organization (constant 2010 US$ million)":10.93,"Total exploratory phase (constant 2010 US$)":1.75,"Total production phase (constant 2010 US$)":5.57,"Total TA (constant 2010 US$)":3.61,"Total risk mitigation instruments (constant 2010 US$)":null,"Source":"IDA","Comments":"Surface exploration (4%), exploratory drilling-2 T gradient wells (12%), production drilling-4 wells (51%), TA (33%)","Location 1":"(11.588333, 43.145)"},{"_id":3,"Organization":"WB","Approval date":"1989","Country":"Djibouti ","Region":"AFR","Project ID":"P000612","Project Name":"Geothermal Development Project","Total Project Cost (US$ milion)":38.04,"Contribution by organization (US$ million)":9.2,"Contribution by Organization (constant 2010 US$ million)":14.43,"Total exploratory phase (constant 2010 US$)":1.54,"Total production phase (constant 2010 US$)":12.72,"Total TA (constant 2010 US$)":0.17,"Total risk mitigation instruments (constant 2010 US$)":null,"Source":"IDA","Comments":"TA ($0.11 million), surface studies (0.98 million), production drilling (8.1 million)","Location 1":"(11.588333, 43.145)"},{"_id":4,"Organization":"WB","Approval date":"2014","Country":"Ethiopia","Region":"AFR","Project ID":"","Project Name":"Geothermal Sector Development Project ","Total Project Cost (US$ milion)":216,"Contribution by organization (US$ million)":178.5,"Contribution by Organization (constant 2010 US$ million)":159.34,"Total exploratory phase (constant 2010 US$)":15.64,"Total production phase (constant 2010 US$)":140.94,"Total TA (constant 2010 US$)":2.76,"Total risk mitigation instruments (constant 2010 US$)":null,"Source":"IDA (plus $24.5 million from SREP and 3.5 million from Iceland)","Comments":"IDA contribution will be for production drilling and steam gathering  in Aluto  ($92.2 million), exploration drilling in Alalobad ($19.8 million), two drilling rigs ($61 million) and TA ($3 million) .  The drilling rigs have been incorporated to the production drilling figure. Japan is considering to provide financing for the power plant at Aluto.","Location 1":"(8.980603, 38.757761)"},{"_id":5,"Organization":"WB","Approval date":"2010","Country":"Ethiopia","Region":"AFR","Project ID":"P120172","Project Name":"Additional Financing for  Energy Access Project","Total Project Cost (US$ milion)":30,"Contribution by organization (US$ million)":15,"Contribution by Organization (constant 2010 US$ million)":10,"Total exploratory phase (constant 2010 US$)":10,"Total production phase (constant 2010 US$)":0,"Total TA (constant 2010 US$)":0,"Total risk mitigation instruments (constant 2010 US$)":null,"Source":"IDA","Comments":"Exploratory drilling (4 test wells, co-financed by Japan)","Location 1":"(8.980603, 38.757761)"},{"_id":6,"Organization":"WB","Approval date":"1983","Country":"Ethiopia","Region":"AFR","Project ID":"P000696","Project Name":"Ethiopia - Petroleum Exploration Promotion and Geothermal Reconnaissance Project ","Total Project Cost (US$ milion)":9.84,"Contribution by organization (US$ million)":7,"Contribution by Organization (constant 2010 US$ million)":6.6,"Total exploratory phase (constant 2010 US$)":5.28,"Total production phase (constant 2010 US$)":0,"Total TA (constant 2010 US$)":1.32,"Total risk mitigation instruments (constant 2010 US$)":null,"Source":"IDA","Comments":"TA and survey work - no information on % for getohermal, assumed 50% total, of which 20% for TA and 80% for survey work","Location 1":"(8.980603, 38.757761)"},{"_id":7,"Organization":"WB","Approval date":"2012","Country":"Kenya","Region":"AFR","Project ID":"P122671","Project Name":"Private Sector Power Generation Support Project","Total Project Cost (US$ milion)":212,"Contribution by organization (US$ million)":36,"Contribution by Organization (constant 2010 US$ million)":34.65,"Total exploratory phase (constant 2010 US$)":0,"Total production phase (constant 2010 US$)":0,"Total TA (constant 2010 US$)":0,"Total risk mitigation instruments (constant 2010 US$)":34.65,"Source":"IDA - PRG","Comments":"PRG supports the PPA between OrPower 4, Inc and KPLC for a 36 MW+ 16 MW expansion of Olkaria 3. Project is financed by the sponsor ($47 million equity) and OPIC ($165 million debt) // http://www.ormat.com/news/latest-items/ormat-technologies-signs-long-term-debt-financing-310-million-olkaria-iii-geotherm","Location 1":"(-1.292066, 36.821946)"},{"_id":8,"Organization":"WB","Approval date":"2010","Country":"Kenya","Region":"AFR","Project ID":"P103037","Project Name":"Electricity Expansion Project ","Total Project Cost (US$ milion)":1035,"Contribution by organization (US$ million)":120,"Contribution by Organization (constant 2010 US$ million)":127.5,"Total exploratory phase (constant 2010 US$)":0,"Total production phase (constant 2010 US$)":120,"Total TA (constant 2010 US$)":7.5,"Total risk mitigation instruments (constant 2010 US$)":null,"Source":"IDA","Comments":"Financing indicated is only for geothermal component (component A). Co-financing - JICA: US$323 million, AFD: $210 million; EIB: $168 million; kFW: $84 million; KenGen: $130 million.","Location 1":"(-1.292066, 36.821946)"},{"_id":9,"Organization":"WB","Approval date":"2004","Country":"Kenya","Region":"AFR","Project ID":"P083131","Project Name":"Energy Sector Recovery Project","Total Project Cost (US$ milion)":55,"Contribution by organization (US$ million)":25.5,"Contribution by Organization (constant 2010 US$ million)":28.96,"Total exploratory phase (constant 2010 US$)":null,"Total production phase (constant 2010 US$)":27.26,"Total TA (constant 2010 US$)":1.7,"Total risk mitigation instruments (constant 2010 US$)":null,"Source":"IDA","Comments":"[[The project includes activities other than geothermal that have not been taken into account in the financing figures]] Olkaria II extension (Unit 3 -35 MW) - above the ground infrastructure, including steam gathering+ power plant ($53.5 million total - $24 million IDA, $48 million EIB, $6.9 million KenGen). Also studies (Optimization study for Olkaria I, II & IV; Establishment of GDC; other consultant work)","Location 1":"(-1.292066, 36.821946)"},{"_id":10,"Organization":"WB","Approval date":"1988","Country":"Kenya","Region":"AFR","Project ID":"P001314","Project Name":"Kenya Geothermal Development and Energy Preinvestment Project ","Total Project Cost (US$ milion)":66.95,"Contribution by organization (US$ million)":40.7,"Contribution by Organization (constant 2010 US$ million)":66.41,"Total exploratory phase (constant 2010 US$)":48.95,"Total production phase (constant 2010 US$)":14.69,"Total TA (constant 2010 US$)":2.77,"Total risk mitigation instruments (constant 2010 US$)":null,"Source":"IDA","Comments":"Exploratory drilling (25 wells) ($30 million), production drilling (8 make-up wells) ($9 million), TA ($1.7 million)  - only geothermal components of the project have been included in the $ amounts","Location 1":"(-1.292066, 36.821946)"},{"_id":11,"Organization":"WB","Approval date":"1984","Country":"Kenya","Region":"AFR","Project ID":"P001290","Project Name":"Kenya - Geothermal Exploration Project","Total Project Cost (US$ milion)":24.5,"Contribution by organization (US$ million)":24.5,"Contribution by Organization (constant 2010 US$ million)":44.64,"Total exploratory phase (constant 2010 US$)":34.37,"Total production phase (constant 2010 US$)":0,"Total TA (constant 2010 US$)":10.27,"Total risk mitigation instruments (constant 2010 US$)":null,"Source":"IDA","Comments":"Exploratory drilling (77%), capacity building (23%)","Location 1":"(-1.292066, 36.821946)"},{"_id":12,"Organization":"WB","Approval date":"1983","Country":"Kenya","Region":"AFR","Project ID":"P001287","Project Name":"Olkaria Geothermal Power Expansion Project ","Total Project Cost (US$ milion)":41.6,"Contribution by organization (US$ million)":12,"Contribution by Organization (constant 2010 US$ million)":22.64,"Total exploratory phase (constant 2010 US$)":0,"Total production phase (constant 2010 US$)":18.87,"Total TA (constant 2010 US$)":3.77,"Total risk mitigation instruments (constant 2010 US$)":null,"Source":"IBRD","Comments":"Expansion project from 1983-86: addition of one additional generator to the power house, expansion of steam system, TA for construction and supervision, detailed study of geothermal potential - no details on division of costs (indicated split is arbitrary)","Location 1":"(-1.292066, 36.821946)"},{"_id":13,"Organization":"WB","Approval date":"1980","Country":"Kenya","Region":"AFR","Project ID":"P001275","Project Name":"Olkaria Geothermal Power Project","Total Project Cost (US$ milion)":40,"Contribution by organization (US$ million)":40,"Contribution by Organization (constant 2010 US$ million)":91.03,"Total exploratory phase (constant 2010 US$)":0,"Total production phase (constant 2010 US$)":91.03,"Total TA (constant 2010 US$)":0,"Total risk mitigation instruments (constant 2010 US$)":null,"Source":"IBRD","Comments":"Construction of power generation section","Location 1":"(-1.292066, 36.821946)"},{"_id":14,"Organization":"WB","Approval date":"1978","Country":"Kenya","Region":"AFR","Project ID":"","Project Name":"Olkaria Geothermal Engineering Project","Total Project Cost (US$ milion)":15.5,"Contribution by organization (US$ million)":9,"Contribution by Organization (constant 2010 US$ million)":24.18,"Total exploratory phase (constant 2010 US$)":0,"Total production phase (constant 2010 US$)":24.18,"Total TA (constant 2010 US$)":0,"Total risk mitigation instruments (constant 2010 US$)":null,"Source":"IBRD","Comments":"Drilling of additional production wells","Location 1":"(-1.292066, 36.821946)"},{"_id":15,"Organization":"WB","Approval date":"2011","Country":"Indonesia","Region":"EAP","Project ID":"P113078","Project Name":"Geothermal Clean Energy Investment Project","Total Project Cost (US$ milion)":575,"Contribution by organization (US$ million)":175,"Contribution by Organization (constant 2010 US$ million)":170.09,"Total exploratory phase (constant 2010 US$)":0,"Total production phase (constant 2010 US$)":170.09,"Total TA (constant 2010 US$)":0,"Total risk mitigation instruments (constant 2010 US$)":null,"Source":"IBRD (plus $125 million from CTF for WB project; $325 million total CTF) ","Comments":"SAGS (Steam field above-ground system) ($32 million), power plants + transmission line ($141.6 million). Other financing sources: CTF: $325 mill. (loan), ADB:  $250 mill.  (loan), ADB+IFC: $75 mill","Location 1":"(-6.208763, 106.845599)"},{"_id":16,"Organization":"WB","Approval date":"2011","Country":"Indonesia","Region":"EAP","Project ID":"P112363","Project Name":"Geothermal Power Support Program","Total Project Cost (US$ milion)":null,"Contribution by organization (US$ million)":0.9,"Contribution by Organization (constant 2010 US$ million)":0.88,"Total exploratory phase (constant 2010 US$)":0,"Total production phase (constant 2010 US$)":0,"Total TA (constant 2010 US$)":0.88,"Total risk mitigation instruments (constant 2010 US$)":null,"Source":"IBRD","Comments":"TA","Location 1":"(-6.208763, 106.845599)"},{"_id":17,"Organization":"WB","Approval date":"2008","Country":"Indonesia","Region":"EAP","Project ID":"P099757","Project Name":"Geothermal Power Generation Development Project","Total Project Cost (US$ milion)":9,"Contribution by organization (US$ million)":4,"Contribution by Organization (constant 2010 US$ million)":4.08,"Total exploratory phase (constant 2010 US$)":0,"Total production phase (constant 2010 US$)":0,"Total TA (constant 2010 US$)":4.08,"Total risk mitigation instruments (constant 2010 US$)":null,"Source":"GEF","Comments":"TA","Location 1":"(-6.208763, 106.845599)"},{"_id":18,"Organization":"WB","Approval date":"1994","Country":"Philippines","Region":"EAP","Project ID":"P004607, P004404","Project Name":"Leyte Luzon Geothermal Project","Total Project Cost (US$ milion)":1333.6,"Contribution by organization (US$ million)":257,"Contribution by Organization (constant 2010 US$ million)":352.26,"Total exploratory phase (constant 2010 US$)":0,"Total production phase (constant 2010 US$)":338.17,"Total TA (constant 2010 US$)":14.09,"Total risk mitigation instruments (constant 2010 US$)":null,"Source":"IBRD ($227 million), GEF ($30 million)","Comments":"Development of steam field/production drilling including steam collection and power interconnection (22%), BOT power plant (49%), transmission infrastructure (35%), technical assistance (4%) - no detailed cost information in project documents","Location 1":"(14.599512, 120.984219)"},{"_id":19,"Organization":"WB","Approval date":"1994","Country":"Philippines","Region":"EAP","Project ID":"P004584","Project Name":"Leyte Cebu Geothermal Project","Total Project Cost (US$ milion)":434.8,"Contribution by organization (US$ million)":211,"Contribution by Organization (constant 2010 US$ million)":318.14,"Total exploratory phase (constant 2010 US$)":0,"Total production phase (constant 2010 US$)":306.57,"Total TA (constant 2010 US$)":11.57,"Total risk mitigation instruments (constant 2010 US$)":null,"Source":"IBRD","Comments":"Development of steam field/production drilling including steam collection and power interconnection (22%), BOT power plant (49%), transmission infrastructure (35%), technical assistance (4%) - no detailed cost information in project documents","Location 1":"(14.599512, 120.984219)"},{"_id":20,"Organization":"WB","Approval date":"1988","Country":"Philippines","Region":"EAP","Project ID":"P004555","Project Name":"Bacon Manito Geothermal Development Project","Total Project Cost (US$ milion)":289.5,"Contribution by organization (US$ million)":96.1,"Contribution by Organization (constant 2010 US$ million)":156.82,"Total exploratory phase (constant 2010 US$)":59.59,"Total production phase (constant 2010 US$)":94.09,"Total TA (constant 2010 US$)":3.14,"Total risk mitigation instruments (constant 2010 US$)":null,"Source":"IDA","Comments":"Exploratory drilling (38%), production drilling + steam generation system (37%), expansion of transmission and other facilities (23%), capacity building (2%) - no detailed cost information in project documents","Location 1":"(14.599512, 120.984219)"},{"_id":21,"Organization":"WB","Approval date":"1982","Country":"Philippines","Region":"EAP","Project ID":"P004493","Project Name":"Geothermal Exploration Project","Total Project Cost (US$ milion)":58.75,"Contribution by organization (US$ million)":8.23,"Contribution by Organization (constant 2010 US$ million)":16.14,"Total exploratory phase (constant 2010 US$)":16.14,"Total production phase (constant 2010 US$)":0,"Total TA (constant 2010 US$)":0,"Total risk mitigation instruments (constant 2010 US$)":null,"Source":"IDA","Comments":"Exploratory drilling","Location 1":"(14.599512, 120.984219)"},{"_id":22,"Organization":"WB","Approval date":"2009","Country":"Armenia","Region":"ECA","Project ID":"P112408","Project Name":"Armenia Geothermal Project (Geofund)","Total Project Cost (US$ milion)":null,"Contribution by organization (US$ million)":1.5,"Contribution by Organization (constant 2010 US$ million)":1.52,"Total exploratory phase (constant 2010 US$)":0,"Total production phase (constant 2010 US$)":0,"Total TA (constant 2010 US$)":1.52,"Total risk mitigation instruments (constant 2010 US$)":null,"Source":"GEF","Comments":"TA","Location 1":"(40.183333, 44.516667)"},{"_id":23,"Organization":"WB","Approval date":"1996","Country":"Lithuania","Region":"ECA","Project ID":"P036011, P035758","Project Name":"Lithuania Klaipeda Geothermal","Total Project Cost (US$ milion)":18,"Contribution by organization (US$ million)":12.8,"Contribution by Organization (constant 2010 US$ million)":0,"Total exploratory phase (constant 2010 US$)":0,"Total production phase (constant 2010 US$)":0,"Total TA (constant 2010 US$)":0,"Total risk mitigation instruments (constant 2010 US$)":null,"Source":"IBRD ($5.9 million), GEF ($6.9 million)","Comments":"Development of low temperature geothermal resources for district heating systems","Location 1":"(54.687156, 25.279651)"},{"_id":24,"Organization":"WB","Approval date":"2000","Country":"Poland","Region":"ECA","Project ID":"P037339","Project Name":"Podhale Geothermal District Heating & Environment Project","Total Project Cost (US$ milion)":99.3,"Contribution by organization (US$ million)":38.2,"Contribution by Organization (constant 2010 US$ million)":0,"Total exploratory phase (constant 2010 US$)":0,"Total production phase (constant 2010 US$)":0,"Total TA (constant 2010 US$)":0,"Total risk mitigation instruments (constant 2010 US$)":null,"Source":"IBRD","Comments":"Development of low temperature geothermal resources for district heating systems","Location 1":"(52.229676, 21.012229)"},{"_id":25,"Organization":"WB","Approval date":"2000","Country":"Poland","Region":"ECA","Project ID":"P057993","Project Name":"Podhale Geothermal District Heating & Environment Project","Total Project Cost (US$ milion)":null,"Contribution by organization (US$ million)":5.4,"Contribution by Organization (constant 2010 US$ million)":0,"Total exploratory phase (constant 2010 US$)":0,"Total production phase (constant 2010 US$)":0,"Total TA (constant 2010 US$)":0,"Total risk mitigation instruments (constant 2010 US$)":null,"Source":"GEF","Comments":"Development of low temperature geothermal resources for district heating systems","Location 1":"(52.229676, 21.012229)"},{"_id":26,"Organization":"AfDB","Approval date":"2011","Country":"Kenya","Region":"AFR","Project ID":"P-KE-FZ0-003","Project Name":"Menengai Geothermal Development Project","Total Project Cost (US$ milion)":848,"Contribution by organization (US$ million)":120,"Contribution by Organization (constant 2010 US$ million)":117.57,"Total exploratory phase (constant 2010 US$)":0,"Total production phase (constant 2010 US$)":117.57,"Total TA (constant 2010 US$)":0,"Total risk mitigation instruments (constant 2010 US$)":null,"Source":"$120 million from AfDB (+25million SREP-AfDB)","Comments":"Other financing sources: SREP: $40 mill. (loan & grant), WB: $115 mill. (loan), AFD: 170 mill. (loan), EIB: $37 mill. (loan); GDC/MoE: $ 367 mill. (equity)","Location 1":"(-1.292066, 36.821946)"},{"_id":27,"Organization":"AfDB","Approval date":"2013","Country":"Djibouti","Region":"AFR","Project ID":"P-DJ-FA0-001","Project Name":"Geothermal Exploratory Drilling Project","Total Project Cost (US$ milion)":31.23,"Contribution by organization (US$ million)":7.34,"Contribution by Organization (constant 2010 US$ million)":6.96,"Total exploratory phase (constant 2010 US$)":4.74,"Total production phase (constant 2010 US$)":0,"Total TA (constant 2010 US$)":2.22,"Total risk mitigation instruments (constant 2010 US$)":null,"Source":"","Comments":"Project has co-financing from WB (IDA, GEF, ESMAP - $ 13.14 million for exploratory drilling), OFID ($7 million - exploratory drilling + TA) and AFD ($3.25 million - exploratory drilling)","Location 1":"(11.588333, 43.145)"},{"_id":28,"Organization":"AfDB","Approval date":"2014","Country":"Tanzania","Region":"AFR","Project ID":"","Project Name":"Tanzania geothermal project - TBC","Total Project Cost (US$ milion)":536.8,"Contribution by organization (US$ million)":45,"Contribution by Organization (constant 2010 US$ million)":41.4,"Total exploratory phase (constant 2010 US$)":null,"Total production phase (constant 2010 US$)":13.8,"Total TA (constant 2010 US$)":null,"Total risk mitigation instruments (constant 2010 US$)":27.6,"Source":"$45 million from AfDB (+$25 million SREP-AfDB)","Comments":"AfDB contribution is for risk mitigation facility (i.e. guarantee for PPAs if and when resources are developed), SREP contributes to geothermal strategy, institutional framework, capacity building, exploration, including test drilling, and advisory services for power project development","Location 1":"(-6.173056, 35.741944)"},{"_id":29,"Organization":"ADB","Approval date":"2011","Country":"Philippines","Region":"EAP","Project ID":"45927-012","Project Name":"SINGLE WELL ENGINEERED ELECTRICAL TURBINE SYSTEM (SWEETS) GEOTHERMAL POWER PROJECT","Total Project Cost (US$ milion)":null,"Contribution by organization (US$ million)":0.425,"Contribution by Organization (constant 2010 US$ million)":0.42,"Total exploratory phase (constant 2010 US$)":0,"Total production phase (constant 2010 US$)":0,"Total TA (constant 2010 US$)":0.42,"Total risk mitigation instruments (constant 2010 US$)":null,"Source":"","Comments":"","Location 1":"(14.599512, 120.984219)"},{"_id":30,"Organization":"ADB","Approval date":"2014","Country":"Indonesia","Region":"EAP","Project ID":"42916 - 014","Project Name":"Sarulla Geothermal Power Generation Project","Total Project Cost (US$ milion)":1170,"Contribution by organization (US$ million)":250,"Contribution by Organization (constant 2010 US$ million)":237.09,"Total exploratory phase (constant 2010 US$)":0,"Total production phase (constant 2010 US$)":237.09,"Total TA (constant 2010 US$)":0,"Total risk mitigation instruments (constant 2010 US$)":null,"Source":"ADB private sector (plus $80 million from CTF and $20 million from Canadian Private Fund for Private Sector in Asia)","Comments":"The Project will develop the steam resources, and design, finance, construct, operate and maintain geothermal power plants with a total net guaranteed deliverable capacity of approximately 320 MW. The project also includes a transmission line. Since this is a private project, there aer no details on the specific financing per component and partner. It has been assumed, that out of the $250 million from ADB, 40% will go towards steam resources, 40% towards the power plant, and 20% towards the transmission line.       $70 million remaning from CTF-ADB allocation","Location 1":"(-6.208763, 106.845599)"},{"_id":31,"Organization":"ADB","Approval date":"2011","Country":"Indonesia","Region":"EAP","Project ID":"43249-012","Project Name":"Geothermal Power Development Project","Total Project Cost (US$ milion)":null,"Contribution by organization (US$ million)":1.725,"Contribution by Organization (constant 2010 US$ million)":1.7,"Total exploratory phase (constant 2010 US$)":0,"Total production phase (constant 2010 US$)":0,"Total TA (constant 2010 US$)":1.7,"Total risk mitigation instruments (constant 2010 US$)":null,"Source":"","Comments":"The source of funds is an Australian Grant","Location 1":"(-6.208763, 106.845599)"},{"_id":32,"Organization":"ADB","Approval date":"2002","Country":"Indonesia","Region":"EAP","Project ID":"34100-013","Project Name":"Renewable Energy Development","Total Project Cost (US$ milion)":161,"Contribution by organization (US$ million)":53.66666667,"Contribution by Organization (constant 2010 US$ million)":63.89,"Total exploratory phase (constant 2010 US$)":0,"Total production phase (constant 2010 US$)":63.89,"Total TA (constant 2010 US$)":0,"Total risk mitigation instruments (constant 2010 US$)":null,"Source":"","Comments":"No information on allocation to each of the components. It has been assumed that 1/3 of project funds went to the production phase for geothermal.                                                                                      Up to eigth mini hydropower plants constructed and commissioned\n\nUp to two geothermal power plants constructed and commissioned\nUp to two small hydropower plants constructed and commissioned\n70kV and 20kV transmission lines for power evacuation\nConsulting Services for project implementation","Location 1":"(-6.208763, 106.845599)"},{"_id":33,"Organization":"ADB","Approval date":"2007","Country":"China","Region":"EAP","Project ID":"41089-012 ","Project Name":"Utilization of Renewable Shallow-Ground Geo-Energy","Total Project Cost (US$ milion)":null,"Contribution by organization (US$ million)":0.15,"Contribution by Organization (constant 2010 US$ million)":0,"Total exploratory phase (constant 2010 US$)":0,"Total production phase (constant 2010 US$)":0,"Total TA (constant 2010 US$)":0,"Total risk mitigation instruments (constant 2010 US$)":null,"Source":"","Comments":"Heating - not included in totals","Location 1":"(39.904211, 116.407395)"},{"_id":34,"Organization":"ADB","Approval date":"2007","Country":"China","Region":"EAP","Project ID":"40634-012","Project Name":"Inner Mongolia Autonomous Region Environment Improvement Project (Phase II)","Total Project Cost (US$ milion)":null,"Contribution by organization (US$ million)":0.8,"Contribution by Organization (constant 2010 US$ million)":0,"Total exploratory phase (constant 2010 US$)":0,"Total production phase (constant 2010 US$)":0,"Total TA (constant 2010 US$)":0,"Total risk mitigation instruments (constant 2010 US$)":null,"Source":"","Comments":"Heating (geothermal + gas) - not included in totals","Location 1":"(39.904211, 116.407395)"},{"_id":35,"Organization":"EIB","Approval date":"2012","Country":"Regional Caribbean","Region":"LCR","Project ID":"","Project Name":"Support to the Caribbean Geothermal Energy scheme","Total Project Cost (US$ milion)":null,"Contribution by organization (US$ million)":1.44,"Contribution by Organization (constant 2010 US$ million)":1.39,"Total exploratory phase (constant 2010 US$)":0,"Total production phase (constant 2010 US$)":0,"Total TA (constant 2010 US$)":1.39,"Total risk mitigation instruments (constant 2010 US$)":null,"Source":"http://www.eib.org/about/press/2012/2012-018-eib-backs-caribbean-geothermal-energy-scheme.htm","Comments":"The European Investment Bank, the European Unions long-term lending institution, will provide a EUR 1.1 million grant to enhance detailed planning and study the feasibility of exporting electricity generated by geothermal energy from Dominica to neighbouring islands Martinique and Guadeloupe - assigned to TA","Location 1":"(21.633941, -78.359985)"},{"_id":36,"Organization":"EIB","Approval date":"2012","Country":"Kenya","Region":"AFR","Project ID":"","Project Name":"Menengai Geothermal Development Project","Total Project Cost (US$ milion)":null,"Contribution by organization (US$ million)":24,"Contribution by Organization (constant 2010 US$ million)":23.1,"Total exploratory phase (constant 2010 US$)":0,"Total production phase (constant 2010 US$)":23.1,"Total TA (constant 2010 US$)":0,"Total risk mitigation instruments (constant 2010 US$)":null,"Source":"http://www.afdb.org/fileadmin/uploads/afdb/Documents/Project-and-Operations/Kenya%20-%20Menengai%20geothermal%20development%20project%20-%20AR.pdf","Comments":"","Location 1":"(-1.292066, 36.821946)"},{"_id":37,"Organization":"EIB","Approval date":"2010","Country":"Kenya","Region":"AFR","Project ID":"","Project Name":"OLKARIA I & IV GEOTHERMAL EXTENSION","Total Project Cost (US$ milion)":1035,"Contribution by organization (US$ million)":168,"Contribution by Organization (constant 2010 US$ million)":168,"Total exploratory phase (constant 2010 US$)":0,"Total production phase (constant 2010 US$)":168,"Total TA (constant 2010 US$)":0,"Total risk mitigation instruments (constant 2010 US$)":null,"Source":"","Comments":"Co-financing - JICA: US$323 million, AFD: $210 million; WB: $120 million; kFW: $84 million; KenGen: $130 million.","Location 1":"(-1.292066, 36.821946)"},{"_id":38,"Organization":"EIB","Approval date":"2009","Country":"Kenya","Region":"AFR","Project ID":"","Project Name":"OLKARIA II EXTENSION","Total Project Cost (US$ milion)":null,"Contribution by organization (US$ million)":6,"Contribution by Organization (constant 2010 US$ million)":6.07,"Total exploratory phase (constant 2010 US$)":0,"Total production phase (constant 2010 US$)":6.07,"Total TA (constant 2010 US$)":0,"Total risk mitigation instruments (constant 2010 US$)":null,"Source":"","Comments":"","Location 1":"(-1.292066, 36.821946)"},{"_id":39,"Organization":"EIB","Approval date":"2005","Country":"Kenya","Region":"AFR","Project ID":"","Project Name":"OLKARIA II EXTENSION","Total Project Cost (US$ milion)":null,"Contribution by organization (US$ million)":42,"Contribution by Organization (constant 2010 US$ million)":46.22,"Total exploratory phase (constant 2010 US$)":0,"Total production phase (constant 2010 US$)":46.22,"Total TA (constant 2010 US$)":0,"Total risk mitigation instruments (constant 2010 US$)":null,"Source":"","Comments":"","Location 1":"(-1.292066, 36.821946)"},{"_id":40,"Organization":"EIB","Approval date":"1999","Country":"Kenya","Region":"AFR","Project ID":"","Project Name":"KPLC - Olkaria II","Total Project Cost (US$ milion)":null,"Contribution by organization (US$ million)":53.6,"Contribution by Organization (constant 2010 US$ million)":67.77,"Total exploratory phase (constant 2010 US$)":0,"Total production phase (constant 2010 US$)":67.77,"Total TA (constant 2010 US$)":0,"Total risk mitigation instruments (constant 2010 US$)":null,"Source":"","Comments":"Construction of new geothermal power plant, transmission line and substations. ","Location 1":"(-1.292066, 36.821946)"},{"_id":41,"Organization":"EIB","Approval date":"1982","Country":"Kenya","Region":"AFR","Project ID":"","Project Name":"OLKARIA GEOTHERMAL POWER","Total Project Cost (US$ milion)":null,"Contribution by organization (US$ million)":11,"Contribution by Organization (constant 2010 US$ million)":21.57,"Total exploratory phase (constant 2010 US$)":0,"Total production phase (constant 2010 US$)":21.57,"Total TA (constant 2010 US$)":0,"Total risk mitigation instruments (constant 2010 US$)":null,"Source":"","Comments":"11 million is approximate since the project is from 1982 and the indicated amount is EUR 9 million. We assume that the full amount went into the production phase, but no information on the project is available","Location 1":"(-1.292066, 36.821946)"},{"_id":42,"Organization":"EIB","Approval date":"2010","Country":"Djibouti","Region":"AFR","Project ID":"","Project Name":"Feasibility study and exploration","Total Project Cost (US$ milion)":null,"Contribution by organization (US$ million)":4.57,"Contribution by Organization (constant 2010 US$ million)":4.57,"Total exploratory phase (constant 2010 US$)":4.57,"Total production phase (constant 2010 US$)":0,"Total TA (constant 2010 US$)":0,"Total risk mitigation instruments (constant 2010 US$)":null,"Source":"http://www.bgr.bund.de/EN/Themen/Zusammenarbeit/TechnZusammenarb/Geotherm/Downloads/events_EIB.pdf?__blob=publicationFile&v=2","Comments":"Information on this support is limited","Location 1":"(11.588333, 43.145)"},{"_id":43,"Organization":"IDB","Approval date":"2014","Country":"Mexico","Region":"LCR","Project ID":"ME-L1148, ME-G1005, ME-X1010","Project Name":"Geothermal Financing and Risk Transfer Facility","Total Project Cost (US$ milion)":1145.7,"Contribution by organization (US$ million)":54.3,"Contribution by Organization (constant 2010 US$ million)":51.5,"Total exploratory phase (constant 2010 US$)":null,"Total production phase (constant 2010 US$)":0,"Total TA (constant 2010 US$)":null,"Total risk mitigation instruments (constant 2010 US$)":51.5,"Source":"","Comments":"CTF contributes $32.41 million from the CTF IP and $20 million from the DPSP. GoM contributes about $11.5 million - - the full allocation has been assigned to the \"risk mitigation instruments\" category","Location 1":"(19.432608, -99.133208)"},{"_id":44,"Organization":"IDB","Approval date":"2014","Country":"Chile","Region":"LCR","Project ID":"","Project Name":"Geothermal Risk Mitifation Program","Total Project Cost (US$ milion)":null,"Contribution by organization (US$ million)":50,"Contribution by Organization (constant 2010 US$ million)":47.42,"Total exploratory phase (constant 2010 US$)":null,"Total production phase (constant 2010 US$)":0,"Total TA (constant 2010 US$)":null,"Total risk mitigation instruments (constant 2010 US$)":47.42,"Source":"","Comments":"CTF contribute $30 million from the CTF IP and $20 million from the DPSP/ Contribution from IDB may be in the $140-$205 million range, but a minimum of $50 million is indicated, depending on projects identified     Solutions could include senior and subordinated long term project loans, short\nterm bridge loans, and guarantees - the full allocation has been assigned to the \"risk mitigation instruments\" category","Location 1":"(-33.46912, -70.641997)"},{"_id":45,"Organization":"IDB","Approval date":"2010","Country":"Bolivia","Region":"LCR","Project ID":"BO-T1139 ","Project Name":"Preparation of the Sur Lipez Geothermal Project (BO-L1057)","Total Project Cost (US$ milion)":null,"Contribution by organization (US$ million)":0.15,"Contribution by Organization (constant 2010 US$ million)":0.15,"Total exploratory phase (constant 2010 US$)":0,"Total production phase (constant 2010 US$)":0,"Total TA (constant 2010 US$)":0.15,"Total risk mitigation instruments (constant 2010 US$)":null,"Source":"","Comments":"","Location 1":"(-19.019585, -65.261961)"},{"_id":46,"Organization":"IDB","Approval date":"2011","Country":"Colombia","Region":"LCR","Project ID":"CO-X1009 ","Project Name":"Catalytic Investments for Geothermal Power","Total Project Cost (US$ milion)":3.77,"Contribution by organization (US$ million)":2.73,"Contribution by Organization (constant 2010 US$ million)":2.67,"Total exploratory phase (constant 2010 US$)":0.73,"Total production phase (constant 2010 US$)":0,"Total TA (constant 2010 US$)":1.94,"Total risk mitigation instruments (constant 2010 US$)":null,"Source":"GEF","Comments":"0.750 in an estimate of the portion for component II (\"estudios de evaluacion del subsuelo\") that actually goes to surface studies, since the EIA,  institutional strengthening and other activities are also included under this $1 million component","Location 1":"(4.598056, -74.075833)"},{"_id":47,"Organization":"IDB","Approval date":"2010","Country":"Colombia","Region":"LCR","Project ID":"CO-T1208 ","Project Name":" Prefeasibility Studies for the Macizo Volcanico del Ruiz Geothermal Field","Total Project Cost (US$ milion)":null,"Contribution by organization (US$ million)":0.9,"Contribution by Organization (constant 2010 US$ million)":0.9,"Total exploratory phase (constant 2010 US$)":0,"Total production phase (constant 2010 US$)":0,"Total TA (constant 2010 US$)":0.9,"Total risk mitigation instruments (constant 2010 US$)":null,"Source":"","Comments":"The TC will finance prefeasibility studies for two selected sited in the Macizo Volcanico del Ruiz area. The TC will provide: (i) a model of the geothermal resource in the two selected sites and its temperature; (ii) identification of the type of geothermal resource concerned and its potential capacity; (iii) recommendations concerning the geothermal resource exploration and development; and (iv) environmental and sociological studies according to the scope of these activities. - No further info on the project, so 100% has been considered to be TA","Location 1":"(4.598056, -74.075833)"},{"_id":48,"Organization":"IDB","Approval date":"1999","Country":"Colombia","Region":"LCR","Project ID":"TC9902009 ","Project Name":" Feasibility Studies Azufral Geothermal","Total Project Cost (US$ milion)":null,"Contribution by organization (US$ million)":0.01,"Contribution by Organization (constant 2010 US$ million)":0.13,"Total exploratory phase (constant 2010 US$)":0,"Total production phase (constant 2010 US$)":0,"Total TA (constant 2010 US$)":0.13,"Total risk mitigation instruments (constant 2010 US$)":null,"Source":"","Comments":"","Location 1":"(4.598056, -74.075833)"},{"_id":49,"Organization":"IDB","Approval date":"1994","Country":"Colombia","Region":"LCR","Project ID":"TC9405079 ","Project Name":"Geothermal Project On Ruiz Volcanic Area","Total Project Cost (US$ milion)":null,"Contribution by organization (US$ million)":0.03,"Contribution by Organization (constant 2010 US$ million)":0.04,"Total exploratory phase (constant 2010 US$)":0,"Total production phase (constant 2010 US$)":0,"Total TA (constant 2010 US$)":0.04,"Total risk mitigation instruments (constant 2010 US$)":null,"Source":"","Comments":"FINANCING OF AN ADVISORY PANNEL TO ANALYSE THE STUDIES ON THE GEOTHERMAL PROJECT ON THE EL RUIZ VOLCANIC AREA.","Location 1":"(4.598056, -74.075833)"},{"_id":50,"Organization":"IDB","Approval date":"1998","Country":"Colombia","Region":"LCR","Project ID":"CR0115","Project Name":"Miravalles III","Total Project Cost (US$ milion)":null,"Contribution by organization (US$ million)":16.5,"Contribution by Organization (constant 2010 US$ million)":21.16,"Total exploratory phase (constant 2010 US$)":0,"Total production phase (constant 2010 US$)":21.16,"Total TA (constant 2010 US$)":0,"Total risk mitigation instruments (constant 2010 US$)":null,"Source":"","Comments":"","Location 1":"(4.598056, -74.075833)"},{"_id":51,"Organization":"IDB","Approval date":"1998","Country":"Costa Rica","Region":"LCR","Project ID":"TC9801011 ","Project Name":"Miravalles III Geothermal Power Plant","Total Project Cost (US$ milion)":null,"Contribution by organization (US$ million)":0.18,"Contribution by Organization (constant 2010 US$ million)":0.23,"Total exploratory phase (constant 2010 US$)":0,"Total production phase (constant 2010 US$)":0,"Total TA (constant 2010 US$)":0.23,"Total risk mitigation instruments (constant 2010 US$)":null,"Source":"","Comments":"","Location 1":"(37.338208, -121.886329)"},{"_id":52,"Organization":"IDB","Approval date":"1996","Country":"Costa Rica","Region":"LCR","Project ID":"CR0096","Project Name":"Proyecto Geotermico Miravalles I","Total Project Cost (US$ milion)":151,"Contribution by organization (US$ million)":74,"Contribution by Organization (constant 2010 US$ million)":97.58,"Total exploratory phase (constant 2010 US$)":0,"Total production phase (constant 2010 US$)":97.58,"Total TA (constant 2010 US$)":0,"Total risk mitigation instruments (constant 2010 US$)":null,"Source":"","Comments":"No details on the project, so it has been assumed that the full credit supported the production phase","Location 1":"(37.338208, -121.886329)"},{"_id":53,"Organization":"IDB","Approval date":"1982","Country":"Costa Rica","Region":"LCR","Project ID":"TC8209159 ","Project Name":" Eval., Operat. of 3 Geothermical Ditchs","Total Project Cost (US$ milion)":null,"Contribution by organization (US$ million)":0.02,"Contribution by Organization (constant 2010 US$ million)":0.04,"Total exploratory phase (constant 2010 US$)":0,"Total production phase (constant 2010 US$)":0,"Total TA (constant 2010 US$)":0.04,"Total risk mitigation instruments (constant 2010 US$)":null,"Source":"","Comments":"","Location 1":"(37.338208, -121.886329)"},{"_id":54,"Organization":"IDB","Approval date":"1980","Country":"Costa Rica","Region":"LCR","Project ID":"CR0072 ","Project Name":"Geothermal Project Miravalles Stage III","Total Project Cost (US$ milion)":null,"Contribution by organization (US$ million)":8.8,"Contribution by Organization (constant 2010 US$ million)":20.03,"Total exploratory phase (constant 2010 US$)":0,"Total production phase (constant 2010 US$)":20.03,"Total TA (constant 2010 US$)":0,"Total risk mitigation instruments (constant 2010 US$)":null,"Source":"","Comments":"No details on the project, so it has been assumed that the full credit supported the production phase","Location 1":"(37.338208, -121.886329)"},{"_id":55,"Organization":"IDB","Approval date":"1977","Country":"Costa Rica","Region":"LCR","Project ID":"CR0031 ","Project Name":"Advantage Energy Geothermal Guanacaste","Total Project Cost (US$ milion)":null,"Contribution by organization (US$ million)":4.1,"Contribution by Organization (constant 2010 US$ million)":11.79,"Total exploratory phase (constant 2010 US$)":0,"Total production phase (constant 2010 US$)":11.79,"Total TA (constant 2010 US$)":0,"Total risk mitigation instruments (constant 2010 US$)":null,"Source":"","Comments":"No details on the project, so it has been assumed that the full credit supported the production phase","Location 1":"(37.338208, -121.886329)"},{"_id":56,"Organization":"IDB","Approval date":"1975","Country":"Costa Rica","Region":"LCR","Project ID":"TC7509055","Project Name":"Geothermal Energy Utilization,guanacaste","Total Project Cost (US$ milion)":null,"Contribution by organization (US$ million)":0.5,"Contribution by Organization (constant 2010 US$ million)":1.61,"Total exploratory phase (constant 2010 US$)":0,"Total production phase (constant 2010 US$)":0,"Total TA (constant 2010 US$)":1.61,"Total risk mitigation instruments (constant 2010 US$)":null,"Source":"","Comments":"No further details on the components of the TC","Location 1":"(37.338208, -121.886329)"},{"_id":57,"Organization":"IDB","Approval date":"1986","Country":"Dominican Republic","Region":"LCR","Project ID":"TC8605109 ","Project Name":"Cr's Coop, Geothermic Project Advisory","Total Project Cost (US$ milion)":null,"Contribution by organization (US$ million)":0.01,"Contribution by Organization (constant 2010 US$ million)":0.02,"Total exploratory phase (constant 2010 US$)":0,"Total production phase (constant 2010 US$)":0,"Total TA (constant 2010 US$)":0.02,"Total risk mitigation instruments (constant 2010 US$)":null,"Source":"","Comments":"","Location 1":"(18.466667, -69.95)"},{"_id":58,"Organization":"IDB","Approval date":"1985","Country":"Dominican Republic","Region":"LCR","Project ID":"TC8503212 ","Project Name":" Evaluation of Geothermical Analysis","Total Project Cost (US$ milion)":null,"Contribution by organization (US$ million)":0.03,"Contribution by Organization (constant 2010 US$ million)":0.05,"Total exploratory phase (constant 2010 US$)":0,"Total production phase (constant 2010 US$)":0,"Total TA (constant 2010 US$)":0.05,"Total risk mitigation instruments (constant 2010 US$)":null,"Source":"","Comments":"","Location 1":"(18.466667, -69.95)"},{"_id":59,"Organization":"IDB","Approval date":"1994","Country":"El Salvador","Region":"LCR","Project ID":"ES0088","Project Name":"Energy Sector Expansion Program","Total Project Cost (US$ milion)":332,"Contribution by organization (US$ million)":159.5,"Contribution by Organization (constant 2010 US$ million)":218.62,"Total exploratory phase (constant 2010 US$)":0,"Total production phase (constant 2010 US$)":212.04,"Total TA (constant 2010 US$)":6.58,"Total risk mitigation instruments (constant 2010 US$)":null,"Source":"Communication from: Alejandro Melandri\nEnergy Lead Specialist\nEnergy Division\nInter-American Development Bank (alejandrome@iadb.org)","Comments":"This Project comprised of several components, three of which were related to geothermal projects or studies.  The first component was to finance the construction of the Berlín I geothermal power plant (55 MW installed capacity) with a cost of US$ 107.9 million.  The second relevant component under this project was the Rehabilitation & stabilization of the Ahuachapan geothermal power plant (34 MW installed capacity): US$ 46.8 million.  Lastly, a feasibility study was carried out for the construction of the Berlín II geothermal power plant which amounted to US$ 4.8 million. All of these components were executed and the aforementioned amounts were disbursed.","Location 1":"(13.69294, -89.218191)"},{"_id":60,"Organization":"IDB","Approval date":"2002","Country":"Guatemala","Region":"LCR","Project ID":"TC0112130 ","Project Name":"Exploitation Geothermal Resources for Electricity Generation Projects","Total Project Cost (US$ milion)":0.415,"Contribution by organization (US$ million)":0.35,"Contribution by Organization (constant 2010 US$ million)":0.42,"Total exploratory phase (constant 2010 US$)":0,"Total production phase (constant 2010 US$)":0,"Total TA (constant 2010 US$)":0.42,"Total risk mitigation instruments (constant 2010 US$)":null,"Source":"","Comments":"Promote the adoption of renewable energy by overcoming physical and institutional barriers to the utilization of geothermal energy through initiatives to increase the competitiveness of this type of energy and the development of a knowledge base and institutional framework that encourages investment in the sector.","Location 1":"(14.613333, -90.535278)"},{"_id":61,"Organization":"IDB","Approval date":"2004","Country":"Honduras","Region":"LCR","Project ID":"HO-T1004","Project Name":"Feasibility Study-Platanares Geothermal Project","Total Project Cost (US$ milion)":null,"Contribution by organization (US$ million)":0.15,"Contribution by Organization (constant 2010 US$ million)":0.17,"Total exploratory phase (constant 2010 US$)":0,"Total production phase (constant 2010 US$)":0,"Total TA (constant 2010 US$)":0.17,"Total risk mitigation instruments (constant 2010 US$)":null,"Source":"","Comments":"No details. The full amount has been assigned to TA activities","Location 1":"(14.0833, -87.2167)"},{"_id":62,"Organization":"IDB","Approval date":"2010","Country":"Mexico","Region":"LCR","Project ID":"ME-T1161 ","Project Name":"Assessment of Geothermal Potential in Mexico","Total Project Cost (US$ milion)":null,"Contribution by organization (US$ million)":0.06,"Contribution by Organization (constant 2010 US$ million)":0.06,"Total exploratory phase (constant 2010 US$)":0,"Total production phase (constant 2010 US$)":0,"Total TA (constant 2010 US$)":0.06,"Total risk mitigation instruments (constant 2010 US$)":null,"Source":"","Comments":"No details. The full amount has been assigned to TA activities","Location 1":"(19.432608, -99.133208)"},{"_id":63,"Organization":"IDB","Approval date":"2010","Country":"Nicaragua","Region":"LCR","Project ID":"NI-L1057 ","Project Name":"San Jacinto-Tizate Geothermal Power Project","Total Project Cost (US$ milion)":216,"Contribution by organization (US$ million)":40,"Contribution by Organization (constant 2010 US$ million)":40,"Total exploratory phase (constant 2010 US$)":0,"Total production phase (constant 2010 US$)":40,"Total TA (constant 2010 US$)":0,"Total risk mitigation instruments (constant 2010 US$)":null,"Source":"","Comments":"Phase 1 of the expansion involves construction of the powerhouse and installation of a 38.8 MW (gross) Fuji steam turbine at a cost of $152.2 million. Phase 2 consists of the drilling of additional production and injection wells, the building of steamfield infrastructure, and installation of an identical 38.8 MW turbine at a total cost of $177 million, including $20 million allocated for cost overruns, as required by the Phase 2 lenders","Location 1":"(12.136389, -86.251389)"},{"_id":64,"Organization":"IDB","Approval date":"1994","Country":"Nicaragua","Region":"LCR","Project ID":"TC9405061 ","Project Name":"Momotombo Geothermal Field -Evaluation","Total Project Cost (US$ milion)":null,"Contribution by organization (US$ million)":0.68,"Contribution by Organization (constant 2010 US$ million)":0.93,"Total exploratory phase (constant 2010 US$)":0.93,"Total production phase (constant 2010 US$)":0,"Total TA (constant 2010 US$)":0,"Total risk mitigation instruments (constant 2010 US$)":null,"Source":"","Comments":"estudios\ngeocientíficos (principalmente en\nvulcanología y petrografía)","Location 1":"(12.136389, -86.251389)"},{"_id":65,"Organization":"IDB","Approval date":"1998","Country":"Panama","Region":"LCR","Project ID":"TC9702491 ","Project Name":"Valle de Antón Geothermal Field (COFAB)","Total Project Cost (US$ milion)":null,"Contribution by organization (US$ million)":1.1,"Contribution by Organization (constant 2010 US$ million)":1.41,"Total exploratory phase (constant 2010 US$)":1.41,"Total production phase (constant 2010 US$)":0,"Total TA (constant 2010 US$)":0,"Total risk mitigation instruments (constant 2010 US$)":null,"Source":"","Comments":"No details. The full amount has been assigned to exploratory activities based on the activities contemplated in a cancelled TC for the same field from 1996","Location 1":"(8.983333, -79.516667)"},{"_id":66,"Organization":"IDB","Approval date":"1983","Country":"Panama","Region":"LCR","Project ID":"TC8211279 ","Project Name":" Prefeasibility, Geothermic Complex","Total Project Cost (US$ milion)":null,"Contribution by organization (US$ million)":1.29,"Contribution by Organization (constant 2010 US$ million)":2.43,"Total exploratory phase (constant 2010 US$)":2.43,"Total production phase (constant 2010 US$)":0,"Total TA (constant 2010 US$)":0,"Total risk mitigation instruments (constant 2010 US$)":null,"Source":"","Comments":"","Location 1":"(8.983333, -79.516667)"},{"_id":67,"Organization":"IDB","Approval date":"1983","Country":"Panama","Region":"LCR","Project ID":"TC8211493 ","Project Name":"Study of Geothermical Inspection","Total Project Cost (US$ milion)":null,"Contribution by organization (US$ million)":0.48,"Contribution by Organization (constant 2010 US$ million)":0.91,"Total exploratory phase (constant 2010 US$)":0,"Total production phase (constant 2010 US$)":0,"Total TA (constant 2010 US$)":0.91,"Total risk mitigation instruments (constant 2010 US$)":null,"Source":"","Comments":"No details. Full amount has been assigned to the TA category","Location 1":"(8.983333, -79.516667)"},{"_id":68,"Organization":"EBRD","Approval date":"2015","Country":"Turkey","Region":"ECA","Project ID":"46809","Project Name":"Geothermal Development Lending Facility/ Early Stage Geothermal Support Framework","Total Project Cost (US$ milion)":328,"Contribution by organization (US$ million)":100,"Contribution by Organization (constant 2010 US$ million)":90.18,"Total exploratory phase (constant 2010 US$)":null,"Total production phase (constant 2010 US$)":90.18,"Total TA (constant 2010 US$)":null,"Total risk mitigation instruments (constant 2010 US$)":null,"Source":"","Comments":"$25 million CTF for exploratory drilling, EBRD $100 million for construction","Location 1":"(39.92077, 32.85411)"},{"_id":69,"Organization":"EBRD","Approval date":"2015","Country":"Turkey","Region":"ECA","Project ID":"44596","Project Name":"EFELER GPP","Total Project Cost (US$ milion)":970,"Contribution by organization (US$ million)":150,"Contribution by Organization (constant 2010 US$ million)":135.27,"Total exploratory phase (constant 2010 US$)":null,"Total production phase (constant 2010 US$)":135.27,"Total TA (constant 2010 US$)":null,"Total risk mitigation instruments (constant 2010 US$)":null,"Source":"","Comments":"Senior loan to Gurmat Elektrik Uretim A.S. (Gurmat Elektrik or the Company) for the development of a greenfield 123.3MW geothermal power plant (GPP) located in the Aydin-Germencik province, in Turkey","Location 1":"(39.92077, 32.85411)"},{"_id":70,"Organization":"CIF","Approval date":"2011","Country":"Kenya","Region":"AFR","Project ID":"","Project Name":"Menengai Geothermal","Total Project Cost (US$ milion)":848,"Contribution by organization (US$ million)":40,"Contribution by Organization (constant 2010 US$ million)":39.19,"Total exploratory phase (constant 2010 US$)":null,"Total production phase (constant 2010 US$)":38.21,"Total TA (constant 2010 US$)":0.98,"Total risk mitigation instruments (constant 2010 US$)":null,"Source":"SREP","Comments":"SREP finances production drilling and capacity building","Location 1":"(-1.292066, 36.821946)"},{"_id":71,"Organization":"CIF","Approval date":"2012","Country":"Ethiopia","Region":"AFR","Project ID":"","Project Name":"Geothermal Sector Development Project","Total Project Cost (US$ milion)":216,"Contribution by organization (US$ million)":26,"Contribution by Organization (constant 2010 US$ million)":25.02,"Total exploratory phase (constant 2010 US$)":null,"Total production phase (constant 2010 US$)":23.58,"Total TA (constant 2010 US$)":1.44,"Total risk mitigation instruments (constant 2010 US$)":null,"Source":"SREP","Comments":"SREP finances drilling consumables for production drilling in Aluto Langano","Location 1":"(8.980603, 38.757761)"},{"_id":72,"Organization":"CIF","Approval date":"2013","Country":"Tanzania","Region":"AFR","Project ID":"","Project Name":"Tanzania geothermal project","Total Project Cost (US$ milion)":536.8,"Contribution by organization (US$ million)":25,"Contribution by Organization (constant 2010 US$ million)":23.71,"Total exploratory phase (constant 2010 US$)":18.97,"Total production phase (constant 2010 US$)":null,"Total TA (constant 2010 US$)":4.74,"Total risk mitigation instruments (constant 2010 US$)":null,"Source":"SREP","Comments":" SREP contributes to geothermal strategy, institutional framework, capacity building, exploration, including test drilling, and advisory services for power project development","Location 1":"(-6.173056, 35.741944)"},{"_id":73,"Organization":"CIF","Approval date":"2013","Country":"Indonesia","Region":"","Project ID":"","Project Name":"Geothermal Projects","Total Project Cost (US$ milion)":4960,"Contribution by organization (US$ million)":325,"Contribution by Organization (constant 2010 US$ million)":308.22,"Total exploratory phase (constant 2010 US$)":47.42,"Total production phase (constant 2010 US$)":189.67,"Total TA (constant 2010 US$)":null,"Total risk mitigation instruments (constant 2010 US$)":71.13,"Source":"CTF","Comments":"$125 million through WB (for production phase), $150 million through ADB (risk reductionto be mostly provided in advanced project stages - split 50/50 between production phase and risk mitigation instruments), $50 million through IFC (to finalize exploration phase)","Location 1":"(-6.208763, 106.845599)"},{"_id":74,"Organization":"CIF","Approval date":"2015","Country":"Turkey","Region":"ECA","Project ID":"","Project Name":"Geothermal Development Lending Facility/ Early Stage Geothermal Support Framework","Total Project Cost (US$ milion)":328,"Contribution by organization (US$ million)":25,"Contribution by Organization (constant 2010 US$ million)":22.55,"Total exploratory phase (constant 2010 US$)":22.55,"Total production phase (constant 2010 US$)":null,"Total TA (constant 2010 US$)":null,"Total risk mitigation instruments (constant 2010 US$)":null,"Source":"DPSP","Comments":"CTF for exploratory drilling, EBRD $100 million for construction","Location 1":"(39.92077, 32.85411)"},{"_id":75,"Organization":"CIF","Approval date":"2015","Country":"Armenia","Region":"ECA","Project ID":"","Project Name":"Geothermal Exploratory Drilling Project","Total Project Cost (US$ milion)":10.68,"Contribution by organization (US$ million)":8.55,"Contribution by Organization (constant 2010 US$ million)":7.71,"Total exploratory phase (constant 2010 US$)":7.26,"Total production phase (constant 2010 US$)":null,"Total TA (constant 2010 US$)":0.45,"Total risk mitigation instruments (constant 2010 US$)":null,"Source":"SREP","Comments":"Plus 300k PPG","Location 1":""},{"_id":76,"Organization":"CIF","Approval date":"2015","Country":"Turkey","Region":"ECA","Project ID":"","Project Name":"Geothermal Development Project","Total Project Cost (US$ milion)":290,"Contribution by organization (US$ million)":40,"Contribution by Organization (constant 2010 US$ million)":0,"Total exploratory phase (constant 2010 US$)":null,"Total production phase (constant 2010 US$)":null,"Total TA (constant 2010 US$)":null,"Total risk mitigation instruments (constant 2010 US$)":null,"Source":"DPSP","Comments":"","Location 1":"(39.92077, 32.85411)"},{"_id":77,"Organization":"CIF","Approval date":"2013","Country":"Mexico","Region":"LCR","Project ID":"","Project Name":"Geothermal Financing and Risk Transfer Facility","Total Project Cost (US$ milion)":1145.7,"Contribution by organization (US$ million)":54.3,"Contribution by Organization (constant 2010 US$ million)":51.5,"Total exploratory phase (constant 2010 US$)":null,"Total production phase (constant 2010 US$)":29.87,"Total TA (constant 2010 US$)":2.66,"Total risk mitigation instruments (constant 2010 US$)":18.97,"Source":"CTF, DPSP","Comments":"$34.3 million from CTF IP ($31.5 million loan, $2.8 million grant) and $20 milion from DPSP (all grant)// IDB contributes 54.3 million and the GoM contributes about $11.5 million","Location 1":"(19.432608, -99.133208)"},{"_id":78,"Organization":"CIF","Approval date":"2013","Country":"Chile","Region":"LCR","Project ID":"","Project Name":"Geothermal Risk Mitigation Facility","Total Project Cost (US$ milion)":null,"Contribution by organization (US$ million)":53,"Contribution by Organization (constant 2010 US$ million)":50.27,"Total exploratory phase (constant 2010 US$)":null,"Total production phase (constant 2010 US$)":null,"Total TA (constant 2010 US$)":2.85,"Total risk mitigation instruments (constant 2010 US$)":47.42,"Source":"CTF, DPSP","Comments":"$33 million from CTF IP ($27.7 million concessional loan/guarantee, $1.048 million grant funding, $1.252 million implementation and suppot services -- for IDB; and $3 million TA implemented by WB ) and $20 million CTF DPSP (concessional loan/ guarantee) -- Solutions could include senior and subordinated long term project loans, short\nterm bridge loans, and guarantees - the full allocation has been assigned to the \"risk mitigation instruments\" category","Location 1":"(-33.46912, -70.641997)"},{"_id":79,"Organization":"IFC","Approval date":"","Country":"Nicaragua","Region":"LCR","Project ID":"27676","Project Name":"San Jacinto","Total Project Cost (US$ milion)":60,"Contribution by organization (US$ million)":60,"Contribution by Organization (constant 2010 US$ million)":60,"Total exploratory phase (constant 2010 US$)":null,"Total production phase (constant 2010 US$)":60,"Total TA (constant 2010 US$)":null,"Total risk mitigation instruments (constant 2010 US$)":null,"Source":"","Comments":"addition of another 72MW of capacity through 2 x 36MW Fuji flash turbines supported by further steam resource development  in the San Jacinto-Tizate geothermal concession covering a 40 km2 area near León, Nicaragua","Location 1":"(12.136389, -86.251389)"},{"_id":80,"Organization":"IFC","Approval date":"","Country":"Philippines","Region":"EAP","Project ID":"25389","Project Name":"PNOC-Energy Development Corporation ","Total Project Cost (US$ milion)":50,"Contribution by organization (US$ million)":50,"Contribution by Organization (constant 2010 US$ million)":53.98,"Total exploratory phase (constant 2010 US$)":null,"Total production phase (constant 2010 US$)":53.98,"Total TA (constant 2010 US$)":null,"Total risk mitigation instruments (constant 2010 US$)":null,"Source":"","Comments":"PNOC-Energy Development Corporation (PNOC-EDC or the company) is an integrated geothermal steam and electric power producer with its core activities being the exploration, development, and production of geothermal energy. The company presently engages private-sector electric power generators to operate geothermal power plants on a build-operate-and transfer (BOT) basis for a specified 10-year concession period. IFC is planning to provide financial support to the company to assist them in their medium term capital expenditure program.","Location 1":"(14.599512, 120.984219)"},{"_id":81,"Organization":"IFC","Approval date":"","Country":"Philippines","Region":"EAP","Project ID":"26529","Project Name":"PNOC-EDC Loan","Total Project Cost (US$ milion)":100,"Contribution by organization (US$ million)":100,"Contribution by Organization (constant 2010 US$ million)":102.65,"Total exploratory phase (constant 2010 US$)":null,"Total production phase (constant 2010 US$)":102.65,"Total TA (constant 2010 US$)":null,"Total risk mitigation instruments (constant 2010 US$)":null,"Source":"","Comments":"The proposed IFC investment will be a $100 million A loan and potentially a $100 million B loan. The proceeds of the loans will be used to partially finance the companys medium term capital expenditure plan.","Location 1":"(14.599512, 120.984219)"},{"_id":82,"Organization":"IFC","Approval date":"","Country":"Philippines","Region":"EAP","Project ID":"29404","Project Name":"Energy Dev II","Total Project Cost (US$ milion)":75,"Contribution by organization (US$ million)":75,"Contribution by Organization (constant 2010 US$ million)":75,"Total exploratory phase (constant 2010 US$)":null,"Total production phase (constant 2010 US$)":75,"Total TA (constant 2010 US$)":null,"Total risk mitigation instruments (constant 2010 US$)":null,"Source":"","Comments":"The proposed IFC investment will be a $75 million A loan and the potential mobilization of another $75M from bilateral sources. The proceeds of the loans will be used to partially finance the companys medium term capital expenditure plan.","Location 1":"(14.599512, 120.984219)"},{"_id":83,"Organization":"IFC","Approval date":"","Country":"Indonesia","Region":"EAP","Project ID":"TBC","Project Name":"Indonesia Geothermal Electricity Finance (IGEF) Program","Total Project Cost (US$ milion)":null,"Contribution by organization (US$ million)":null,"Contribution by Organization (constant 2010 US$ million)":0,"Total exploratory phase (constant 2010 US$)":null,"Total production phase (constant 2010 US$)":null,"Total TA (constant 2010 US$)":null,"Total risk mitigation instruments (constant 2010 US$)":null,"Source":"","Comments":"CTF approved $50 million contribution in December, 2013","Location 1":"(-6.208763, 106.845599)"},{"_id":84,"Organization":"EBRD","Approval date":"2012","Country":"Turkey","Region":"ECA","Project ID":"","Project Name":"Gümüsköy Geothermal Power Plant","Total Project Cost (US$ milion)":46.5,"Contribution by organization (US$ million)":24.9,"Contribution by Organization (constant 2010 US$ million)":23.97,"Total exploratory phase (constant 2010 US$)":null,"Total production phase (constant 2010 US$)":23.97,"Total TA (constant 2010 US$)":null,"Total risk mitigation instruments (constant 2010 US$)":null,"Source":"","Comments":"BM Holding invested up to USD 12m (24% of the total investment costs) in exploration and development prior to financial close, when debt financing of up to USD 34.5m (70% of the total costs) was secured from Yapikredi, a local commercial bank. Yapikredi sourced USD 24.9m of this debt from the Medium Size Sustainable Energy Finance Facility (MidSEFF), an on-lending facility managed by the European Bank for Reconstruction and Development ","Location 1":"(39.92077, 32.85411)"},{"_id":85,"Organization":"EBRD","Approval date":"2012","Country":"Turkey","Region":"ECA","Project ID":"","Project Name":"Gümüsköy Geothermal Power Plant","Total Project Cost (US$ milion)":46.5,"Contribution by organization (US$ million)":24.9,"Contribution by Organization (constant 2010 US$ million)":23.97,"Total exploratory phase (constant 2010 US$)":null,"Total production phase (constant 2010 US$)":23.97,"Total TA (constant 2010 US$)":null,"Total risk mitigation instruments (constant 2010 US$)":null,"Source":"","Comments":"BM Holding invested up to USD 12m (24% of the total investment costs) in exploration and development prior to financial close, when debt financing of up to USD 34.5m (70% of the total costs) was secured from Yapikredi, a local commercial bank. Yapikredi sourced USD 24.9m of this debt from the Medium Size Sustainable Energy Finance Facility (MidSEFF), an on-lending facility managed by the European Bank for Reconstruction and Development (EBRD)","Location 1":"(39.92077, 32.85411)"},{"_id":86,"Organization":"WB","Approval date":"TBD","Country":"Kenya","Region":"AFR","Project ID":"P129910","Project Name":"Menengai Geothermal - \"stopped\" for now","Total Project Cost (US$ milion)":null,"Contribution by organization (US$ million)":null,"Contribution by Organization (constant 2010 US$ million)":0,"Total exploratory phase (constant 2010 US$)":null,"Total production phase (constant 2010 US$)":0,"Total TA (constant 2010 US$)":null,"Total risk mitigation instruments (constant 2010 US$)":null,"Source":"","Comments":"IDA: Steam gathering system, transmission lines and substations, TA - no details on IDA allocation for each component; overall project drilling production wells (not exploratory wells). Other financing sources: SREP: $40 mill. (loan & grant), AfDB: $120 mill. (loan), AFD: 170 mill. (loan), EIB: $37 mill. (loan); GDC/MoE: $ 367 mill. (equity)","Location 1":"(-1.292066, 36.821946)"},{"_id":87,"Organization":"EBRD","Approval date":"2012","Country":"Turkey","Region":"ECA","Project ID":"","Project Name":"Gümüsköy Geothermal Power Plant","Total Project Cost (US$ milion)":46.5,"Contribution by organization (US$ million)":24.9,"Contribution by Organization (constant 2010 US$ million)":null,"Total exploratory phase (constant 2010 US$)":null,"Total production phase (constant 2010 US$)":23.97,"Total TA (constant 2010 US$)":null,"Total risk mitigation instruments (constant 2010 US$)":null,"Source":"","Comments":"BM Holding invested up to USD 12m (24% of the total investment costs) in exploration and development prior to financial close, when debt financing of up to USD 34.5m (70% of the total costs) was secured from Yapikredi, a local commercial bank. Yapikredi sourced USD 24.9m of this debt from the Medium Size Sustainable Energy Finance Facility (MidSEFF), an on-lending facility managed by the European Bank for Reconstruction and Development (EBRD)","Location 1":"(39.92077, 32.85411)"}], "fields": [{"id": "_id", "type": "int"}, {"id": "Organization", "type": "text"}, {"id": "Approval date", "type": "text"}, {"id": "Country", "type": "text"}, {"id": "Region", "type": "text"}, {"id": "Project ID", "type": "text"}, {"id": "Project Name", "type": "text"}, {"id": "Total Project Cost (US$ milion)", "type": "numeric"}, {"id": "Contribution by organization (US$ million)", "type": "numeric"}, {"id": "Contribution by Organization (constant 2010 US$ million)", "type": "numeric"}, {"id": "Total exploratory phase (constant 2010 US$)", "type": "numeric"}, {"id": "Total production phase (constant 2010 US$)", "type": "numeric"}, {"id": "Total TA (constant 2010 US$)", "type": "numeric"}, {"id": "Total risk mitigation instruments (constant 2010 US$)", "type": "numeric"}, {"id": "Source", "type": "text"}, {"id": "Comments", "type": "text"}, {"id": "Location 1", "type": "text"}], "_links": {"start": "/api/3/action/datastore_search?resource_id=56f8f504-8d75-4c2d-9262-edbfc4c601fa", "next": "/api/3/action/datastore_search?resource_id=56f8f504-8d75-4c2d-9262-edbfc4c601fa&offset=100"}, "total": 87, "total_was_estimated": false}}