{"help": "https://energydata.info/en/api/3/action/help_show?name=datastore_search", "success": true, "result": {"include_total": true, "limit": 100, "records_format": "objects", "resource_id": "981527ea-7776-462e-bea0-ffd84b193459", "total_estimation_threshold": null, "records": [{"_id":1,"SERIAL NO":1,"DATE":"1998","REGION":"Greater Accra Region","METRO/MUNICIPAL/DISTRICT":"Accra Metropolitan Assembly","INSTITUTION NAME":"Ministry of Energy","INSTALLED CAPACITY(kW) GRIDCONNECTED":50,"LOCALITY":"Accra","LATITUDE":"05.5514N","LONGITUDE":"000.2008W"},{"_id":2,"SERIAL NO":2,"DATE":"May 2008","REGION":"Greater Accra Region","METRO/MUNICIPAL/DISTRICT":"Accra Metropolitan Assembly","INSTITUTION NAME":"Energy Commission","INSTALLED CAPACITY(kW) GRIDCONNECTED":4.25,"LOCALITY":"Accra","LATITUDE":"05.5975N","LONGITUDE":"000.1829W"},{"_id":3,"SERIAL NO":3,"DATE":"May 2008","REGION":"Ashanti Region","METRO/MUNICIPAL/DISTRICT":"KMA","INSTITUTION NAME":"KNUST","INSTALLED CAPACITY(kW) GRIDCONNECTED":4,"LOCALITY":"Kumasi","LATITUDE":"06.6735N","LONGITUDE":"001.5654W"},{"_id":4,"SERIAL NO":4,"DATE":"March 2012","REGION":"Ashanti Region","METRO/MUNICIPAL/DISTRICT":"KMA","INSTITUTION NAME":"KNUST","INSTALLED CAPACITY(kW) GRIDCONNECTED":20,"LOCALITY":"Kumasi","LATITUDE":"06.6735N","LONGITUDE":"001.5654W"},{"_id":5,"SERIAL NO":5,"DATE":"May 2010","REGION":"Greater Accra Region","METRO/MUNICIPAL/DISTRICT":"Ga East","INSTITUTION NAME":"Valley View University","INSTALLED CAPACITY(kW) GRIDCONNECTED":8.36,"LOCALITY":"Oyibi","LATITUDE":"05.7974N","LONGITUDE":"000.1224W"},{"_id":6,"SERIAL NO":6,"DATE":"May 2010","REGION":"Greater Accra Region","METRO/MUNICIPAL/DISTRICT":"Ga East","INSTITUTION NAME":"Presby Women's Centre","INSTALLED CAPACITY(kW) GRIDCONNECTED":4.18,"LOCALITY":"Abokobi","LATITUDE":"05.7386N","LONGITUDE":"000.2046W"},{"_id":7,"SERIAL NO":7,"DATE":"May 2010","REGION":"Brong Ahafo Region","METRO/MUNICIPAL/DISTRICT":"Kintampo Municipal","INSTITUTION NAME":"Pure Company Ltd","INSTALLED CAPACITY(kW) GRIDCONNECTED":4.18,"LOCALITY":"Benkrom","LATITUDE":"08.7610N","LONGITUDE":"001.4493W"},{"_id":8,"SERIAL NO":8,"DATE":"May 2010","REGION":"Greater Accra Region","METRO/MUNICIPAL/DISTRICT":"Accra Metropolitan Assembly","INSTITUTION NAME":"V. Attafuah - Residence ","INSTALLED CAPACITY(kW) GRIDCONNECTED":4.18,"LOCALITY":"East Airport, Spintex Rd, Accra","LATITUDE":"05.6227N","LONGITUDE":"000.1416W"},{"_id":9,"SERIAL NO":9,"DATE":"May 2010","REGION":"Greater Accra Region","METRO/MUNICIPAL/DISTRICT":"Accra Metropolitan Assembly","INSTITUTION NAME":"V. Adomako - Residence ","INSTALLED CAPACITY(kW) GRIDCONNECTED":4.18,"LOCALITY":"Dzowulu, Accra","LATITUDE":"05.6154N","LONGITUDE":"000.1950W"},{"_id":10,"SERIAL NO":10,"DATE":"Sept 2011","REGION":"Greater Accra Region","METRO/MUNICIPAL/DISTRICT":"Tema","INSTITUTION NAME":"S. Adjei - Residence ","INSTALLED CAPACITY(kW) GRIDCONNECTED":4,"LOCALITY":"Tema","LATITUDE":"05.6431N","LONGITUDE":"000.0151W"},{"_id":11,"SERIAL NO":11,"DATE":"Sept 2011","REGION":"Eastern Region","METRO/MUNICIPAL/DISTRICT":"Akwapim South ","INSTITUTION NAME":"G Mills - Residence ","INSTALLED CAPACITY(kW) GRIDCONNECTED":3.8,"LOCALITY":"Peduase","LATITUDE":"05.8050N","LONGITUDE":"000.1760W"},{"_id":12,"SERIAL NO":12,"DATE":"Nov 2011","REGION":"Greater Accra Region","METRO/MUNICIPAL/DISTRICT":"Ledzokuku","INSTITUTION NAME":"Abdulai -  Residence ","INSTALLED CAPACITY(kW) GRIDCONNECTED":3.29,"LOCALITY":"Tesijriganor","LATITUDE":"05.6413N","LONGITUDE":"000.1343W"},{"_id":13,"SERIAL NO":13,"DATE":"Nov 2011","REGION":"Greater Accra Region","METRO/MUNICIPAL/DISTRICT":"Ga East","INSTITUTION NAME":"Trade Works Company Ltd (Office)","INSTALLED CAPACITY(kW) GRIDCONNECTED":10.575,"LOCALITY":"South Dome","LATITUDE":"05.6491N","LONGITUDE":"000.2506W"},{"_id":14,"SERIAL NO":14,"DATE":"Nov 2011","REGION":"Eastern Region","METRO/MUNICIPAL/DISTRICT":"Asuogyaman","INSTITUTION NAME":"Wienco Gh Ltd ","INSTALLED CAPACITY(kW) GRIDCONNECTED":42.77,"LOCALITY":"Atempoku","LATITUDE":"06.2777N","LONGITUDE":"000.0718E"},{"_id":15,"SERIAL NO":15,"DATE":"Dec 2011","REGION":"Greater Accra Region","METRO/MUNICIPAL/DISTRICT":"Adenta","INSTITUTION NAME":"O Asante - Residence ","INSTALLED CAPACITY(kW) GRIDCONNECTED":0.8,"LOCALITY":"Fafraha-Ashyie","LATITUDE":"05.7357N","LONGITUDE":"000.1465W"},{"_id":16,"SERIAL NO":16,"DATE":"Dec 2011","REGION":"Greater Accra Region","METRO/MUNICIPAL/DISTRICT":"Tema","INSTITUTION NAME":"Dr. George Puplampu Clinic","INSTALLED CAPACITY(kW) GRIDCONNECTED":4,"LOCALITY":"Sakumono","LATITUDE":"05.6304N","LONGITUDE":"000.0751W"},{"_id":17,"SERIAL NO":17,"DATE":"Oct 2012","REGION":"Eastern Region","METRO/MUNICIPAL/DISTRICT":"Akwapim South ","INSTITUTION NAME":"Rita Marley Music Studio","INSTALLED CAPACITY(kW) GRIDCONNECTED":4,"LOCALITY":"Aburi","LATITUDE":"05.8321N","LONGITUDE":"000.18321W"},{"_id":18,"SERIAL NO":18,"DATE":"Oct 2012","REGION":"Greater Accra Region","METRO/MUNICIPAL/DISTRICT":"Ningo Prampram","INSTITUTION NAME":"R. Marley - Residence ","INSTALLED CAPACITY(kW) GRIDCONNECTED":4,"LOCALITY":"Prampram","LATITUDE":"05.7160N","LONGITUDE":"000.1315E"},{"_id":19,"SERIAL NO":19,"DATE":"Oct 2012","REGION":"Greater Accra Region","METRO/MUNICIPAL/DISTRICT":"Tema","INSTITUTION NAME":"R. Tuffour - Residence ","INSTALLED CAPACITY(kW) GRIDCONNECTED":7.6,"LOCALITY":"Sakumono","LATITUDE":"05.6306N","LONGITUDE":"000.0564W"},{"_id":20,"SERIAL NO":20,"DATE":"April 2013","REGION":"Greater Accra Region","METRO/MUNICIPAL/DISTRICT":"Accra Metropolitan Assembly","INSTITUTION NAME":"Noguchi Mem. Institute, Uni. Of Ghana","INSTALLED CAPACITY(kW) GRIDCONNECTED":315,"LOCALITY":"Legon, Accra","LATITUDE":"05.6330N","LONGITUDE":"000.1817W"},{"_id":21,"SERIAL NO":21,"DATE":"May 2013","REGION":"Upper East Region","METRO/MUNICIPAL/DISTRICT":"Kassena Nandani East","INSTITUTION NAME":"Volta River Authority (VRA)","INSTALLED CAPACITY(kW) GRIDCONNECTED":2500,"LOCALITY":"Navrongo","LATITUDE":"10.9234N","LONGITUDE":"001.0550W"},{"_id":22,"SERIAL NO":22,"DATE":"","REGION":"Greater Accra Region","METRO/MUNICIPAL/DISTRICT":"","INSTITUTION NAME":"Residence installed by TW","INSTALLED CAPACITY(kW) GRIDCONNECTED":2.82,"LOCALITY":"Regimanual Estates, Kwabenya","LATITUDE":"","LONGITUDE":""},{"_id":23,"SERIAL NO":23,"DATE":"","REGION":"Greater Accra Region","METRO/MUNICIPAL/DISTRICT":"","INSTITUTION NAME":"Residence installed by TW","INSTALLED CAPACITY(kW) GRIDCONNECTED":5.17,"LOCALITY":"West Legon","LATITUDE":"","LONGITUDE":""},{"_id":24,"SERIAL NO":24,"DATE":"","REGION":"Greater Accra Region","METRO/MUNICIPAL/DISTRICT":"","INSTITUTION NAME":"Residence installed by TW","INSTALLED CAPACITY(kW) GRIDCONNECTED":1.41,"LOCALITY":"","LATITUDE":"","LONGITUDE":""}], "fields": [{"id": "_id", "type": "int"}, {"id": "SERIAL NO", "type": "numeric"}, {"id": "DATE", "type": "text"}, {"id": "REGION", "type": "text"}, {"id": "METRO/MUNICIPAL/DISTRICT", "type": "text"}, {"id": "INSTITUTION NAME", "type": "text"}, {"id": "INSTALLED CAPACITY(kW) GRIDCONNECTED", "type": "numeric"}, {"id": "LOCALITY", "type": "text"}, {"id": "LATITUDE", "type": "text"}, {"id": "LONGITUDE", "type": "text"}], "_links": {"start": "/api/3/action/datastore_search?resource_id=981527ea-7776-462e-bea0-ffd84b193459", "next": "/api/3/action/datastore_search?resource_id=981527ea-7776-462e-bea0-ffd84b193459&offset=100"}, "total": 24, "total_was_estimated": false}}