{"help": "https://energydata.info/en/api/3/action/help_show?name=datastore_search", "success": true, "result": {"include_total": true, "limit": 100, "records_format": "objects", "resource_id": "aad8a5d4-5e5f-4464-b720-e8a882c59957", "total_estimation_threshold": null, "records": [{"_id":1,"Property Name":"Bokoni Mine (Lebowa)","Country":"South Africa","Commodity":"PGM","Type of Work":"Underground","Status":"Producer","Extent of Processing":"refined","Best Reserve Available":"Proven Reserves","reserves_tonnes____000__units":52100,"Reserve Grade":5.13,"Reserve grade Unit":"grams","Current Production":1509924,"Current Production Unit":"grams","unsafe__expected__yearly_production_at_full_capacity":527000,"unsafe__expected__production_at_full_capacity_unit":"ounce","life_of_mine__years_":73,"project_inception__year_":1969,"project_completion__year_":2042,"Company Name":"Anglo American Platinum (49%), Atlatsa Resources (51%)","unsafe__expected___investment__mm__":null,"Probability to move to investment by 2020":"high","power_sourcing_arrangement_or_relationship_between_mine_and_":"Grid supply","Source of power":"On-Grid","energy_consumption__kwh_t_product_":69489780,"annual_energy_consumption__mwh_":1038190,"energy_needs__mw_":108.14,"Shareholding Code":"Join-venture with only private interests","Mine Location":"(-24.3, 29.8666667)","Location notes":null,"Region":"SA","Tariff Public Utility":4,"Cost relativity":"equal tariff","Grid Energy Source":"Mainly Coal Fuelled Generation","Grid Reliability":"0 to 50 days","Source":"Infomine","Notes":"Middelpunt Eskom substation. 17.9M Oz of 4E PGMs over 34 years: 526,470 oz","Reference":"Infomine, Technical Report April 2008 (SEDAR)","Projects Pre-2000":"Yes","Projects 2001-2012":"Yes","Projects 2020":"Yes"},{"_id":2,"Property Name":"Marikana - Lonmin","Country":"South Africa","Commodity":"PGM","Type of Work":"Underground","Status":"Producer","Extent of Processing":"smelted","Best Reserve Available":"Proven & Probable","reserves_tonnes____000__units":293900,"Reserve Grade":4.22,"Reserve grade Unit":"grams","Current Production":760668,"Current Production Unit":"grams","unsafe__expected__yearly_production_at_full_capacity":450000,"unsafe__expected__production_at_full_capacity_unit":"ounce","life_of_mine__years_":168,"project_inception__year_":1969,"project_completion__year_":2137,"Company Name":"Lonmin","unsafe__expected___investment__mm__":null,"Probability to move to investment by 2020":"high","power_sourcing_arrangement_or_relationship_between_mine_and_":"Grid supply","Source of power":"On-Grid","energy_consumption__kwh_t_product_":65962380,"annual_energy_consumption__mwh_":826311,"energy_needs__mw_":86.07,"Shareholding Code":"Sole Ownership by a private company","Mine Location":"(-25.7166667, 27.4333333)","Location notes":null,"Region":"SA","Tariff Public Utility":4,"Cost relativity":"equal tariff","Grid Energy Source":"Mainly Coal Fuelled Generation","Grid Reliability":"0 to 50 days","Source":"Infomine","Notes":"Production and Reserves are for all PGMs. In partnership with Eskom R150 million were invested. LOM calculated using Mineral Resources: 114.4Mt and Mineral Reserves: 37.4Mt in Sept 2011. US$18 million in energy saving projects; aiming to achieve an energy saving of 1.06 Giga Watt per hour (GWh) [across company]. Secure access to sufficient and reliable energy supply from Eskom to support operations and growth plans until at least 2017. Eexploring ways of diversifying electrical supply through the development of renewable projects and continuing to find new ways of improving efficiencies.","Reference":"Infomine, Company Website,  http://www.mineweb.com/mineweb/content/en/mineweb-company-releases?oid=59573&sn=Detail","Projects Pre-2000":"Yes","Projects 2001-2012":"Yes","Projects 2020":"Yes"},{"_id":3,"Property Name":"Mimosa","Country":"Zimbabwe","Commodity":"PGM","Type of Work":"Underground","Status":"Producer","Extent of Processing":"smelted","Best Reserve Available":"Proven and Probable Reserves","reserves_tonnes____000__units":31100,"Reserve Grade":3.74,"Reserve grade Unit":"grams","Current Production":3295413,"Current Production Unit":"grams","unsafe__expected__yearly_production_at_full_capacity":185000,"unsafe__expected__production_at_full_capacity_unit":"ounce","life_of_mine__years_":51,"project_inception__year_":2002,"project_completion__year_":2052,"Company Name":"Aquarius Platinum Ltd. (50.0%), Impala Platinum Holdings Ltd. (50.0%) ","unsafe__expected___investment__mm__":null,"Probability to move to investment by 2020":"high","power_sourcing_arrangement_or_relationship_between_mine_and_":"Grid supply","Source of power":"On-Grid","energy_consumption__kwh_t_product_":65962380,"annual_energy_consumption__mwh_":12203,"energy_needs__mw_":1.27,"Shareholding Code":"Join-venture with only private interests","Mine Location":"(-20.3333333, 29.8166667)","Location notes":null,"Region":"SA","Tariff Public Utility":9.8,"Cost relativity":"equal tariff","Grid Energy Source":"Mainly Coal Fuelled Generation","Grid Reliability":"50 to 100 days","Source":"Infomine","Notes":"Following the agreement between Mimosa and Zesa (the power utility company) reached in late March guaranteeing uninterrupted power supply of 20MW for the next five years, Mimosa has experienced no issues with electricity supply. Platinum miners helped the government power company pay $80 million owed to Mozambique’s supplier Hydro Cahora Bassa of Mozambique.","Reference":"http://www.sundaymail.co.zw/index.php?option=com_content&view=article&id=30153:mimosa-revenues-rise-to-81-million&catid=41:business&Itemid=133,\nhttp://www.newsday.co.zw/2012/11/20/amplats-zim-unit-may-build-new-mine/","Projects Pre-2000":"No","Projects 2001-2012":"Yes","Projects 2020":"Yes"},{"_id":4,"Property Name":"Grootboom","Country":"South Africa","Commodity":"Platinum","Type of Work":"Surface","Status":"Feasibility","Extent of Processing":"refined","Best Reserve Available":"Indicated Reserves","reserves_tonnes____000__units":17692,"Reserve Grade":4.59,"Reserve grade Unit":"grams","Current Production":null,"Current Production Unit":null,"unsafe__expected__yearly_production_at_full_capacity":86000,"unsafe__expected__production_at_full_capacity_unit":"ounce","life_of_mine__years_":7,"project_inception__year_":2013,"project_completion__year_":2020,"Company Name":"Moepi Platinum (26.8%), Platmin (72.4%)","unsafe__expected___investment__mm__":null,"Probability to move to investment by 2020":"high","power_sourcing_arrangement_or_relationship_between_mine_and_":"Grid supply + self-supply backup","Source of power":"On-Site Diesel, On-Grid","energy_consumption__kwh_t_product_":50089080,"annual_energy_consumption__mwh_":122120,"energy_needs__mw_":12.72,"Shareholding Code":"Join-venture with only private interests","Mine Location":"(30.1833333, -24.7833333)","Location notes":null,"Region":"SA","Tariff Public Utility":4,"Cost relativity":"above tariff","Grid Energy Source":"Mainly Coal Fuelled Generation","Grid Reliability":"0 to 50 days","Source":"Infomine","Notes":"2009: Feasibility stage. Temporary Power Supply – Diesel power generation planned for the construction phase (≈1 MVA required). Full production is 3PGE + Au","Reference":"Infomine, Company Website, Technical Report March 2009 (SEDAR)","Projects Pre-2000":"No","Projects 2001-2012":"No","Projects 2020":"Yes"},{"_id":5,"Property Name":"Kalplats","Country":"South Africa","Commodity":"Platinum","Type of Work":"Surface","Status":"Advanced Exploration","Extent of Processing":"refined","Best Reserve Available":"Inferred Resources","reserves_tonnes____000__units":72400,"Reserve Grade":1.56,"Reserve grade Unit":"grams","Current Production":200000,"Current Production Unit":"ounce","unsafe__expected__yearly_production_at_full_capacity":300000,"unsafe__expected__production_at_full_capacity_unit":"ounce","life_of_mine__years_":9,"project_inception__year_":2014,"project_completion__year_":2023,"Company Name":"Platinum Australia 49%; African Rainbow 51%","unsafe__expected___investment__mm__":null,"Probability to move to investment by 2020":"high","power_sourcing_arrangement_or_relationship_between_mine_and_":"Grid supply","Source of power":"On-Grid","energy_consumption__kwh_t_product_":50089080,"annual_energy_consumption__mwh_":426000,"energy_needs__mw_":44.38,"Shareholding Code":"Join-venture with only private interests","Mine Location":"(-26.5, 24.8333333)","Location notes":null,"Region":"SA","Tariff Public Utility":4,"Cost relativity":"equal tariff","Grid Energy Source":"Mainly Coal Fuelled Generation","Grid Reliability":"0 to 50 days","Source":"Infomine","Notes":"Electricity will be obtained from a 132 kva Eskom power grid, approximately at 10 km from the plant.","Reference":"http://upetd.up.ac.za/thesis/available/etd-07102008-080330/unrestricted/dissertation.pdf","Projects Pre-2000":"No","Projects 2001-2012":"No","Projects 2020":"Yes"},{"_id":6,"Property Name":"Marikana - Lonmin","Country":"South Africa","Commodity":"Platinum","Type of Work":"Underground","Status":"Producer","Extent of Processing":"smelted","Best Reserve Available":"Proven & Probable","reserves_tonnes____000__units":293900,"Reserve Grade":4.22,"Reserve grade Unit":"grams","Current Production":1618624,"Current Production Unit":"grams","unsafe__expected__yearly_production_at_full_capacity":750000,"unsafe__expected__production_at_full_capacity_unit":"ounce","life_of_mine__years_":168,"project_inception__year_":1969,"project_completion__year_":2137,"Company Name":"Lonmin Plc.","unsafe__expected___investment__mm__":null,"Probability to move to investment by 2020":"high","power_sourcing_arrangement_or_relationship_between_mine_and_":"Grid supply","Source of power":"On-Grid","energy_consumption__kwh_t_product_":65962380,"annual_energy_consumption__mwh_":1402500,"energy_needs__mw_":146.09,"Shareholding Code":"Sole Ownership by a private company","Mine Location":"(-25.7166667, 27.4333333)","Location notes":null,"Region":"SA","Tariff Public Utility":4,"Cost relativity":"equal tariff","Grid Energy Source":"Mainly Coal Fuelled Generation","Grid Reliability":"0 to 50 days","Source":"Infomine","Notes":"Production and Reserves are for all PGMs. In partnership with Eskom R150 million were invested. LOM calculated using Mineral Resources: 114.4Mt and Mineral Reserves: 37.4Mt in Sept 2011. US$18 million in energy saving projects; aiming to achieve an energy saving of 1.06 Giga Watt per hour (GWh) [across company]. Secure access to sufficient and reliable energy supply from Eskom to support operations and growth plans until at least 2017. Eexploring ways of diversifying electrical supply through the development of renewable projects and continuing to find new ways of improving efficiencies.","Reference":"Infomine, Company Website,  http://www.mineweb.com/mineweb/content/en/mineweb-company-releases?oid=59573&sn=Detail","Projects Pre-2000":"Yes","Projects 2001-2012":"Yes","Projects 2020":"Yes"},{"_id":7,"Property Name":"Mphahlele","Country":"South Africa","Commodity":"Platinum","Type of Work":"Surface","Status":"Feasibility","Extent of Processing":"smelted","Best Reserve Available":"Indicated Reserves","reserves_tonnes____000__units":49538,"Reserve Grade":4.91,"Reserve grade Unit":"grams","Current Production":null,"Current Production Unit":null,"unsafe__expected__yearly_production_at_full_capacity":250000,"unsafe__expected__production_at_full_capacity_unit":"ounce","life_of_mine__years_":17,"project_inception__year_":2013,"project_completion__year_":2030,"Company Name":"Mahube Mining And Exploration (20%), Moepi Platinum (20.7%), Platmin Ltd (54.3%)","unsafe__expected___investment__mm__":430,"Probability to move to investment by 2020":"high","power_sourcing_arrangement_or_relationship_between_mine_and_":"Grid supply","Source of power":"On-Grid","energy_consumption__kwh_t_product_":46561680,"annual_energy_consumption__mwh_":330000,"energy_needs__mw_":34.38,"Shareholding Code":"Join-venture with only private interests","Mine Location":"(-24.4666667, 29.6333333)","Location notes":null,"Region":"SA","Tariff Public Utility":4,"Cost relativity":"equal tariff","Grid Energy Source":"Mainly Coal Fuelled Generation","Grid Reliability":"0 to 50 days","Source":"Infomine","Notes":"Production: 3PGE + Au reached in 2013. The estimated total power requirement for the Mphahlele project for the LoM is 47MW. An application has been submitted to Eskom for a supply of 49MVA. Investment: R4BN at exchange rate beginning of 2009: 430MN USD","Reference":"Infomine, http://www.platmin.com/downloads/tr/CPR_mphahlele_feb09.pdf","Projects Pre-2000":"No","Projects 2001-2012":"No","Projects 2020":"Yes"},{"_id":8,"Property Name":"Tema","Country":"Ghana","Commodity":"Aluminum","Type of Work":"Plant","Status":"Producer","Extent of Processing":"smelted","Best Reserve Available":"None","reserves_tonnes____000__units":null,"Reserve Grade":null,"Reserve grade Unit":null,"Current Production":null,"Current Production Unit":null,"unsafe__expected__yearly_production_at_full_capacity":40000,"unsafe__expected__production_at_full_capacity_unit":"tons","life_of_mine__years_":null,"project_inception__year_":1970,"project_completion__year_":null,"Company Name":"Volta Aluminum Co. Ltd. (Valco) 100%","unsafe__expected___investment__mm__":null,"Probability to move to investment by 2020":"high","power_sourcing_arrangement_or_relationship_between_mine_and_":"Grid supply","Source of power":"On-Grid","energy_consumption__kwh_t_product_":15500,"annual_energy_consumption__mwh_":620000,"energy_needs__mw_":64.58,"Shareholding Code":"Sole Ownership by a private company","Mine Location":null,"Location notes":"Tema","Region":"WA","Tariff Public Utility":11.1,"Cost relativity":"equal tariff","Grid Energy Source":"Mainly Hydro Powered Generation","Grid Reliability":"50 to 100 days","Source":"USGS","Notes":null,"Reference":null,"Projects Pre-2000":"Yes","Projects 2001-2012":"Yes","Projects 2020":"Yes"},{"_id":9,"Property Name":"Mounana","Country":"Gabon","Commodity":"Manganese","Type of Work":"Surface","Status":"Exploration","Extent of Processing":"crushed","Best Reserve Available":"None","reserves_tonnes____000__units":null,"Reserve Grade":null,"Reserve grade Unit":null,"Current Production":null,"Current Production Unit":null,"unsafe__expected__yearly_production_at_full_capacity":200000,"unsafe__expected__production_at_full_capacity_unit":"tons","life_of_mine__years_":50,"project_inception__year_":null,"project_completion__year_":null,"Company Name":"BHP (60%)- Angloamerican (40%)","unsafe__expected___investment__mm__":null,"Probability to move to investment by 2020":"low","power_sourcing_arrangement_or_relationship_between_mine_and_":"Self-supply --> Grid supply","Source of power":"On-site Diesel, On-Grid","energy_consumption__kwh_t_product_":16,"annual_energy_consumption__mwh_":3200,"energy_needs__mw_":0.33,"Shareholding Code":null,"Mine Location":"(-1.4333333, 13.15)","Location notes":null,"Region":"CA","Tariff Public Utility":16.2,"Cost relativity":"above tariff","Grid Energy Source":"Mainly Hydro Powered Generation","Grid Reliability":"0 to 50 days","Source":"WB","Notes":"Hydroprojects seeems to be planned to serve the mines (EIA)","Reference":"WB","Projects Pre-2000":"No","Projects 2001-2012":"No","Projects 2020":"Yes"},{"_id":10,"Property Name":"Mamatwan","Country":"South Africa","Commodity":"Manganese","Type of Work":"Open-Pit/Underground","Status":"Producer","Extent of Processing":"crushed","Best Reserve Available":"Combined Resources","reserves_tonnes____000__units":121000,"Reserve Grade":36.95,"Reserve grade Unit":"%","Current Production":3500000,"Current Production Unit":"tons","unsafe__expected__yearly_production_at_full_capacity":3500000,"unsafe__expected__production_at_full_capacity_unit":"tons","life_of_mine__years_":67,"project_inception__year_":1964,"project_completion__year_":2031,"Company Name":"Anglo American (29.6%), Bhp's Samancor (44.4%), Bee (27%)","unsafe__expected___investment__mm__":null,"Probability to move to investment by 2020":"high","power_sourcing_arrangement_or_relationship_between_mine_and_":"Grid supply","Source of power":"On-Grid","energy_consumption__kwh_t_product_":30,"annual_energy_consumption__mwh_":105000,"energy_needs__mw_":10.94,"Shareholding Code":"Join-venture with only private interests","Mine Location":"(-27.3833333, 22.9833333)","Location notes":null,"Region":"SA","Tariff Public Utility":4,"Cost relativity":"equal tariff","Grid Energy Source":"Mainly Coal Fuelled Generation","Grid Reliability":"0 to 50 days","Source":"Infomine","Notes":null,"Reference":null,"Projects Pre-2000":"Yes","Projects 2001-2012":"Yes","Projects 2020":"Yes"},{"_id":11,"Property Name":"Moanda/ Eramet Manganese","Country":"Gabon","Commodity":"Manganese","Type of Work":"Plant","Status":"Producer","Extent of Processing":"smelted","Best Reserve Available":"None","reserves_tonnes____000__units":null,"Reserve Grade":null,"Reserve grade Unit":null,"Current Production":null,"Current Production Unit":null,"unsafe__expected__yearly_production_at_full_capacity":20000,"unsafe__expected__production_at_full_capacity_unit":"tons","life_of_mine__years_":100,"project_inception__year_":2014,"project_completion__year_":null,"Company Name":"Eramet","unsafe__expected___investment__mm__":200,"Probability to move to investment by 2020":"high","power_sourcing_arrangement_or_relationship_between_mine_and_":"Grid supply","Source of power":"On-Grid","energy_consumption__kwh_t_product_":2516,"annual_energy_consumption__mwh_":50320,"energy_needs__mw_":5.24,"Shareholding Code":"Sole Ownership by a private company","Mine Location":"(-1.5, 13.25)","Location notes":null,"Region":"CA","Tariff Public Utility":16.2,"Cost relativity":"equal tariff","Grid Energy Source":"Mainly Hydro Powered Generation","Grid Reliability":"0 to 50 days","Source":"Infomine","Notes":"The future Metallurgical Complex of COMILOG is a 67%-held ERAMET subsidiary based in Moanda (Gabon). The project consists of a silicomanganese plant with 65,000 ton annual capacity and a 20,000 ton per year manganese metal plant.\nThe Complex will benefit from the Gabonese government's development of a new hydroelectric plant as part of the upgrading of the national electricity grid. Capital expenditure for the Moanda Metallurgical Complex will total €200 million, if all the required conditions are met.","Reference":"http://en.gabonews.com/economy/items/moanda-metallurgical-complex-1187.html","Projects Pre-2000":"No","Projects 2001-2012":"No","Projects 2020":"Yes"},{"_id":12,"Property Name":"Shangani","Country":"Zimbabwe","Commodity":"Nickel","Type of Work":"Underground","Status":"Temporary Suspension","Extent of Processing":"refined","Best Reserve Available":"Indicated Reserves","reserves_tonnes____000__units":6030,"Reserve Grade":0.47,"Reserve grade Unit":"%","Current Production":null,"Current Production Unit":null,"unsafe__expected__yearly_production_at_full_capacity":960,"unsafe__expected__production_at_full_capacity_unit":"tons","life_of_mine__years_":null,"project_inception__year_":2007,"project_completion__year_":2009,"Company Name":"Mwana Africa Plc (100%)","unsafe__expected___investment__mm__":null,"Probability to move to investment by 2020":"low","power_sourcing_arrangement_or_relationship_between_mine_and_":"Grid supply","Source of power":"On-Grid","energy_consumption__kwh_t_product_":10700,"annual_energy_consumption__mwh_":10272,"energy_needs__mw_":1.07,"Shareholding Code":"Sole Ownership by a private company","Mine Location":"(-19.6666667, 29.25)","Location notes":null,"Region":"SA","Tariff Public Utility":9.8,"Cost relativity":"equal tariff","Grid Energy Source":"Mainly Coal Fuelled Generation","Grid Reliability":"50 to 100 days","Source":"Infomine","Notes":null,"Reference":"Infomine, http://www.mwanaafrica.com/operations-and-exploration/zimbabwe/bindura-nickel-corp-bnc","Projects Pre-2000":"No","Projects 2001-2012":"Yes","Projects 2020":"No"},{"_id":13,"Property Name":"Two Rivers","Country":"South Africa","Commodity":"Ruthenium","Type of Work":"Underground","Status":"Producer","Extent of Processing":"refined","Best Reserve Available":"None","reserves_tonnes____000__units":null,"Reserve Grade":null,"Reserve grade Unit":null,"Current Production":1287559,"Current Production Unit":"grams","unsafe__expected__yearly_production_at_full_capacity":41000,"unsafe__expected__production_at_full_capacity_unit":"ounce","life_of_mine__years_":20,"project_inception__year_":2006,"project_completion__year_":2026,"Company Name":"African Rainbow Minerals Limited( 55%), Impala Platinum Holdings (45%)","unsafe__expected___investment__mm__":250,"Probability to move to investment by 2020":"high","power_sourcing_arrangement_or_relationship_between_mine_and_":"Grid supply","Source of power":"On-Grid","energy_consumption__kwh_t_product_":69489780,"annual_energy_consumption__mwh_":80770,"energy_needs__mw_":8.41,"Shareholding Code":"Join-venture with only private interests","Mine Location":"(-24.9166667, 30.1)","Location notes":null,"Region":"SA","Tariff Public Utility":4,"Cost relativity":"equal tariff","Grid Energy Source":"Mainly Coal Fuelled Generation","Grid Reliability":"0 to 50 days","Source":"Infomine","Notes":null,"Reference":null,"Projects Pre-2000":"No","Projects 2001-2012":"Yes","Projects 2020":"Yes"},{"_id":14,"Property Name":"Sega (Seguenega)","Country":"Burkina Faso","Commodity":"Gold","Type of Work":"Surface","Status":"Advanced Exploration","Extent of Processing":"refined","Best Reserve Available":"Indicated Reserves","reserves_tonnes____000__units":6595,"Reserve Grade":1.65,"Reserve grade Unit":"grams","Current Production":null,"Current Production Unit":null,"unsafe__expected__yearly_production_at_full_capacity":81000,"unsafe__expected__production_at_full_capacity_unit":"ounce","life_of_mine__years_":2,"project_inception__year_":2015,"project_completion__year_":2017,"Company Name":"Amara Mining Plc (100%)","unsafe__expected___investment__mm__":null,"Probability to move to investment by 2020":"closed by 2020","power_sourcing_arrangement_or_relationship_between_mine_and_":"Self-supply","Source of power":"On-site Diesel","energy_consumption__kwh_t_product_":25000000,"annual_energy_consumption__mwh_":57408,"energy_needs__mw_":5.98,"Shareholding Code":"Sole Ownership by a private company","Mine Location":"(13.3833333, -1.9666667)","Location notes":null,"Region":"WA","Tariff Public Utility":26,"Cost relativity":"above tariff","Grid Energy Source":"Mainly Oil Fuelled Generation","Grid Reliability":"0 to 50 days","Source":"Infomine","Notes":"Power cost: $1.31/t. Expansion of Kalsaka project","Reference":"Infomine, Company Website","Projects Pre-2000":"No","Projects 2001-2012":"No","Projects 2020":"No"},{"_id":15,"Property Name":"Megamine","Country":"South Africa","Commodity":"Gold","Type of Work":"Surface","Status":"Development","Extent of Processing":"refined","Best Reserve Available":"Indicated Reserves","reserves_tonnes____000__units":21550,"Reserve Grade":4.36,"Reserve grade Unit":"grams","Current Production":123179,"Current Production Unit":"ounce","unsafe__expected__yearly_production_at_full_capacity":123179,"unsafe__expected__production_at_full_capacity_unit":"ounce","life_of_mine__years_":null,"project_inception__year_":2013,"project_completion__year_":null,"Company Name":"Gold One 100%","unsafe__expected___investment__mm__":562,"Probability to move to investment by 2020":"high","power_sourcing_arrangement_or_relationship_between_mine_and_":"Grid supply","Source of power":"On-Grid","energy_consumption__kwh_t_product_":25000000,"annual_energy_consumption__mwh_":87302,"energy_needs__mw_":9.09,"Shareholding Code":"Sole Ownership by a private company","Mine Location":null,"Location notes":null,"Region":"SA","Tariff Public Utility":4,"Cost relativity":"equal tariff","Grid Energy Source":"Mainly Coal Fuelled Generation","Grid Reliability":"0 to 50 days","Source":"Infomine","Notes":null,"Reference":null,"Projects Pre-2000":"No","Projects 2001-2012":"No","Projects 2020":"Yes"},{"_id":16,"Property Name":"Mwanza","Country":"Tanzania","Commodity":"Gold","Type of Work":"Underground","Status":"Exploration","Extent of Processing":"refined","Best Reserve Available":"Inferred Resources","reserves_tonnes____000__units":3300,"Reserve Grade":null,"Reserve grade Unit":null,"Current Production":null,"Current Production Unit":null,"unsafe__expected__yearly_production_at_full_capacity":200000,"unsafe__expected__production_at_full_capacity_unit":"ounce","life_of_mine__years_":null,"project_inception__year_":2016,"project_completion__year_":null,"Company Name":"Tembo Gold","unsafe__expected___investment__mm__":null,"Probability to move to investment by 2020":"high","power_sourcing_arrangement_or_relationship_between_mine_and_":"Self-supply","Source of power":"On-site HFO","energy_consumption__kwh_t_product_":45000000,"annual_energy_consumption__mwh_":255145,"energy_needs__mw_":26.58,"Shareholding Code":"Sole Ownership by a private company","Mine Location":null,"Location notes":"Next to Bulyanhulu mine","Region":"EA","Tariff Public Utility":5.3,"Cost relativity":"above tariff","Grid Energy Source":"Mainly Hydro Powered Generation","Grid Reliability":"50 to 100 days","Source":"WB","Notes":"Power assumed","Reference":null,"Projects Pre-2000":"No","Projects 2001-2012":"No","Projects 2020":"Yes"},{"_id":17,"Property Name":"Moanda/ Eramet Manganese","Country":"Gabon","Commodity":"Manganese","Type of Work":"Open-Pit","Status":"Producer","Extent of Processing":"crushed","Best Reserve Available":"None","reserves_tonnes____000__units":null,"Reserve Grade":null,"Reserve grade Unit":null,"Current Production":3400000,"Current Production Unit":"tons","unsafe__expected__yearly_production_at_full_capacity":3400000,"unsafe__expected__production_at_full_capacity_unit":"tons","life_of_mine__years_":100,"project_inception__year_":2005,"project_completion__year_":2105,"Company Name":"Eramet","unsafe__expected___investment__mm__":90,"Probability to move to investment by 2020":"high","power_sourcing_arrangement_or_relationship_between_mine_and_":"Grid supply","Source of power":"On-Grid","energy_consumption__kwh_t_product_":16,"annual_energy_consumption__mwh_":54400,"energy_needs__mw_":5.67,"Shareholding Code":"Sole Ownership by a private company","Mine Location":"(-1.5, 13.25)","Location notes":null,"Region":"CA","Tariff Public Utility":16.2,"Cost relativity":"equal tariff","Grid Energy Source":"Mainly Hydro Powered Generation","Grid Reliability":"0 to 50 days","Source":"Infomine","Notes":null,"Reference":"Infomine, Company Website","Projects Pre-2000":"No","Projects 2001-2012":"Yes","Projects 2020":"Yes"},{"_id":18,"Property Name":"Akanani Project","Country":"South Africa","Commodity":"Platinum","Type of Work":"Surface","Status":"Exploration","Extent of Processing":"refined","Best Reserve Available":"Inferred Resources","reserves_tonnes____000__units":176600,"Reserve Grade":3.96,"Reserve grade Unit":"grams","Current Production":null,"Current Production Unit":null,"unsafe__expected__yearly_production_at_full_capacity":250000,"unsafe__expected__production_at_full_capacity_unit":"ounce","life_of_mine__years_":42,"project_inception__year_":2014,"project_completion__year_":2056,"Company Name":"Lonmin Plc. (74% Held Through Acquisition Of Afriore), Black Economic Empowerment (26%)","unsafe__expected___investment__mm__":650,"Probability to move to investment by 2020":"high","power_sourcing_arrangement_or_relationship_between_mine_and_":"Grid supply","Source of power":"On-Grid","energy_consumption__kwh_t_product_":50089080,"annual_energy_consumption__mwh_":355000,"energy_needs__mw_":36.98,"Shareholding Code":"Join-venture with only private interests","Mine Location":"(-24.0166667, 28.9166667)","Location notes":null,"Region":"SA","Tariff Public Utility":4,"Cost relativity":"equal tariff","Grid Energy Source":"Mainly Coal Fuelled Generation","Grid Reliability":"0 to 50 days","Source":"Infomine","Notes":"500,000 oz for initial capacity for PGMs;  2004 Prospecting Permit; 10.9MN Platinum reserves (Measured, Indicated, Inferred)-44 years; grid-technical report","Reference":"Infomine, Technical Report Nov 2006 (SEDAR),  http://www.miningmx.com/page/news/platinum_group_metals/821377-Lonmin-studies-potential-650000-oz-mine#.UPyah_L1GSo","Projects Pre-2000":"No","Projects 2001-2012":"No","Projects 2020":"Yes"},{"_id":19,"Property Name":"Booysendal","Country":"South Africa","Commodity":"Platinum","Type of Work":"Underground","Status":"Development","Extent of Processing":"refined","Best Reserve Available":"Indicated Reserves","reserves_tonnes____000__units":161370,"Reserve Grade":4.33,"Reserve grade Unit":"grams","Current Production":null,"Current Production Unit":null,"unsafe__expected__yearly_production_at_full_capacity":160000,"unsafe__expected__production_at_full_capacity_unit":"ounce","life_of_mine__years_":50,"project_inception__year_":2013,"project_completion__year_":2061,"Company Name":"Aquarius Platinum","unsafe__expected___investment__mm__":1100,"Probability to move to investment by 2020":"high","power_sourcing_arrangement_or_relationship_between_mine_and_":"Grid supply + self-supply backup","Source of power":"On-Site HFO, On-Grid","energy_consumption__kwh_t_product_":69489780,"annual_energy_consumption__mwh_":315200,"energy_needs__mw_":32.83,"Shareholding Code":"Sole Ownership by a private company","Mine Location":"(-25.1, 30.1166667)","Location notes":null,"Region":"SA","Tariff Public Utility":4,"Cost relativity":"above tariff","Grid Energy Source":"Mainly Coal Fuelled Generation","Grid Reliability":"0 to 50 days","Source":"Infomine","Notes":"Full production is of 3PGE+Au (2250000 t); full production is 50 years plus. Looking into alternative sources of energy. Investment was R7.1MN (used end of 2010 exchange rate). 5MW power available for construction; permanent power currently\nbeing installed. 5MW self generation power in place. Hot commissioning is dependent on the availability of permanent Eskom power which has been delayed following an invasion of land over which the powerline is routed. Northam and Eskom are working together to resolve the difficulties associated with access to and construction of the powerline over an Eskom servitude east of the mine. ","Reference":"Infomine, Mining Weekly, Company Website","Projects Pre-2000":"No","Projects 2001-2012":"No","Projects 2020":"Yes"},{"_id":20,"Property Name":"Lauzoua Mine","Country":"Ivory Coast","Commodity":"Manganese","Type of Work":"Open-Pit","Status":"Prefeasibility","Extent of Processing":"smelted","Best Reserve Available":"None","reserves_tonnes____000__units":null,"Reserve Grade":null,"Reserve grade Unit":null,"Current Production":null,"Current Production Unit":null,"unsafe__expected__yearly_production_at_full_capacity":50000,"unsafe__expected__production_at_full_capacity_unit":"tons","life_of_mine__years_":null,"project_inception__year_":2017,"project_completion__year_":null,"Company Name":"China National Geological And Mining (39'%), Societe Pour Le Development Minier De La Cote D'ivoire (51% )- 10% Private Interest","unsafe__expected___investment__mm__":null,"Probability to move to investment by 2020":"low","power_sourcing_arrangement_or_relationship_between_mine_and_":"Grid supply","Source of power":"On-Grid","energy_consumption__kwh_t_product_":2516,"annual_energy_consumption__mwh_":125800,"energy_needs__mw_":13.1,"Shareholding Code":"Joint- venture with State Equity","Mine Location":"(5.2666667, -5.5166667)","Location notes":null,"Region":"WA","Tariff Public Utility":11.9,"Cost relativity":"equal tariff","Grid Energy Source":"Mainly Gas Powered Generation","Grid Reliability":"0 to 50 days","Source":"Infomine","Notes":"Processing plant was to be built for ferro manganese - so the project was divided into 2 lines : 1 for crushed manganese that has already started and 1 for ferromanganese that hasn’t started - the ferromanganese project is considered of low probability ","Reference":null,"Projects Pre-2000":"No","Projects 2001-2012":"No","Projects 2020":"Yes"},{"_id":21,"Property Name":"Lauzoua Mine","Country":"Ivory Coast","Commodity":"Manganese","Type of Work":"Open-Pit","Status":"Producer","Extent of Processing":"crushed","Best Reserve Available":"None","reserves_tonnes____000__units":null,"Reserve Grade":40,"Reserve grade Unit":"%","Current Production":150000,"Current Production Unit":"tons","unsafe__expected__yearly_production_at_full_capacity":300000,"unsafe__expected__production_at_full_capacity_unit":"tons","life_of_mine__years_":null,"project_inception__year_":2009,"project_completion__year_":null,"Company Name":"China National Geological And Mining (39'%), Societe Pour Le Development Minier De La Cote D'ivoire (51% )- 10% Private Interest","unsafe__expected___investment__mm__":null,"Probability to move to investment by 2020":"high","power_sourcing_arrangement_or_relationship_between_mine_and_":"Grid supply","Source of power":"On-Grid","energy_consumption__kwh_t_product_":16,"annual_energy_consumption__mwh_":4800,"energy_needs__mw_":0.5,"Shareholding Code":"Joint- venture with State Equity","Mine Location":"(5.2666667, -5.5166667)","Location notes":null,"Region":"WA","Tariff Public Utility":11.9,"Cost relativity":"equal tariff","Grid Energy Source":"Mainly Gas Powered Generation","Grid Reliability":"0 to 50 days","Source":"Infomine","Notes":null,"Reference":null,"Projects Pre-2000":"No","Projects 2001-2012":"Yes","Projects 2020":"Yes"},{"_id":22,"Property Name":"Avontuur Manganese Project","Country":"South Africa","Commodity":"Manganese","Type of Work":"Surface","Status":"Feasibility","Extent of Processing":"crushed","Best Reserve Available":"Combined Resources","reserves_tonnes____000__units":147800,"Reserve Grade":38.2,"Reserve grade Unit":"%","Current Production":null,"Current Production Unit":null,"unsafe__expected__yearly_production_at_full_capacity":1500000,"unsafe__expected__production_at_full_capacity_unit":"tons","life_of_mine__years_":17,"project_inception__year_":2015,"project_completion__year_":2032,"Company Name":"Aquila Resources Ltd(74%), Bee (27%)","unsafe__expected___investment__mm__":null,"Probability to move to investment by 2020":"high","power_sourcing_arrangement_or_relationship_between_mine_and_":"Grid supply","Source of power":"On-Grid","energy_consumption__kwh_t_product_":16,"annual_energy_consumption__mwh_":24000,"energy_needs__mw_":2.5,"Shareholding Code":"Join-venture with only private interests","Mine Location":null,"Location notes":"75 Km NW of KURUMAN","Region":"SA","Tariff Public Utility":4,"Cost relativity":"equal tariff","Grid Energy Source":"Mainly Coal Fuelled Generation","Grid Reliability":"0 to 50 days","Source":"Infomine","Notes":null,"Reference":"Infomine, Company Website","Projects Pre-2000":"No","Projects 2001-2012":"No","Projects 2020":"Yes"},{"_id":23,"Property Name":"Shamva And Howe Mine","Country":"Zimbabwe","Commodity":"Gold","Type of Work":"Surface","Status":"Producer","Extent of Processing":"refined","Best Reserve Available":"None","reserves_tonnes____000__units":null,"Reserve Grade":null,"Reserve grade Unit":null,"Current Production":150000,"Current Production Unit":"ounce","unsafe__expected__yearly_production_at_full_capacity":150000,"unsafe__expected__production_at_full_capacity_unit":"ounce","life_of_mine__years_":null,"project_inception__year_":null,"project_completion__year_":2025,"Company Name":"Metallon","unsafe__expected___investment__mm__":50,"Probability to move to investment by 2020":"high","power_sourcing_arrangement_or_relationship_between_mine_and_":"Grid supply","Source of power":"On-Grid","energy_consumption__kwh_t_product_":25000000,"annual_energy_consumption__mwh_":106311,"energy_needs__mw_":11.07,"Shareholding Code":"Sole Ownership by a private company","Mine Location":"(-17.3166667, 31.5666667)","Location notes":null,"Region":"SA","Tariff Public Utility":9.8,"Cost relativity":"equal tariff","Grid Energy Source":"Mainly Coal Fuelled Generation","Grid Reliability":"50 to 100 days","Source":"Infomine","Notes":null,"Reference":null,"Projects Pre-2000":"No","Projects 2001-2012":"No","Projects 2020":"Yes"},{"_id":24,"Property Name":"Nchwaning","Country":"South Africa","Commodity":"Manganese","Type of Work":"Underground","Status":"Producer","Extent of Processing":"crushed","Best Reserve Available":"Proved & Probable Resources","reserves_tonnes____000__units":110340,"Reserve Grade":43.91,"Reserve grade Unit":"%","Current Production":2350000,"Current Production Unit":"tons","unsafe__expected__yearly_production_at_full_capacity":3500000,"unsafe__expected__production_at_full_capacity_unit":"tons","life_of_mine__years_":53,"project_inception__year_":1972,"project_completion__year_":2025,"Company Name":"African Rainbow Minerals (50%), Assore Limited (50%)","unsafe__expected___investment__mm__":null,"Probability to move to investment by 2020":"high","power_sourcing_arrangement_or_relationship_between_mine_and_":"Grid supply","Source of power":"On-Grid","energy_consumption__kwh_t_product_":30,"annual_energy_consumption__mwh_":105000,"energy_needs__mw_":10.94,"Shareholding Code":"Join-venture with only private interests","Mine Location":"(-27.1333333, 22.8333333)","Location notes":null,"Region":"SA","Tariff Public Utility":4,"Cost relativity":"equal tariff","Grid Energy Source":"Mainly Coal Fuelled Generation","Grid Reliability":"0 to 50 days","Source":"Infomine","Notes":null,"Reference":"Infomine, Mining Weekly","Projects Pre-2000":"Yes","Projects 2001-2012":"Yes","Projects 2020":"Yes"},{"_id":25,"Property Name":"Dutwa","Country":"Tanzania","Commodity":"Nickel","Type of Work":"Underground","Status":"Prefeasibility","Extent of Processing":"intermediate","Best Reserve Available":"Indicated Reserves","reserves_tonnes____000__units":46200,"Reserve Grade":0.93,"Reserve grade Unit":"%","Current Production":null,"Current Production Unit":null,"unsafe__expected__yearly_production_at_full_capacity":27000,"unsafe__expected__production_at_full_capacity_unit":"tons","life_of_mine__years_":20,"project_inception__year_":2016,"project_completion__year_":2036,"Company Name":"African Eagle Resources Plc (100%)","unsafe__expected___investment__mm__":null,"Probability to move to investment by 2020":"low","power_sourcing_arrangement_or_relationship_between_mine_and_":"Grid supply + self-supply backup","Source of power":"On-site HFO, On-Grid","energy_consumption__kwh_t_product_":6600,"annual_energy_consumption__mwh_":178200,"energy_needs__mw_":18.56,"Shareholding Code":"Sole Ownership by a private company","Mine Location":"(-2.5, 33.85)","Location notes":null,"Region":"EA","Tariff Public Utility":5.3,"Cost relativity":"above tariff","Grid Energy Source":"Mainly Hydro Powered Generation","Grid Reliability":"50 to 100 days","Source":"Infomine","Notes":"A major powerline is 20km from the Project and cogeneration will be available from the acid plant. Heavy fuel oil is also a possible alternative.","Reference":"http://www.africaneagle.co.uk/dutwa-infrastructure.asp","Projects Pre-2000":"No","Projects 2001-2012":"No","Projects 2020":"Yes"},{"_id":26,"Property Name":"Bafokeng Rasimone","Country":"South Africa","Commodity":"Palladium","Type of Work":"Underground","Status":"Producer","Extent of Processing":"refined","Best Reserve Available":"Indicated Reserves","reserves_tonnes____000__units":72400,"Reserve Grade":12.13,"Reserve grade Unit":"grams","Current Production":2143024,"Current Production Unit":"grams","unsafe__expected__yearly_production_at_full_capacity":65500,"unsafe__expected__production_at_full_capacity_unit":"ounce","life_of_mine__years_":65,"project_inception__year_":1997,"project_completion__year_":2062,"Company Name":"Royal Bafokeng Holdings (67%), Anglo American Platinum (33%)","unsafe__expected___investment__mm__":220,"Probability to move to investment by 2020":"high","power_sourcing_arrangement_or_relationship_between_mine_and_":"Grid supply --> Mines serve as anchor demand for IPP","Source of power":"On-Grid, IPP","energy_consumption__kwh_t_product_":69489780,"annual_energy_consumption__mwh_":129035,"energy_needs__mw_":13.44,"Shareholding Code":"Join-venture with only private interests","Mine Location":"(-25.4, 27.1)","Location notes":null,"Region":"SA","Tariff Public Utility":4,"Cost relativity":"above tariff","Grid Energy Source":"Mainly Coal Fuelled Generation","Grid Reliability":"0 to 50 days","Source":"Infomine","Notes":"The mining group aims to conclude a 25-year power purchase agreement with the eventual developer, with an option for Anglo American to extend the term. [starting 2015]. It needs to provide technical conditions for power generated in Witbank to be used in Rustenburg.  Site established at Boschkoppie (1997); off-take agreement was concluded with Rustenburg Refineries for the sale of the BRPM JV concentrate. Proportion based on 2009 production (250,000 oz PGMs)","Reference":"Infomine, Mining Weekly","Projects Pre-2000":"Yes","Projects 2001-2012":"Yes","Projects 2020":"Yes"},{"_id":27,"Property Name":"Two Rivers","Country":"South Africa","Commodity":"Platinum","Type of Work":"Underground","Status":"Producer","Extent of Processing":"refined","Best Reserve Available":"Indicated Reserves","reserves_tonnes____000__units":42550,"Reserve Grade":3.75,"Reserve grade Unit":"grams","Current Production":4519000,"Current Production Unit":"grams","unsafe__expected__yearly_production_at_full_capacity":145000,"unsafe__expected__production_at_full_capacity_unit":"ounce","life_of_mine__years_":20,"project_inception__year_":2006,"project_completion__year_":2026,"Company Name":"African Rainbow Minerals Limited( 55%), Impala Platinum Holdings (45%)","unsafe__expected___investment__mm__":250,"Probability to move to investment by 2020":"high","power_sourcing_arrangement_or_relationship_between_mine_and_":"Grid supply","Source of power":"On-Grid","energy_consumption__kwh_t_product_":69489780,"annual_energy_consumption__mwh_":285650,"energy_needs__mw_":29.76,"Shareholding Code":"Join-venture with only private interests","Mine Location":"(-24.9166667, 30.1)","Location notes":null,"Region":"SA","Tariff Public Utility":4,"Cost relativity":"equal tariff","Grid Energy Source":"Mainly Coal Fuelled Generation","Grid Reliability":"0 to 50 days","Source":"Infomine","Notes":null,"Reference":"Infomine, Company Website","Projects Pre-2000":"No","Projects 2001-2012":"Yes","Projects 2020":"Yes"},{"_id":28,"Property Name":"Kwale","Country":"Kenya","Commodity":"Rutile","Type of Work":"Placer","Status":"Development","Extent of Processing":"intermediate","Best Reserve Available":"Proven Reserves","reserves_tonnes____000__units":38230,"Reserve Grade":0.9,"Reserve grade Unit":"%","Current Production":null,"Current Production Unit":null,"unsafe__expected__yearly_production_at_full_capacity":79000,"unsafe__expected__production_at_full_capacity_unit":"tons","life_of_mine__years_":13,"project_inception__year_":2013,"project_completion__year_":2026,"Company Name":"Base Resources (100%)","unsafe__expected___investment__mm__":275,"Probability to move to investment by 2020":"high","power_sourcing_arrangement_or_relationship_between_mine_and_":"Grid supply","Source of power":"On-Grid","energy_consumption__kwh_t_product_":2000,"annual_energy_consumption__mwh_":158000,"energy_needs__mw_":16.46,"Shareholding Code":"Sole Ownership by a private company","Mine Location":"(-4.3666667, 39.4666667)","Location notes":null,"Region":"EA","Tariff Public Utility":17,"Cost relativity":"equal tariff","Grid Energy Source":"Mainly Hydro Powered Generation","Grid Reliability":"50 to 100 days","Source":"Infomine","Notes":null,"Reference":"Infomine, Mining Weekly, http://www.miningweekly.com/article/170m-secured-for-kenya-mineral-sands-project-base-2011-07-27,    \nhttp://www.miningweekly.com/article/australia-based-company-acquires-required-funding-to-begin-construction-for-kenyan-operations-2012-01-27,     \nhttp://www.proactiveinvestors.com.au/companies/news/11138/base-resources-moves-kwale-mineral-sands-project-towards-enhanced-dfs-11138.html","Projects Pre-2000":"No","Projects 2001-2012":"No","Projects 2020":"Yes"},{"_id":29,"Property Name":"Barbrook Mine","Country":"South Africa","Commodity":"Gold","Type of Work":"Open-Pit/Underground","Status":"Feasibility","Extent of Processing":"refined","Best Reserve Available":"Inferred Resources","reserves_tonnes____000__units":8781,"Reserve Grade":5.76,"Reserve grade Unit":"grams","Current Production":133338,"Current Production Unit":"grams","unsafe__expected__yearly_production_at_full_capacity":70000,"unsafe__expected__production_at_full_capacity_unit":"ounce","life_of_mine__years_":0,"project_inception__year_":2014,"project_completion__year_":2014,"Company Name":"Vantage Goldfields Ltd","unsafe__expected___investment__mm__":null,"Probability to move to investment by 2020":"closed by 2020","power_sourcing_arrangement_or_relationship_between_mine_and_":"Grid supply","Source of power":"On-Grid","energy_consumption__kwh_t_product_":45000000,"annual_energy_consumption__mwh_":89301,"energy_needs__mw_":9.3,"Shareholding Code":"Sole Ownership by a private company","Mine Location":"(-25.7166667, 31.2833333)","Location notes":null,"Region":"SA","Tariff Public Utility":4,"Cost relativity":"equal tariff","Grid Energy Source":"Mainly Coal Fuelled Generation","Grid Reliability":"0 to 50 days","Source":"Infomine","Notes":"1985 conclusion of feasibility study; interim gaps in production","Reference":"Infomine, Company Website","Projects Pre-2000":"No","Projects 2001-2012":"No","Projects 2020":"No"},{"_id":30,"Property Name":"South Africa Ferro Manganese Today","Country":"South Africa","Commodity":"Manganese","Type of Work":"Surface","Status":"Producer","Extent of Processing":"smelted","Best Reserve Available":null,"reserves_tonnes____000__units":null,"Reserve Grade":null,"Reserve grade Unit":null,"Current Production":684000,"Current Production Unit":"tons","unsafe__expected__yearly_production_at_full_capacity":684000,"unsafe__expected__production_at_full_capacity_unit":"tons","life_of_mine__years_":null,"project_inception__year_":2011,"project_completion__year_":2015,"Company Name":"Agregation Managanese Ore Production","unsafe__expected___investment__mm__":null,"Probability to move to investment by 2020":"closed by 2020","power_sourcing_arrangement_or_relationship_between_mine_and_":"Grid supply","Source of power":"On-Grid","energy_consumption__kwh_t_product_":2516,"annual_energy_consumption__mwh_":1720944,"energy_needs__mw_":179.27,"Shareholding Code":"Join-venture with only private interests","Mine Location":null,"Location notes":null,"Region":"SA","Tariff Public Utility":4,"Cost relativity":"equal tariff","Grid Energy Source":"Mainly Coal Fuelled Generation","Grid Reliability":"0 to 50 days","Source":"USGS","Notes":"This line sums up all MN projects' current capacity and take 8% of this sum assuming that 8% is smelted based on USGS as ferro-manganese","Reference":null,"Projects Pre-2000":"No","Projects 2001-2012":"Yes","Projects 2020":"No"},{"_id":31,"Property Name":"Tshipi/Project Kalahari","Country":"South Africa","Commodity":"Manganese","Type of Work":"Open-Pit","Status":"Producer","Extent of Processing":"crushed","Best Reserve Available":"Indicated Reserves","reserves_tonnes____000__units":39000,"Reserve Grade":33.17,"Reserve grade Unit":"%","Current Production":1000000,"Current Production Unit":"tons","unsafe__expected__yearly_production_at_full_capacity":2500000,"unsafe__expected__production_at_full_capacity_unit":"tons","life_of_mine__years_":60,"project_inception__year_":2012,"project_completion__year_":2072,"Company Name":"Jupiter Mines Limited (49%), Ntsimbintle Mining (Proprietary) Ltd (51%)","unsafe__expected___investment__mm__":null,"Probability to move to investment by 2020":"high","power_sourcing_arrangement_or_relationship_between_mine_and_":"Grid supply","Source of power":"On-Grid","energy_consumption__kwh_t_product_":16,"annual_energy_consumption__mwh_":40000,"energy_needs__mw_":4.17,"Shareholding Code":"Join-venture with only private interests","Mine Location":"(-27.3666667, 22.9833333)","Location notes":null,"Region":"SA","Tariff Public Utility":4,"Cost relativity":"equal tariff","Grid Energy Source":"Mainly Coal Fuelled Generation","Grid Reliability":"0 to 50 days","Source":"Infomine","Notes":null,"Reference":null,"Projects Pre-2000":"No","Projects 2001-2012":"Yes","Projects 2020":"Yes"},{"_id":32,"Property Name":"Wessels","Country":"South Africa","Commodity":"Manganese","Type of Work":"Underground","Status":"Producer","Extent of Processing":"crushed","Best Reserve Available":"Combined Resources","reserves_tonnes____000__units":137000,"Reserve Grade":50,"Reserve grade Unit":"%","Current Production":1000000,"Current Production Unit":"tons","unsafe__expected__yearly_production_at_full_capacity":1000000,"unsafe__expected__production_at_full_capacity_unit":"tons","life_of_mine__years_":85,"project_inception__year_":1973,"project_completion__year_":2058,"Company Name":"Anglo American (29.6%), Bhp's Samancor (44.4%), Bee (27%)","unsafe__expected___investment__mm__":null,"Probability to move to investment by 2020":"high","power_sourcing_arrangement_or_relationship_between_mine_and_":"Grid supply","Source of power":"On-Grid","energy_consumption__kwh_t_product_":30,"annual_energy_consumption__mwh_":30000,"energy_needs__mw_":3.13,"Shareholding Code":"Join-venture with only private interests","Mine Location":"(-27.1166667, 22.85)","Location notes":null,"Region":"SA","Tariff Public Utility":4,"Cost relativity":"equal tariff","Grid Energy Source":"Mainly Coal Fuelled Generation","Grid Reliability":"0 to 50 days","Source":"Infomine","Notes":null,"Reference":null,"Projects Pre-2000":"Yes","Projects 2001-2012":"Yes","Projects 2020":"Yes"},{"_id":33,"Property Name":"Nachingwea / Ntaka Hill","Country":"Tanzania","Commodity":"Nickel","Type of Work":"Underground","Status":"Prefeasibility","Extent of Processing":"intermediate","Best Reserve Available":"Indicated Reserves","reserves_tonnes____000__units":11125,"Reserve Grade":1.13,"Reserve grade Unit":"%","Current Production":null,"Current Production Unit":null,"unsafe__expected__yearly_production_at_full_capacity":15000,"unsafe__expected__production_at_full_capacity_unit":"tons","life_of_mine__years_":15,"project_inception__year_":2016,"project_completion__year_":null,"Company Name":"Imx Resources Limited (100%)","unsafe__expected___investment__mm__":227,"Probability to move to investment by 2020":"high","power_sourcing_arrangement_or_relationship_between_mine_and_":"Grid supply + self-supply backup","Source of power":"On-site HFO, On-Grid","energy_consumption__kwh_t_product_":6600,"annual_energy_consumption__mwh_":99000,"energy_needs__mw_":10.31,"Shareholding Code":"Sole Ownership by a private company","Mine Location":"(-10.1, 38.55)","Location notes":null,"Region":"EA","Tariff Public Utility":5.3,"Cost relativity":"above tariff","Grid Energy Source":"Mainly Hydro Powered Generation","Grid Reliability":"50 to 100 days","Source":"Infomine","Notes":"The Tanzanian government is very supportive of the Ntaka Hill project and is anxious to promote economic development in the southern parts of the country. Should the extension of the grid to Masasi not be completed in time, the current alternatives for Ntaka Hill would include connecting to the grid at the coast at Lindi, or the provision of power for the operation on-site.  All options are currently under consideration.","Reference":"http://www.openbriefing.com/OB/IMX-Resources-Limited/2012/10/17/MD-on-Ntaka-Hill-PEA/813.aspx","Projects Pre-2000":"No","Projects 2001-2012":"No","Projects 2020":"Yes"},{"_id":34,"Property Name":"Volspruit/Grass Valley","Country":"South Africa","Commodity":"Platinum","Type of Work":"Surface","Status":"Exploration","Extent of Processing":"refined","Best Reserve Available":"Indicated Reserves","reserves_tonnes____000__units":16630,"Reserve Grade":1.15,"Reserve grade Unit":"grams","Current Production":null,"Current Production Unit":null,"unsafe__expected__yearly_production_at_full_capacity":200000,"unsafe__expected__production_at_full_capacity_unit":"ounce","life_of_mine__years_":8,"project_inception__year_":2014,"project_completion__year_":2022,"Company Name":"Impala Platinum Holdings (25%), Sylvania Platinum Limited (75%)","unsafe__expected___investment__mm__":null,"Probability to move to investment by 2020":"low","power_sourcing_arrangement_or_relationship_between_mine_and_":"Grid supply","Source of power":"On-Grid","energy_consumption__kwh_t_product_":50089080,"annual_energy_consumption__mwh_":284000,"energy_needs__mw_":29.58,"Shareholding Code":"Join-venture with only private interests","Mine Location":null,"Location notes":"Limpopo, 15km south of the town of Mokopane (Potgietersrus)","Region":"SA","Tariff Public Utility":4,"Cost relativity":"equal tariff","Grid Energy Source":"Mainly Coal Fuelled Generation","Grid Reliability":"0 to 50 days","Source":"Infomine","Notes":"The goal at full production is to feed 3 100 000 tpm capacity plant - Estimates for production and the probability is forced into \"low\" probability","Reference":"Infomine, Company Website","Projects Pre-2000":"No","Projects 2001-2012":"No","Projects 2020":"Yes"},{"_id":35,"Property Name":"Kanyika","Country":"Malawi","Commodity":"Niobium","Type of Work":"Surface","Status":"Feasibility","Extent of Processing":"refined","Best Reserve Available":"Indicated Resource","reserves_tonnes____000__units":18000,"Reserve Grade":3100,"Reserve grade Unit":"parts per million","Current Production":null,"Current Production Unit":null,"unsafe__expected__yearly_production_at_full_capacity":3000,"unsafe__expected__production_at_full_capacity_unit":"tons","life_of_mine__years_":20,"project_inception__year_":2015,"project_completion__year_":2035,"Company Name":"Globe Metals And Mining","unsafe__expected___investment__mm__":272,"Probability to move to investment by 2020":"high","power_sourcing_arrangement_or_relationship_between_mine_and_":"Self-supply","Source of power":"On-site Diesel","energy_consumption__kwh_t_product_":4000,"annual_energy_consumption__mwh_":12000,"energy_needs__mw_":1.25,"Shareholding Code":"Sole Ownership by a private company","Mine Location":"(-12.7166667, 33.7)","Location notes":null,"Region":"SA","Tariff Public Utility":5,"Cost relativity":"above tariff","Grid Energy Source":"Mainly Hydro Powered Generation","Grid Reliability":"50 to 100 days","Source":"WB","Notes":null,"Reference":null,"Projects Pre-2000":"No","Projects 2001-2012":"No","Projects 2020":"Yes"},{"_id":36,"Property Name":"Impala Platinum Mine","Country":"South Africa","Commodity":"Palladium","Type of Work":"Underground","Status":"Producer","Extent of Processing":"refined","Best Reserve Available":null,"reserves_tonnes____000__units":null,"Reserve Grade":null,"Reserve grade Unit":null,"Current Production":15878000,"Current Production Unit":"grams","unsafe__expected__yearly_production_at_full_capacity":600000,"unsafe__expected__production_at_full_capacity_unit":"ounce","life_of_mine__years_":70,"project_inception__year_":1969,"project_completion__year_":2039,"Company Name":"Impala Platinum Holdings","unsafe__expected___investment__mm__":null,"Probability to move to investment by 2020":"high","power_sourcing_arrangement_or_relationship_between_mine_and_":"Grid supply","Source of power":"On-Grid","energy_consumption__kwh_t_product_":69489780,"annual_energy_consumption__mwh_":1182000,"energy_needs__mw_":123.13,"Shareholding Code":"Sole Ownership by a private company","Mine Location":"(-25.55, 27.1833333)","Location notes":null,"Region":"SA","Tariff Public Utility":4,"Cost relativity":"equal tariff","Grid Energy Source":"Mainly Coal Fuelled Generation","Grid Reliability":"0 to 50 days","Source":"Infomine","Notes":"Production  of palladium based on 2011 production ratio","Reference":"Infomine, Company Website","Projects Pre-2000":"Yes","Projects 2001-2012":"Yes","Projects 2020":"Yes"},{"_id":37,"Property Name":"South Africa Silico_Manganese Future","Country":"South Africa","Commodity":"Silico-Manganese","Type of Work":"Surface","Status":"Development","Extent of Processing":"smelted","Best Reserve Available":null,"reserves_tonnes____000__units":null,"Reserve Grade":null,"Reserve grade Unit":null,"Current Production":null,"Current Production Unit":null,"unsafe__expected__yearly_production_at_full_capacity":1150000,"unsafe__expected__production_at_full_capacity_unit":"tons","life_of_mine__years_":null,"project_inception__year_":2018,"project_completion__year_":null,"Company Name":"Agregation Managanese Ore Production","unsafe__expected___investment__mm__":null,"Probability to move to investment by 2020":"high","power_sourcing_arrangement_or_relationship_between_mine_and_":"Grid supply","Source of power":"On-Grid","energy_consumption__kwh_t_product_":4016,"annual_energy_consumption__mwh_":4618400,"energy_needs__mw_":481.08,"Shareholding Code":"Join-venture with only private interests","Mine Location":null,"Location notes":null,"Region":"SA","Tariff Public Utility":4,"Cost relativity":"equal tariff","Grid Energy Source":"Mainly Coal Fuelled Generation","Grid Reliability":"0 to 50 days","Source":"WB","Notes":"This line sums up all MN projects' expected capacity and take 10% of this sum assuming that 10% will be smelted as silico-manganese","Reference":null,"Projects Pre-2000":"No","Projects 2001-2012":"No","Projects 2020":"Yes"},{"_id":38,"Property Name":"Moma","Country":"Mozambique","Commodity":"Ilmenite","Type of Work":"Surface","Status":"Producer","Extent of Processing":"intermediate","Best Reserve Available":"Inferred Resources","reserves_tonnes____000__units":5900000,"Reserve Grade":2.7,"Reserve grade Unit":"%","Current Production":494400,"Current Production Unit":"tons","unsafe__expected__yearly_production_at_full_capacity":1200000,"unsafe__expected__production_at_full_capacity_unit":"tons","life_of_mine__years_":120,"project_inception__year_":2004,"project_completion__year_":2132,"Company Name":"Kenmare Resources Plc ","unsafe__expected___investment__mm__":240,"Probability to move to investment by 2020":"high","power_sourcing_arrangement_or_relationship_between_mine_and_":"Mines invest in the grid","Source of power":"On-Grid","energy_consumption__kwh_t_product_":2000,"annual_energy_consumption__mwh_":1600000,"energy_needs__mw_":166.67,"Shareholding Code":"Sole Ownership by a private company","Mine Location":"(-16.5, 39.6666667)","Location notes":null,"Region":"SA","Tariff Public Utility":4.1,"Cost relativity":"equal tariff","Grid Energy Source":"Mainly Hydro Powered Generation","Grid Reliability":"50 to 100 days","Source":"IM","Notes":"Kenmare has secured grid power (based on hydroelectricity) at USc2.4/kWh – cheap by international standards. (Kenmare Resources plc and the Mozambican State-owned utility, Electricidade de Mozambique have signed a Power Supply Agreement covering the provision of low cost electrical power to the Moma Titanium Minerals Project.This Agreement will enable low cost, hydro-electrically generated power to be available to the project from the commencement of production. The Agreement, covering a 20 year period, sets out the terms and conditions for the provision of this power and ensures that the project will pay a highly competitive tariff for the power supplied. Further terms of the Agreement are confidential.)","Reference":"Infomine, Company Website","Projects Pre-2000":"No","Projects 2001-2012":"Yes","Projects 2020":"Yes"},{"_id":39,"Property Name":"Mounana","Country":"Gabon","Commodity":"Manganese","Type of Work":"Surface","Status":"Exploration","Extent of Processing":"smelted","Best Reserve Available":"None","reserves_tonnes____000__units":null,"Reserve Grade":null,"Reserve grade Unit":null,"Current Production":null,"Current Production Unit":null,"unsafe__expected__yearly_production_at_full_capacity":100000,"unsafe__expected__production_at_full_capacity_unit":"tons","life_of_mine__years_":null,"project_inception__year_":null,"project_completion__year_":null,"Company Name":"BHP (60%)- Angloamerican (40%)","unsafe__expected___investment__mm__":null,"Probability to move to investment by 2020":"low","power_sourcing_arrangement_or_relationship_between_mine_and_":"Self-supply --> Grid supply","Source of power":"On-site Diesel, On-Grid","energy_consumption__kwh_t_product_":2516,"annual_energy_consumption__mwh_":251600,"energy_needs__mw_":26.21,"Shareholding Code":null,"Mine Location":"(-1.4333333, 13.15)","Location notes":null,"Region":"CA","Tariff Public Utility":16.2,"Cost relativity":"above tariff","Grid Energy Source":"Mainly Hydro Powered Generation","Grid Reliability":"0 to 50 days","Source":"WB","Notes":null,"Reference":"WB","Projects Pre-2000":"No","Projects 2001-2012":"No","Projects 2020":"Yes"},{"_id":40,"Property Name":"Nsuta","Country":"Ghana","Commodity":"Manganese","Type of Work":"Open-Pit","Status":"Producer","Extent of Processing":"crushed","Best Reserve Available":"None","reserves_tonnes____000__units":null,"Reserve Grade":null,"Reserve grade Unit":null,"Current Production":420000,"Current Production Unit":"tons","unsafe__expected__yearly_production_at_full_capacity":1500000,"unsafe__expected__production_at_full_capacity_unit":"tons","life_of_mine__years_":111,"project_inception__year_":1916,"project_completion__year_":2027,"Company Name":"Consolidated Minerals (90%), Government Of Ghana (10%)","unsafe__expected___investment__mm__":null,"Probability to move to investment by 2020":"high","power_sourcing_arrangement_or_relationship_between_mine_and_":"Grid supply","Source of power":"On-Grid","energy_consumption__kwh_t_product_":16,"annual_energy_consumption__mwh_":24000,"energy_needs__mw_":2.5,"Shareholding Code":"Joint- venture with State Equity","Mine Location":"(5.2666667, -1.95)","Location notes":null,"Region":"WA","Tariff Public Utility":11.1,"Cost relativity":"equal tariff","Grid Energy Source":"Mainly Hydro Powered Generation","Grid Reliability":"50 to 100 days","Source":"Infomine","Notes":null,"Reference":"Infomine, http://www.ghamang.net,    \nhttp://www.manganese.org/__data/assets/pdf_file/0008/97451/6.ConsMin_-_Company_Profile_and_Mn_Products.pdf","Projects Pre-2000":"Yes","Projects 2001-2012":"Yes","Projects 2020":"Yes"},{"_id":41,"Property Name":"Gloria","Country":"South Africa","Commodity":"Manganese","Type of Work":"Underground","Status":"Producer","Extent of Processing":"crushed","Best Reserve Available":"Indicated Reserves","reserves_tonnes____000__units":29400,"Reserve Grade":29.9,"Reserve grade Unit":"%","Current Production":700000,"Current Production Unit":"tons","unsafe__expected__yearly_production_at_full_capacity":1000000,"unsafe__expected__production_at_full_capacity_unit":"tons","life_of_mine__years_":60,"project_inception__year_":1978,"project_completion__year_":2038,"Company Name":"African Rainbow Minerals Limited (50%), Assore Limited (50%)","unsafe__expected___investment__mm__":null,"Probability to move to investment by 2020":"high","power_sourcing_arrangement_or_relationship_between_mine_and_":"Grid supply","Source of power":"On-Grid","energy_consumption__kwh_t_product_":30,"annual_energy_consumption__mwh_":30000,"energy_needs__mw_":3.13,"Shareholding Code":"Join-venture with only private interests","Mine Location":"(-27.1166667, 22.85)","Location notes":null,"Region":"SA","Tariff Public Utility":4,"Cost relativity":"equal tariff","Grid Energy Source":"Mainly Coal Fuelled Generation","Grid Reliability":"0 to 50 days","Source":"Infomine","Notes":null,"Reference":null,"Projects Pre-2000":"Yes","Projects 2001-2012":"Yes","Projects 2020":"Yes"},{"_id":42,"Property Name":"Ngwena","Country":"Tanzania","Commodity":"Nickel","Type of Work":"Underground","Status":"Exploration","Extent of Processing":"intermediate","Best Reserve Available":"Indicated Reserves","reserves_tonnes____000__units":290000,"Reserve Grade":null,"Reserve grade Unit":null,"Current Production":null,"Current Production Unit":null,"unsafe__expected__yearly_production_at_full_capacity":20000,"unsafe__expected__production_at_full_capacity_unit":"tons","life_of_mine__years_":15,"project_inception__year_":2016,"project_completion__year_":2035,"Company Name":"Imx","unsafe__expected___investment__mm__":null,"Probability to move to investment by 2020":"low","power_sourcing_arrangement_or_relationship_between_mine_and_":"Self-supply --> Grid supply","Source of power":"On-Site Diesel, On-Grid","energy_consumption__kwh_t_product_":6600,"annual_energy_consumption__mwh_":132000,"energy_needs__mw_":13.75,"Shareholding Code":"Sole Ownership by a private company","Mine Location":null,"Location notes":"Ntaka Hill","Region":"EA","Tariff Public Utility":5.3,"Cost relativity":"above tariff","Grid Energy Source":"Mainly Hydro Powered Generation","Grid Reliability":"50 to 100 days","Source":"WB","Notes":"Once mining of the metal becomes operational, it would be transported abroad for smelting through Mtwara Port. Company will consider connecting power from neighbouring Masasi District when it starts mining.","Reference":"WB, http://allafrica.com/stories/201210070110.html","Projects Pre-2000":"No","Projects 2001-2012":"No","Projects 2020":"Yes"},{"_id":43,"Property Name":"Sheba's Ridge","Country":"South Africa","Commodity":"Nickel from N-C Sulphide","Type of Work":"Open-Pit","Status":"Feasibility","Extent of Processing":"smelted","Best Reserve Available":"Indicated Reserves","reserves_tonnes____000__units":339860,"Reserve Grade":0.19,"Reserve grade Unit":"%","Current Production":null,"Current Production Unit":null,"unsafe__expected__yearly_production_at_full_capacity":23000,"unsafe__expected__production_at_full_capacity_unit":"tons","life_of_mine__years_":16,"project_inception__year_":2013,"project_completion__year_":2029,"Company Name":"Anglo American Platinum Ltd (35%), Aquarius Platinum Ltd (39%), Industrial Development Corp Of South Africa (26%)","unsafe__expected___investment__mm__":972,"Probability to move to investment by 2020":"high","power_sourcing_arrangement_or_relationship_between_mine_and_":"Grid supply","Source of power":"On-Grid","energy_consumption__kwh_t_product_":1100,"annual_energy_consumption__mwh_":25300,"energy_needs__mw_":2.64,"Shareholding Code":"Join-venture with only private interests","Mine Location":"(-25.4333333, 29.5666667)","Location notes":null,"Region":"SA","Tariff Public Utility":4,"Cost relativity":"equal tariff","Grid Energy Source":"Mainly Coal Fuelled Generation","Grid Reliability":"0 to 50 days","Source":"Infomine","Notes":"2009; completion of feasibility report. Ridge continues to consult with Pace Global Energy Services to examine alternatives to reduce reliance on grid supply from Eskom due to the current and projected power supply constraints. Further studies and discussions with Eskom are necessary in order for the Company to be in a position to make a development decision.","Reference":"Infomine, Feasibility Report 2008, http://www.infomine.com/index/pr/PA645346.PDF","Projects Pre-2000":"No","Projects 2001-2012":"No","Projects 2020":"Yes"},{"_id":44,"Property Name":"South Africa Ferro Manganese Future","Country":"South Africa","Commodity":"Manganese","Type of Work":"Surface","Status":"Development","Extent of Processing":"smelted","Best Reserve Available":null,"reserves_tonnes____000__units":null,"Reserve Grade":null,"Reserve grade Unit":null,"Current Production":null,"Current Production Unit":null,"unsafe__expected__yearly_production_at_full_capacity":2300000,"unsafe__expected__production_at_full_capacity_unit":"tons","life_of_mine__years_":null,"project_inception__year_":2018,"project_completion__year_":null,"Company Name":"Agregation Managanese Ore Production","unsafe__expected___investment__mm__":null,"Probability to move to investment by 2020":"high","power_sourcing_arrangement_or_relationship_between_mine_and_":"Grid supply","Source of power":"On-Grid","energy_consumption__kwh_t_product_":2516,"annual_energy_consumption__mwh_":5786800,"energy_needs__mw_":602.79,"Shareholding Code":"Join-venture with only private interests","Mine Location":null,"Location notes":null,"Region":"SA","Tariff Public Utility":4,"Cost relativity":"equal tariff","Grid Energy Source":"Mainly Coal Fuelled Generation","Grid Reliability":"0 to 50 days","Source":"WB","Notes":"This line sums up all MN projects' expected capacity and take 20% of this sum assuming that 20% will be smelted as ferro-manganese","Reference":null,"Projects Pre-2000":"No","Projects 2001-2012":"No","Projects 2020":"Yes"},{"_id":45,"Property Name":"Phoenix Mine (Tati Nickel)","Country":"Botswana","Commodity":"Nickel from N-C Sulphide","Type of Work":"Open-Pit","Status":"Producer","Extent of Processing":"intermediate","Best Reserve Available":"Proven Reserves","reserves_tonnes____000__units":111800,"Reserve Grade":0.22,"Reserve grade Unit":"%","Current Production":9346,"Current Production Unit":"tons","unsafe__expected__yearly_production_at_full_capacity":120000,"unsafe__expected__production_at_full_capacity_unit":"tons","life_of_mine__years_":20,"project_inception__year_":1995,"project_completion__year_":2015,"Company Name":"Norilsk Nickel (85%), Botswana Govt (15%)","unsafe__expected___investment__mm__":null,"Probability to move to investment by 2020":"closed by 2020","power_sourcing_arrangement_or_relationship_between_mine_and_":"Grid supply","Source of power":"On-Grid","energy_consumption__kwh_t_product_":300,"annual_energy_consumption__mwh_":36000,"energy_needs__mw_":3.75,"Shareholding Code":"Joint- venture with State Equity","Mine Location":"(-21.2, 27.7666667)","Location notes":null,"Region":"SA","Tariff Public Utility":6.7,"Cost relativity":"equal tariff","Grid Energy Source":"Mainly Coal Fuelled Generation","Grid Reliability":"0 to 50 days","Source":"Infomine","Notes":"The survey shows that by 2009/10, the power consumption at peak load from Tati Nickel would have doubled amid the power crisis that has engulfed the country. Currently at peak load, the mines use 39 mega watts (MW) of power and next year they will require 81 MW. Current ore depleted but new exploration projects will likely produce by 2020","Reference":"Infomine, Company Website, Publications","Projects Pre-2000":"Yes","Projects 2001-2012":"Yes","Projects 2020":"No"},{"_id":46,"Property Name":"Namakwa Sands","Country":"South Africa","Commodity":"Rutile","Type of Work":"Open-Pit","Status":"Producer","Extent of Processing":"smelted","Best Reserve Available":"Proven Reserves","reserves_tonnes____000__units":263350,"Reserve Grade":2.14,"Reserve grade Unit":"%","Current Production":28000,"Current Production Unit":"tons","unsafe__expected__yearly_production_at_full_capacity":25000,"unsafe__expected__production_at_full_capacity_unit":"tons","life_of_mine__years_":45,"project_inception__year_":1994,"project_completion__year_":2039,"Company Name":"Exxaro Resources Limited","unsafe__expected___investment__mm__":null,"Probability to move to investment by 2020":"high","power_sourcing_arrangement_or_relationship_between_mine_and_":"Self-supply","Source of power":"Co-generation","energy_consumption__kwh_t_product_":4100,"annual_energy_consumption__mwh_":102500,"energy_needs__mw_":10.68,"Shareholding Code":"Sole Ownership by a private company","Mine Location":"(-31.2833333, 17.9)","Location notes":null,"Region":"SA","Tariff Public Utility":4,"Cost relativity":"above tariff","Grid Energy Source":"Mainly Coal Fuelled Generation","Grid Reliability":"0 to 50 days","Source":"Infomine","Notes":"The construction of the 14MW co-generation power plant at Namakwa Sands commenced in the second quarter of 2012 (CW). The power plant would generate electricity from waste gas at the Namakwa Sands operation and the project would be funded from the group’s balance sheet. Phase 2 construction taken  in 1997 at investment of R1.2BN (exchange rate December 31, 2007:  4.8630 ZAR/USD). ","Reference":"Infomine, Mining Weekly, USGS, http://www.saimm.co.za/Conferences/HMC2009/009-016_Rosendaal.pdf","Projects Pre-2000":"Yes","Projects 2001-2012":"Yes","Projects 2020":"Yes"},{"_id":47,"Property Name":"Langer Heinrich","Country":"Namibia","Commodity":"Uranium","Type of Work":"Open-Pit","Status":"Producer","Extent of Processing":"refined","Best Reserve Available":"Inferred Resources","reserves_tonnes____000__units":18500,"Reserve Grade":0.06,"Reserve grade Unit":"%","Current Production":585343,"Current Production Unit":"grams","unsafe__expected__yearly_production_at_full_capacity":6000000,"unsafe__expected__production_at_full_capacity_unit":"lb","life_of_mine__years_":17,"project_inception__year_":2007,"project_completion__year_":2024,"Company Name":"Palladin Energy (100%)","unsafe__expected___investment__mm__":100,"Probability to move to investment by 2020":"high","power_sourcing_arrangement_or_relationship_between_mine_and_":"Grid supply","Source of power":"On-Grid","energy_consumption__kwh_t_product_":178000,"annual_energy_consumption__mwh_":484437,"energy_needs__mw_":50.46,"Shareholding Code":"Sole Ownership by a private company","Mine Location":"(-22.45, 15.0333333)","Location notes":null,"Region":"SA","Tariff Public Utility":8.4,"Cost relativity":"equal tariff","Grid Energy Source":"Mainly Hydro Powered Generation","Grid Reliability":"0 to 50 days","Source":"IM","Notes":"Langer Heinrich signed a deal on October 17, 2012 with Namcor to supply its mines upon completion of its 800MW Kudu gas project by 2017-18","Reference":"Infomine, Company Website","Projects Pre-2000":"No","Projects 2001-2012":"Yes","Projects 2020":"Yes"},{"_id":48,"Property Name":"Hillside","Country":"South Africa","Commodity":"Aluminum","Type of Work":"Plant","Status":"Producer","Extent of Processing":"smelted","Best Reserve Available":"None","reserves_tonnes____000__units":null,"Reserve Grade":null,"Reserve grade Unit":null,"Current Production":640000,"Current Production Unit":"tons","unsafe__expected__yearly_production_at_full_capacity":640000,"unsafe__expected__production_at_full_capacity_unit":"tons","life_of_mine__years_":null,"project_inception__year_":1992,"project_completion__year_":null,"Company Name":"Billiton Aluminium South Africa (Pty.) Ltd. ","unsafe__expected___investment__mm__":null,"Probability to move to investment by 2020":"high","power_sourcing_arrangement_or_relationship_between_mine_and_":"Grid supply","Source of power":"On-Grid","energy_consumption__kwh_t_product_":15500,"annual_energy_consumption__mwh_":9920000,"energy_needs__mw_":1033.33,"Shareholding Code":"Sole Ownership by a private company","Mine Location":"(-31.2666667, 29.4666667)","Location notes":null,"Region":"SA","Tariff Public Utility":4,"Cost relativity":"equal tariff","Grid Energy Source":"Mainly Coal Fuelled Generation","Grid Reliability":"0 to 50 days","Source":"USGS","Notes":null,"Reference":null,"Projects Pre-2000":"Yes","Projects 2001-2012":"Yes","Projects 2020":"Yes"},{"_id":49,"Property Name":"Kabanga","Country":"Tanzania","Commodity":"Nickel","Type of Work":"Surface","Status":"Feasibility","Extent of Processing":"intermediate","Best Reserve Available":"Indicated Reserves","reserves_tonnes____000__units":23200,"Reserve Grade":2.64,"Reserve grade Unit":"%","Current Production":null,"Current Production Unit":null,"unsafe__expected__yearly_production_at_full_capacity":40000,"unsafe__expected__production_at_full_capacity_unit":"tons","life_of_mine__years_":30,"project_inception__year_":2013,"project_completion__year_":2043,"Company Name":"BARRICK GOLD CORPORATION 50:50 Joint Venture With Xstrata Operator.","unsafe__expected___investment__mm__":null,"Probability to move to investment by 2020":"high","power_sourcing_arrangement_or_relationship_between_mine_and_":"Self-supply","Source of power":"On-Site HFO","energy_consumption__kwh_t_product_":5600,"annual_energy_consumption__mwh_":224000,"energy_needs__mw_":23.33,"Shareholding Code":"Join-venture with only private interests","Mine Location":"(-2.8833333, 30.55)","Location notes":null,"Region":"EA","Tariff Public Utility":5.3,"Cost relativity":"above tariff","Grid Energy Source":"Mainly Hydro Powered Generation","Grid Reliability":"50 to 100 days","Source":"Infomine","Notes":"IM, Web, 2013: start of construction on mine; 30 year life (http://www.metalbulletin.com/Article/2976922/MINING-INDABA-2012-Kabanga-Nickel-aims-to-start-mine-construction-in-2013.html). Barrick Gold Annual Report 2011 (primarily refering to Gold mines in Tanzania): \"In addition, we aim to finalise the installation of full back-up power at all of our mine sites by the end of Q2 2012, which when completed, is expected to significantly mitigate the effects of future power outages on production levels.\"","Reference":"Infomine, http://www.barrick.com/operations/projects/kabanga/default.aspx,","Projects Pre-2000":"No","Projects 2001-2012":"No","Projects 2020":"Yes"},{"_id":50,"Property Name":"Trident/ Enterprise","Country":"Zambia","Commodity":"Nickel from N-C Sulphide","Type of Work":"Surface","Status":"Advanced Exploration","Extent of Processing":"intermediate","Best Reserve Available":"Probable Reserves","reserves_tonnes____000__units":30000,"Reserve Grade":0.01,"Reserve grade Unit":null,"Current Production":null,"Current Production Unit":null,"unsafe__expected__yearly_production_at_full_capacity":85000,"unsafe__expected__production_at_full_capacity_unit":"tons","life_of_mine__years_":null,"project_inception__year_":2015,"project_completion__year_":null,"Company Name":"First Quantum Minerals Ltd","unsafe__expected___investment__mm__":275,"Probability to move to investment by 2020":"low","power_sourcing_arrangement_or_relationship_between_mine_and_":"Grid supply","Source of power":"On-Grid","energy_consumption__kwh_t_product_":300,"annual_energy_consumption__mwh_":25500,"energy_needs__mw_":2.66,"Shareholding Code":"Sole Ownership by a private company","Mine Location":"(-12.25, 25.2)","Location notes":null,"Region":"SA","Tariff Public Utility":3.9,"Cost relativity":"equal tariff","Grid Energy Source":"Mainly Hydro Powered Generation","Grid Reliability":"0 to 50 days","Source":"Infomine","Notes":null,"Reference":"http://www.mineweb.com/mineweb/content/en/mineweb-fast-news?oid=169769&sn=Detail","Projects Pre-2000":"No","Projects 2001-2012":"No","Projects 2020":"Yes"},{"_id":51,"Property Name":"Sheba's Ridge","Country":"South Africa","Commodity":"Palladium","Type of Work":"Open-Pit","Status":"Feasibility","Extent of Processing":"smelted","Best Reserve Available":"Indicated Reserves","reserves_tonnes____000__units":366720,"Reserve Grade":0.95,"Reserve grade Unit":"grams","Current Production":630000,"Current Production Unit":"tons","unsafe__expected__yearly_production_at_full_capacity":243000,"unsafe__expected__production_at_full_capacity_unit":"ounce","life_of_mine__years_":20,"project_inception__year_":null,"project_completion__year_":null,"Company Name":"Ridge 100%","unsafe__expected___investment__mm__":972,"Probability to move to investment by 2020":"high","power_sourcing_arrangement_or_relationship_between_mine_and_":"Grid supply + self-supply backup","Source of power":"On-Grid, On-Site HFO","energy_consumption__kwh_t_product_":46561680,"annual_energy_consumption__mwh_":320760,"energy_needs__mw_":33.41,"Shareholding Code":"Sole Ownership by a private company","Mine Location":"(-25.4333333, 29.55)","Location notes":null,"Region":"SA","Tariff Public Utility":4,"Cost relativity":"above tariff","Grid Energy Source":"Mainly Coal Fuelled Generation","Grid Reliability":"0 to 50 days","Source":"Infomine","Notes":"Ridge continues to consult with Pace Global Energy Services to examine alternatives to reduce reliance on grid supply from Eskom due to the current and projected power supply constraints. Further studies and discussions with Eskom are necessary in order for the Company to be in a position to make a development decision.","Reference":"http://www.infomine.com/index/pr/PA645346.PDF","Projects Pre-2000":"No","Projects 2001-2012":"No","Projects 2020":"Yes"},{"_id":52,"Property Name":"Eland","Country":"South Africa","Commodity":"Platinum","Type of Work":"Underground","Status":"Producer","Extent of Processing":"refined","Best Reserve Available":"Proven Reserves","reserves_tonnes____000__units":9978,"Reserve Grade":3.16,"Reserve grade Unit":"grams","Current Production":1772898,"Current Production Unit":"grams","unsafe__expected__yearly_production_at_full_capacity":300000,"unsafe__expected__production_at_full_capacity_unit":"ounce","life_of_mine__years_":30,"project_inception__year_":2011,"project_completion__year_":2041,"Company Name":"Xstrata","unsafe__expected___investment__mm__":null,"Probability to move to investment by 2020":"high","power_sourcing_arrangement_or_relationship_between_mine_and_":"Grid supply","Source of power":"On-Grid","energy_consumption__kwh_t_product_":69489780,"annual_energy_consumption__mwh_":591000,"energy_needs__mw_":61.56,"Shareholding Code":"Sole Ownership by a private company","Mine Location":"(-25.6166667, 27.8666667)","Location notes":null,"Region":"SA","Tariff Public Utility":4,"Cost relativity":"equal tariff","Grid Energy Source":"Mainly Coal Fuelled Generation","Grid Reliability":"0 to 50 days","Source":"Infomine","Notes":"Full production of PGMs; Open-cast mine 2007-2011; Underground operations began afterwards.\nResouces and Reserves used to calculate LOM from 2009 end at 450K tpm production per year\nOre Reserves: \nProved: 9.711\nProbable: 2.03\nMineral Resources: \nMeasured: 32.706\nIndicated: 42.16\nInferred: 84.7\nSum:  171MN\nLOM:32 years at 2009","Reference":"Infomine, Mining Weekly, Company Website","Projects Pre-2000":"No","Projects 2001-2012":"Yes","Projects 2020":"Yes"},{"_id":53,"Property Name":"Tubatse","Country":"South Africa","Commodity":"Platinum","Type of Work":"Underground","Status":"Advanced Exploration","Extent of Processing":"refined","Best Reserve Available":"Indicated Reserves","reserves_tonnes____000__units":19200,"Reserve Grade":3.33,"Reserve grade Unit":"grams","Current Production":null,"Current Production Unit":null,"unsafe__expected__yearly_production_at_full_capacity":360000,"unsafe__expected__production_at_full_capacity_unit":"ounce","life_of_mine__years_":40,"project_inception__year_":2015,"project_completion__year_":2053,"Company Name":"Genora Resources (26%), Nkwe Platinum (74%)","unsafe__expected___investment__mm__":null,"Probability to move to investment by 2020":"high","power_sourcing_arrangement_or_relationship_between_mine_and_":"Grid supply","Source of power":"On-Grid","energy_consumption__kwh_t_product_":69489780,"annual_energy_consumption__mwh_":709200,"energy_needs__mw_":73.88,"Shareholding Code":"Join-venture with only private interests","Mine Location":"(-24.75, 30.2)","Location notes":null,"Region":"SA","Tariff Public Utility":4,"Cost relativity":"equal tariff","Grid Energy Source":"Mainly Coal Fuelled Generation","Grid Reliability":"0 to 50 days","Source":"Infomine","Notes":null,"Reference":"http://www.internationalresourcejournal.com/resource_in_action/june_10/nkwe_platinum.html","Projects Pre-2000":"No","Projects 2001-2012":"No","Projects 2020":"Yes"},{"_id":54,"Property Name":"Zondereinde (Northam Mine)","Country":"South Africa","Commodity":"Platinum","Type of Work":"Underground","Status":"Producer","Extent of Processing":"refined","Best Reserve Available":"Indicated Reserves","reserves_tonnes____000__units":59780,"Reserve Grade":6.05,"Reserve grade Unit":"grams","Current Production":6118000,"Current Production Unit":"grams","unsafe__expected__yearly_production_at_full_capacity":243260,"unsafe__expected__production_at_full_capacity_unit":"ounce","life_of_mine__years_":37,"project_inception__year_":1993,"project_completion__year_":2030,"Company Name":"Northam Platinum Ltd","unsafe__expected___investment__mm__":250,"Probability to move to investment by 2020":"high","power_sourcing_arrangement_or_relationship_between_mine_and_":"Grid supply","Source of power":"On-Grid, On-Site Hydro (for equipment)","energy_consumption__kwh_t_product_":69489780,"annual_energy_consumption__mwh_":479223,"energy_needs__mw_":49.92,"Shareholding Code":"Sole Ownership by a private company","Mine Location":"(-24.8333333, 27.3333333)","Location notes":null,"Region":"SA","Tariff Public Utility":4,"Cost relativity":"equal tariff","Grid Energy Source":"Mainly Coal Fuelled Generation","Grid Reliability":"0 to 50 days","Source":"Infomine","Notes":"Investmet is an etimate based on yearly investment. Underground equipment driven by hydropower","Reference":"Infomine, Company Website","Projects Pre-2000":"Yes","Projects 2001-2012":"Yes","Projects 2020":"Yes"},{"_id":55,"Property Name":"Mutanda ","Country":"Congo, Dem. Rep. of","Commodity":"Cobalt","Type of Work":"Open-Pit","Status":"Producer","Extent of Processing":"intermediate","Best Reserve Available":"Proven Reserves","reserves_tonnes____000__units":47176,"Reserve Grade":0.9,"Reserve grade Unit":"%","Current Production":6880,"Current Production Unit":"tons","unsafe__expected__yearly_production_at_full_capacity":23000,"unsafe__expected__production_at_full_capacity_unit":"tons","life_of_mine__years_":20,"project_inception__year_":2010,"project_completion__year_":2030,"Company Name":"Samref Congo Sprl (80%) (Glencore Majority Stakeholder Of Samref), Rowny Assets Limited (20%) ","unsafe__expected___investment__mm__":650,"Probability to move to investment by 2020":"high","power_sourcing_arrangement_or_relationship_between_mine_and_":"Mines invest in the grid","Source of power":"On-Grid","energy_consumption__kwh_t_product_":6500,"annual_energy_consumption__mwh_":149500,"energy_needs__mw_":15.57,"Shareholding Code":"Join-venture with only private interests","Mine Location":null,"Location notes":"40km SE of Kolwezi","Region":"CA","Tariff Public Utility":4.7,"Cost relativity":"equal tariff","Grid Energy Source":"Mainly Hydro Powered Generation","Grid Reliability":"150 to 200 days","Source":"Infomine","Notes":"Co-invests with Société Nationale d’Electricité (SNEL) to increase power availability as well as refurburish hydroelectric facility in Katanga Province by 2015","Reference":"Infomine, Company Website, Publications","Projects Pre-2000":"No","Projects 2001-2012":"Yes","Projects 2020":"Yes"},{"_id":56,"Property Name":"Sedibelo","Country":"South Africa","Commodity":"Platinum","Type of Work":"Surface","Status":"Advanced Exploration","Extent of Processing":"refined","Best Reserve Available":"Inferred Resources","reserves_tonnes____000__units":42570,"Reserve Grade":4.38,"Reserve grade Unit":"grams","Current Production":null,"Current Production Unit":null,"unsafe__expected__yearly_production_at_full_capacity":240000,"unsafe__expected__production_at_full_capacity_unit":"ounce","life_of_mine__years_":30,"project_inception__year_":null,"project_completion__year_":null,"Company Name":"Platmin Limited (10%), Bakgatla-Ba-Kgafela Tribe (90%)","unsafe__expected___investment__mm__":2200,"Probability to move to investment by 2020":"high","power_sourcing_arrangement_or_relationship_between_mine_and_":"Grid supply","Source of power":"On-Grid","energy_consumption__kwh_t_product_":50089080,"annual_energy_consumption__mwh_":340800,"energy_needs__mw_":35.5,"Shareholding Code":"Join-venture with only private interests","Mine Location":null,"Location notes":"Northern Cape","Region":"SA","Tariff Public Utility":4,"Cost relativity":"equal tariff","Grid Energy Source":"Mainly Coal Fuelled Generation","Grid Reliability":"0 to 50 days","Source":"Infomine","Notes":null,"Reference":"Infomine, Mining Weekly, Company Website, http://www.platmin.com/content/presentations/annual-general-meeting-12dec2012.pdf","Projects Pre-2000":"No","Projects 2001-2012":"No","Projects 2020":"Yes"},{"_id":57,"Property Name":"Palabora Mine","Country":"South Africa","Commodity":"Nickel from N-C Sulphide","Type of Work":"Open-Pit/Underground","Status":"Producer","Extent of Processing":"refined","Best Reserve Available":"None","reserves_tonnes____000__units":null,"Reserve Grade":null,"Reserve grade Unit":null,"Current Production":95000,"Current Production Unit":"tons","unsafe__expected__yearly_production_at_full_capacity":95000,"unsafe__expected__production_at_full_capacity_unit":"tons","life_of_mine__years_":20,"project_inception__year_":2004,"project_completion__year_":2024,"Company Name":"Rio Tinto (58%), Anglo American (29%)","unsafe__expected___investment__mm__":465,"Probability to move to investment by 2020":"high","power_sourcing_arrangement_or_relationship_between_mine_and_":"Grid supply","Source of power":"On-Grid","energy_consumption__kwh_t_product_":3350,"annual_energy_consumption__mwh_":318250,"energy_needs__mw_":33.15,"Shareholding Code":"Join-venture with only private interests","Mine Location":"(-23.9833333, 31.1333333)","Location notes":null,"Region":"SA","Tariff Public Utility":4,"Cost relativity":"equal tariff","Grid Energy Source":"Mainly Coal Fuelled Generation","Grid Reliability":"0 to 50 days","Source":"IM","Notes":null,"Reference":null,"Projects Pre-2000":"No","Projects 2001-2012":"Yes","Projects 2020":"Yes"},{"_id":58,"Property Name":"Munali (Enterprise / Voyager Deposits)","Country":"Zambia","Commodity":"Nickel from N-C Sulphide","Type of Work":"Underground","Status":"Temporary Suspension","Extent of Processing":"intermediate","Best Reserve Available":"Indicated Reserves","reserves_tonnes____000__units":7296,"Reserve Grade":1.18,"Reserve grade Unit":"%","Current Production":1548,"Current Production Unit":"tons","unsafe__expected__yearly_production_at_full_capacity":100000,"unsafe__expected__production_at_full_capacity_unit":"tons","life_of_mine__years_":10,"project_inception__year_":2008,"project_completion__year_":2018,"Company Name":"Albidon Limited","unsafe__expected___investment__mm__":null,"Probability to move to investment by 2020":"low","power_sourcing_arrangement_or_relationship_between_mine_and_":"Grid supply","Source of power":"On-Grid","energy_consumption__kwh_t_product_":550,"annual_energy_consumption__mwh_":55000,"energy_needs__mw_":5.73,"Shareholding Code":"Sole Ownership by a private company","Mine Location":"(-16.05, 28.2666667)","Location notes":null,"Region":"SA","Tariff Public Utility":3.9,"Cost relativity":"equal tariff","Grid Energy Source":"Mainly Hydro Powered Generation","Grid Reliability":"0 to 50 days","Source":"Infomine","Notes":null,"Reference":"Infomine","Projects Pre-2000":"No","Projects 2001-2012":"Yes","Projects 2020":"Yes"},{"_id":59,"Property Name":"Letlhakane-Mokobaesi","Country":"Botswana","Commodity":"Uranium","Type of Work":"Underground","Status":"Feasibility","Extent of Processing":"refined","Best Reserve Available":"Indicated Reserves","reserves_tonnes____000__units":182200,"Reserve Grade":156,"Reserve grade Unit":"parts per million","Current Production":null,"Current Production Unit":null,"unsafe__expected__yearly_production_at_full_capacity":2200000,"unsafe__expected__production_at_full_capacity_unit":"lb","life_of_mine__years_":36,"project_inception__year_":2014,"project_completion__year_":2050,"Company Name":"A-Cap Resources Ltd","unsafe__expected___investment__mm__":169,"Probability to move to investment by 2020":"high","power_sourcing_arrangement_or_relationship_between_mine_and_":"Grid supply","Source of power":"On-Grid","energy_consumption__kwh_t_product_":178000,"annual_energy_consumption__mwh_":177627,"energy_needs__mw_":18.5,"Shareholding Code":"Sole Ownership by a private company","Mine Location":"(-21.9166667, 27.3)","Location notes":null,"Region":"SA","Tariff Public Utility":6.7,"Cost relativity":"equal tariff","Grid Energy Source":"Mainly Coal Fuelled Generation","Grid Reliability":"0 to 50 days","Source":"Infomine","Notes":"The target annual production rate at an assumed leaching recovery of 80% is 2.2 million lbs U3O8 [846 t U] (ww.wise-uranium.org/upafr.html#BW). Project development is aided by the excellent local infrastructure: the project lies adjacent to the Botswana’s main growth corridor, which includes the key highway between Francistown and Gaborone. A north-south railway line runs parallel to this highway, along with the 220,000V high-tension power line. ","Reference":"Infomine, Mining Weekly","Projects Pre-2000":"No","Projects 2001-2012":"No","Projects 2020":"Yes"},{"_id":60,"Property Name":"Valencia","Country":"Namibia","Commodity":"Uranium","Type of Work":"Open-Pit","Status":"Feasibility","Extent of Processing":"refined","Best Reserve Available":"Indicated Reserves","reserves_tonnes____000__units":130000,"Reserve Grade":190,"Reserve grade Unit":"parts per million","Current Production":null,"Current Production Unit":null,"unsafe__expected__yearly_production_at_full_capacity":3600000,"unsafe__expected__production_at_full_capacity_unit":"lb","life_of_mine__years_":17,"project_inception__year_":2013,"project_completion__year_":2030,"Company Name":"Forsys Metals Corp (100%)","unsafe__expected___investment__mm__":256,"Probability to move to investment by 2020":"high","power_sourcing_arrangement_or_relationship_between_mine_and_":"Mines invest in the grid","Source of power":"On-Grid","energy_consumption__kwh_t_product_":178000,"annual_energy_consumption__mwh_":290662,"energy_needs__mw_":30.28,"Shareholding Code":"Joint- venture with State Equity","Mine Location":"(-22.35, 15.2333333)","Location notes":null,"Region":"SA","Tariff Public Utility":8.4,"Cost relativity":"equal tariff","Grid Energy Source":"Mainly Hydro Powered Generation","Grid Reliability":"0 to 50 days","Source":"Infomine","Notes":"Construction of power infrastructure has commenced in conjunction with NamPower - cost equally shared between company and national power utility","Reference":"Infomine, Company Website","Projects Pre-2000":"No","Projects 2001-2012":"No","Projects 2020":"Yes"},{"_id":61,"Property Name":"Arlit","Country":"Niger","Commodity":"Uranium","Type of Work":"Open-Pit","Status":"Producer","Extent of Processing":"refined","Best Reserve Available":"Proven Reserves","reserves_tonnes____000__units":82,"Reserve Grade":0,"Reserve grade Unit":null,"Current Production":1808000,"Current Production Unit":"kilograms","unsafe__expected__yearly_production_at_full_capacity":6600000,"unsafe__expected__production_at_full_capacity_unit":"lb","life_of_mine__years_":52,"project_inception__year_":1971,"project_completion__year_":2023,"Company Name":"Government Of Niger (36.6%),  Areva (63.4%)","unsafe__expected___investment__mm__":null,"Probability to move to investment by 2020":"high","power_sourcing_arrangement_or_relationship_between_mine_and_":"Mines invest in the grid","Source of power":"On-Grid","energy_consumption__kwh_t_product_":178000,"annual_energy_consumption__mwh_":534000,"energy_needs__mw_":55.63,"Shareholding Code":"Join-venture with only private interests","Mine Location":"(18.75, 7.3166667)","Location notes":null,"Region":"WA","Tariff Public Utility":15.5,"Cost relativity":"equal tariff","Grid Energy Source":"Mainly Oil Fuelled Generation","Grid Reliability":"0 to 50 days","Source":"Infomine","Notes":"Used 2011 resources and reserves and 2009 production to calculate remaining LOM (taken from Infomine); remaining LOM = 7.4 years. The urban community of Arlit, the NGO Droit à l’Énergie and AREVA came together to provide electricity to 4 areas surrounding the city (Areva). All installed capacity is currently thermally fired but Niger has around 230 MW of economic hydro power potential that it could develop. The SOE Coal distribution company (Société Nigerienne du Charbon d’Anou Araren SONICHAR) divides operations into the Zone Interconnectée, Zone Nord and Centres Isolés areas and fuel power plants Niger has two thermal power stations. One station, at Arlit, runs on locally mined coal and supplies the uranium mine as well as Agadez (MBendi)","Reference":"Infomine, Company Website, Mbendi, http://metals.about.com/od/suppliersaz/tp/10-Largest-Uranium-Mines.htm, \nhttp://www.mbendi.com/indy/powr/af/ni/p0005.htm","Projects Pre-2000":"Yes","Projects 2001-2012":"Yes","Projects 2020":"Yes"},{"_id":62,"Property Name":"Bakouma","Country":"Central African Republic","Commodity":"Uranium","Type of Work":"Surface","Status":"Exploration","Extent of Processing":"refined","Best Reserve Available":"Inferred Resources","reserves_tonnes____000__units":5700,"Reserve Grade":0.2,"Reserve grade Unit":"%","Current Production":null,"Current Production Unit":null,"unsafe__expected__yearly_production_at_full_capacity":4400000,"unsafe__expected__production_at_full_capacity_unit":"lb","life_of_mine__years_":16,"project_inception__year_":2015,"project_completion__year_":2031,"Company Name":"Areva","unsafe__expected___investment__mm__":null,"Probability to move to investment by 2020":"low","power_sourcing_arrangement_or_relationship_between_mine_and_":"Self-supply","Source of power":"On-site HFO","energy_consumption__kwh_t_product_":178000,"annual_energy_consumption__mwh_":356000,"energy_needs__mw_":37.08,"Shareholding Code":"Sole Ownership by a private company","Mine Location":"(5.6666667, 23.1666667)","Location notes":null,"Region":"CA","Tariff Public Utility":11.9,"Cost relativity":"above tariff","Grid Energy Source":"Mainly Hydro Powered Generation","Grid Reliability":"0 to 50 days","Source":"Infomine","Notes":"Probably on-site HFO","Reference":null,"Projects Pre-2000":"No","Projects 2001-2012":"No","Projects 2020":"Yes"},{"_id":63,"Property Name":"Trekkopje","Country":"Namibia","Commodity":"Uranium","Type of Work":"Open-Pit","Status":"Development","Extent of Processing":"refined","Best Reserve Available":"Inferred Resources","reserves_tonnes____000__units":28968,"Reserve Grade":126,"Reserve grade Unit":"parts per million","Current Production":3000,"Current Production Unit":"tons","unsafe__expected__yearly_production_at_full_capacity":6600000,"unsafe__expected__production_at_full_capacity_unit":"lb","life_of_mine__years_":12,"project_inception__year_":2013,"project_completion__year_":2025,"Company Name":"Areva (100%)","unsafe__expected___investment__mm__":920,"Probability to move to investment by 2020":"high","power_sourcing_arrangement_or_relationship_between_mine_and_":"Grid supply","Source of power":"On-Grid","energy_consumption__kwh_t_product_":178000,"annual_energy_consumption__mwh_":534000,"energy_needs__mw_":55.63,"Shareholding Code":"Sole Ownership by a private company","Mine Location":"(-22.1666667, 14.6333333)","Location notes":null,"Region":"SA","Tariff Public Utility":8.4,"Cost relativity":"equal tariff","Grid Energy Source":"Mainly Hydro Powered Generation","Grid Reliability":"0 to 50 days","Source":"WISE Uranium Project ","Notes":"The firm was in discussions with NamPower over power supply since NamPower is faced with a deficit in supply","Reference":"http://www.wise-uranium.org/upnatrk.html","Projects Pre-2000":"No","Projects 2001-2012":"No","Projects 2020":"Yes"},{"_id":64,"Property Name":"Azelik Mine (Teguida)","Country":"Niger","Commodity":"Uranium","Type of Work":"Open-Pit","Status":"Development","Extent of Processing":"refined","Best Reserve Available":"Proven Reserves","reserves_tonnes____000__units":11579,"Reserve Grade":0.2,"Reserve grade Unit":"%","Current Production":700,"Current Production Unit":"tons","unsafe__expected__yearly_production_at_full_capacity":5500000,"unsafe__expected__production_at_full_capacity_unit":"lb","life_of_mine__years_":10,"project_inception__year_":2013,"project_completion__year_":2022,"Company Name":"SOMINA 37.2%; Sinou 33%; Niger Govt 24.8%; Trendfield Holdings 5%","unsafe__expected___investment__mm__":239,"Probability to move to investment by 2020":"high","power_sourcing_arrangement_or_relationship_between_mine_and_":"Grid supply","Source of power":"On-Grid","energy_consumption__kwh_t_product_":178000,"annual_energy_consumption__mwh_":445000,"energy_needs__mw_":46.35,"Shareholding Code":"Joint- venture with State Equity","Mine Location":"(17.5166667, 6.7666667)","Location notes":null,"Region":"WA","Tariff Public Utility":15.5,"Cost relativity":"equal tariff","Grid Energy Source":"Mainly Oil Fuelled Generation","Grid Reliability":"0 to 50 days","Source":"IM","Notes":null,"Reference":"Infomine, http://world-nuclear.org/","Projects Pre-2000":"No","Projects 2001-2012":"No","Projects 2020":"Yes"},{"_id":65,"Property Name":"Rhovan","Country":"South Africa","Commodity":"Vanadium","Type of Work":"Open-Pit","Status":"Producer","Extent of Processing":"refined","Best Reserve Available":"Proven Reserves","reserves_tonnes____000__units":16173,"Reserve Grade":0.51,"Reserve grade Unit":"%","Current Production":null,"Current Production Unit":null,"unsafe__expected__yearly_production_at_full_capacity":6000,"unsafe__expected__production_at_full_capacity_unit":"tons","life_of_mine__years_":48,"project_inception__year_":1989,"project_completion__year_":2037,"Company Name":"Xstrata (74%)","unsafe__expected___investment__mm__":null,"Probability to move to investment by 2020":"high","power_sourcing_arrangement_or_relationship_between_mine_and_":"Grid supply","Source of power":"On-Grid","energy_consumption__kwh_t_product_":3000,"annual_energy_consumption__mwh_":18000,"energy_needs__mw_":1.88,"Shareholding Code":"Join-venture with only private interests","Mine Location":"(-25.5666667, 27.5666667)","Location notes":null,"Region":"SA","Tariff Public Utility":4,"Cost relativity":"equal tariff","Grid Energy Source":"Mainly Coal Fuelled Generation","Grid Reliability":"0 to 50 days","Source":"Infomine","Notes":null,"Reference":"Infomine, Company Website,  http://wikimapia.org/8712173/Rhovan-Vanadium-Mine, http://free.financialmail.co.za/report07/xstrata07/ax.htm, http://www.platinumweekly.co.za/2011%2009%2023%20P23%2023%20September%202011%20Rustenburg%20Newspaper.pdf","Projects Pre-2000":"Yes","Projects 2001-2012":"Yes","Projects 2020":"Yes"},{"_id":66,"Property Name":"Selkrik Mine","Country":"Botswana","Commodity":"Nickel","Type of Work":"Underground","Status":"Temporary Suspension","Extent of Processing":"intermediate","Best Reserve Available":"Inferred Resources","reserves_tonnes____000__units":11300,"Reserve Grade":0.27,"Reserve grade Unit":"%","Current Production":11644,"Current Production Unit":"tons","unsafe__expected__yearly_production_at_full_capacity":60000,"unsafe__expected__production_at_full_capacity_unit":"tons","life_of_mine__years_":13,"project_inception__year_":1989,"project_completion__year_":2002,"Company Name":"Norilsk Nickel (85%), Botswana Govt (15%)","unsafe__expected___investment__mm__":null,"Probability to move to investment by 2020":"low","power_sourcing_arrangement_or_relationship_between_mine_and_":"Grid supply","Source of power":"On-Grid","energy_consumption__kwh_t_product_":6600,"annual_energy_consumption__mwh_":396000,"energy_needs__mw_":41.25,"Shareholding Code":"Joint- venture with State Equity","Mine Location":"(-21.2166667, 27.65)","Location notes":null,"Region":"SA","Tariff Public Utility":6.7,"Cost relativity":"equal tariff","Grid Energy Source":"Mainly Coal Fuelled Generation","Grid Reliability":"0 to 50 days","Source":"Infomine","Notes":"The survey shows that by 2009/10, the power consumption at peak load from Tati Nickel would have doubled amid the power crisis that has engulfed the country. Currently at peak load, the mines use 39 mega watts (MW) of power and next year they will require 81 MW. Current ore depleted but new exploration projects will likely produce by 2020","Reference":"Infomine, Company Website, Publications","Projects Pre-2000":"Yes","Projects 2001-2012":"Yes","Projects 2020":"No"},{"_id":67,"Property Name":"Alucam","Country":"Cameroon","Commodity":"Aluminum","Type of Work":"Plant","Status":"Producer","Extent of Processing":"smelted","Best Reserve Available":"None","reserves_tonnes____000__units":null,"Reserve Grade":null,"Reserve grade Unit":null,"Current Production":90000,"Current Production Unit":"tons","unsafe__expected__yearly_production_at_full_capacity":90000,"unsafe__expected__production_at_full_capacity_unit":"tons","life_of_mine__years_":null,"project_inception__year_":1960,"project_completion__year_":2050,"Company Name":" Government Of Cameroon 46.67%, Rio Tinto Alcan 46.67%, AFD 5.6% And Employees 1.1% ","unsafe__expected___investment__mm__":null,"Probability to move to investment by 2020":"high","power_sourcing_arrangement_or_relationship_between_mine_and_":"Grid supply","Source of power":"On-Grid","energy_consumption__kwh_t_product_":15500,"annual_energy_consumption__mwh_":1395000,"energy_needs__mw_":145.31,"Shareholding Code":"Joint- venture with State Equity","Mine Location":"(3.8, 10.1333333)","Location notes":null,"Region":"CA","Tariff Public Utility":16,"Cost relativity":"equal tariff","Grid Energy Source":"Mainly Hydro Powered Generation","Grid Reliability":"0 to 50 days","Source":"WB","Notes":"Cross-subsidized by low and medium voltage customers, RTA’s Alumnium Smelter Alucam historically received power at a subsidized rate of US$0.015/kWh under a 30 year PPA that expired in 2009. Under a new long-term PPA with AES-SONEL in effect since January 2010, Alucam’s average electricity tariff for up to a maximum of 250 MW is CFA 12.94/kWh (US$0.028/kWh equivalent) (US$0.025/kWh global average) before indexation for inflation.  ","Reference":"http://siteresources.worldbank.org/INTCAMEROON/Resources/LPHP-PAD-Mar2012.pdf","Projects Pre-2000":"Yes","Projects 2001-2012":"Yes","Projects 2020":"Yes"},{"_id":68,"Property Name":"Trojan","Country":"Zimbabwe","Commodity":"Nickel","Type of Work":"Underground","Status":"Temporary Suspension","Extent of Processing":"refined","Best Reserve Available":"Proven Reserves","reserves_tonnes____000__units":1720,"Reserve Grade":1.07,"Reserve grade Unit":"%","Current Production":2047,"Current Production Unit":"tons","unsafe__expected__yearly_production_at_full_capacity":12000,"unsafe__expected__production_at_full_capacity_unit":"tons","life_of_mine__years_":7,"project_inception__year_":2013,"project_completion__year_":2020,"Company Name":"BNC ( 76.5% And Local Interests)","unsafe__expected___investment__mm__":null,"Probability to move to investment by 2020":"low","power_sourcing_arrangement_or_relationship_between_mine_and_":"Grid supply","Source of power":"On-Grid","energy_consumption__kwh_t_product_":10700,"annual_energy_consumption__mwh_":128400,"energy_needs__mw_":13.38,"Shareholding Code":"Sole Ownership by a private company","Mine Location":"(-17.3333333, 31.3)","Location notes":null,"Region":"SA","Tariff Public Utility":9.8,"Cost relativity":"equal tariff","Grid Energy Source":"Mainly Coal Fuelled Generation","Grid Reliability":"50 to 100 days","Source":"Infomine","Notes":null,"Reference":"http://www.mwanaafrica.com/operations-and-exploration/zimbabwe/bindura-nickel-corp-bnc","Projects Pre-2000":"No","Projects 2001-2012":"No","Projects 2020":"Yes"},{"_id":69,"Property Name":"Kwekwe","Country":"Zimbabwe","Commodity":"Chromium","Type of Work":"Plant","Status":"Producer","Extent of Processing":"smelted","Best Reserve Available":"None","reserves_tonnes____000__units":null,"Reserve Grade":null,"Reserve grade Unit":null,"Current Production":180000,"Current Production Unit":"tons","unsafe__expected__yearly_production_at_full_capacity":180000,"unsafe__expected__production_at_full_capacity_unit":"tons","life_of_mine__years_":20,"project_inception__year_":1999,"project_completion__year_":2020,"Company Name":"Zimasco","unsafe__expected___investment__mm__":85,"Probability to move to investment by 2020":"high","power_sourcing_arrangement_or_relationship_between_mine_and_":"Grid supply","Source of power":"On-Grid","energy_consumption__kwh_t_product_":4340,"annual_energy_consumption__mwh_":781200,"energy_needs__mw_":81.38,"Shareholding Code":"Sole Ownership by a private company","Mine Location":"(-18.91, 29.81)","Location notes":null,"Region":"SA","Tariff Public Utility":9.8,"Cost relativity":"equal tariff","Grid Energy Source":"Mainly Coal Fuelled Generation","Grid Reliability":"50 to 100 days","Source":"Infomine","Notes":null,"Reference":null,"Projects Pre-2000":"Yes","Projects 2001-2012":"Yes","Projects 2020":"Yes"},{"_id":70,"Property Name":"Skorpion Mine","Country":"Namibia","Commodity":"Zinc","Type of Work":"Open-Pit","Status":"Producer","Extent of Processing":"refined","Best Reserve Available":"Proven and Probable Reserves","reserves_tonnes____000__units":21600,"Reserve Grade":10.57,"Reserve grade Unit":"%","Current Production":151700,"Current Production Unit":"tons","unsafe__expected__yearly_production_at_full_capacity":150000,"unsafe__expected__production_at_full_capacity_unit":"tons","life_of_mine__years_":14,"project_inception__year_":2003,"project_completion__year_":2017,"Company Name":"Anglo American Corp 100%","unsafe__expected___investment__mm__":454,"Probability to move to investment by 2020":"closed by 2020","power_sourcing_arrangement_or_relationship_between_mine_and_":"Grid supply","Source of power":"On-Grid","energy_consumption__kwh_t_product_":1075,"annual_energy_consumption__mwh_":161250,"energy_needs__mw_":16.8,"Shareholding Code":"Sole Ownership by a private company","Mine Location":"(-27.8, 16.6)","Location notes":null,"Region":"SA","Tariff Public Utility":8.4,"Cost relativity":"equal tariff","Grid Energy Source":"Mainly Hydro Powered Generation","Grid Reliability":"0 to 50 days","Source":"IM","Notes":"NamPower provides power for the Skorpion mine through a 400 kV overhead transmission line from its Kokerboom substation","Reference":"Infomine, Company Website","Projects Pre-2000":"No","Projects 2001-2012":"Yes","Projects 2020":"No"},{"_id":71,"Property Name":"Richards Bay Minerals Operation","Country":"South Africa","Commodity":"Zirconium","Type of Work":"Placer","Status":"Producer","Extent of Processing":"smelted","Best Reserve Available":"None","reserves_tonnes____000__units":null,"Reserve Grade":null,"Reserve grade Unit":null,"Current Production":219950,"Current Production Unit":"tons","unsafe__expected__yearly_production_at_full_capacity":219950,"unsafe__expected__production_at_full_capacity_unit":"tons","life_of_mine__years_":27,"project_inception__year_":2016,"project_completion__year_":2043,"Company Name":"Rio Tinto (74%), Blue Horizon Investments (24%) And RMB Permanent Employees (2%)","unsafe__expected___investment__mm__":150,"Probability to move to investment by 2020":"high","power_sourcing_arrangement_or_relationship_between_mine_and_":"Grid supply","Source of power":"On-Grid","energy_consumption__kwh_t_product_":54600,"annual_energy_consumption__mwh_":12009270,"energy_needs__mw_":1250.97,"Shareholding Code":"Join-venture with only private interests","Mine Location":"(-28.8, 32.0333333)","Location notes":null,"Region":"SA","Tariff Public Utility":4,"Cost relativity":"equal tariff","Grid Energy Source":"Mainly Coal Fuelled Generation","Grid Reliability":"0 to 50 days","Source":"CW","Notes":"Report: EIA for Richards Bay Minerals' Tailings Treatment Plant Tails Deposition Project, Richards Bay, KwaZulu-Natal","Reference":null,"Projects Pre-2000":"No","Projects 2001-2012":"No","Projects 2020":"Yes"},{"_id":72,"Property Name":"Mozal","Country":"Mozambique","Commodity":"Aluminum","Type of Work":"Plant","Status":"Producer","Extent of Processing":"smelted","Best Reserve Available":"None","reserves_tonnes____000__units":null,"Reserve Grade":null,"Reserve grade Unit":null,"Current Production":500000,"Current Production Unit":"tons","unsafe__expected__yearly_production_at_full_capacity":500000,"unsafe__expected__production_at_full_capacity_unit":"tons","life_of_mine__years_":null,"project_inception__year_":2000,"project_completion__year_":2050,"Company Name":"Mozal SARL (BHP Billiton Plc, 47.11%) Mitsubishi Corporation (25 %, Industrial Development Corporation Of South Africa Limited (24 %, And The Government Of Mozambique (3.9 %)","unsafe__expected___investment__mm__":1300,"Probability to move to investment by 2020":"high","power_sourcing_arrangement_or_relationship_between_mine_and_":"Grid supply","Source of power":"On-Grid","energy_consumption__kwh_t_product_":15500,"annual_energy_consumption__mwh_":7750000,"energy_needs__mw_":807.29,"Shareholding Code":"Joint- venture with State Equity","Mine Location":"(-14.8475, 40.7202778)","Location notes":null,"Region":"SA","Tariff Public Utility":4.1,"Cost relativity":"equal tariff","Grid Energy Source":"Mainly Hydro Powered Generation","Grid Reliability":"50 to 100 days","Source":"USGS","Notes":"Mozal sources power from Eskom via Motraco, a transmission joint venture between Eskom and the national electricity utilities of Mozambique and Swaziland. Tariffs are fixed through to 2012 and will be linked to the LME aluminium price thereafter. The joint venture has a 50-year right to use the land, renewable for another 50 years under a government concession.","Reference":"http://www.ide.go.jp/English/Data/Africa_file/Company/mozambique01.html","Projects Pre-2000":"Yes","Projects 2001-2012":"Yes","Projects 2020":"Yes"},{"_id":73,"Property Name":"Bayside","Country":"South Africa","Commodity":"Aluminum","Type of Work":"Plant","Status":"Producer","Extent of Processing":"smelted","Best Reserve Available":"None","reserves_tonnes____000__units":null,"Reserve Grade":null,"Reserve grade Unit":null,"Current Production":184000,"Current Production Unit":"tons","unsafe__expected__yearly_production_at_full_capacity":184000,"unsafe__expected__production_at_full_capacity_unit":"tons","life_of_mine__years_":null,"project_inception__year_":1971,"project_completion__year_":null,"Company Name":"Billiton Aluminium South Africa (Pty.) Ltd. ","unsafe__expected___investment__mm__":null,"Probability to move to investment by 2020":"high","power_sourcing_arrangement_or_relationship_between_mine_and_":"Grid supply","Source of power":"On-Grid","energy_consumption__kwh_t_product_":15500,"annual_energy_consumption__mwh_":2852000,"energy_needs__mw_":297.08,"Shareholding Code":"Sole Ownership by a private company","Mine Location":"(-28.7166667, 32.0)","Location notes":null,"Region":"SA","Tariff Public Utility":4,"Cost relativity":"equal tariff","Grid Energy Source":"Mainly Coal Fuelled Generation","Grid Reliability":"0 to 50 days","Source":"USGS","Notes":"BHP signed a  25-year contract which dates back to 1992 when SA had a power oversupply. But now Eskom wants it to be set aside, saying the cost to the utility is too high. The contract, which is confidential, links BHP's electricity tariff to the dollar price of aluminium. It has given BHP a significant discount on its tariffs, which led it to build the electricity-intensive smelters in Richards Bay in the 1990s. Eskom said the deal will cost it more than R5-billion over the life of the contract. BHP may be paying as little as 8.8c per kWh due to the low aluminium price, compared with Eskom's current tariff of 61c per kWh. (http://www.bdlive.co.za/business/energy/2012/10/28/bhp-power-deal-in-balance)","Reference":null,"Projects Pre-2000":"Yes","Projects 2001-2012":"Yes","Projects 2020":"Yes"},{"_id":74,"Property Name":"Boke Bauxite Mine","Country":"Guinea","Commodity":"Bauxite","Type of Work":"Open-Pit","Status":"Producer","Extent of Processing":"crushed","Best Reserve Available":"None","reserves_tonnes____000__units":null,"Reserve Grade":null,"Reserve grade Unit":null,"Current Production":12030000,"Current Production Unit":"tons","unsafe__expected__yearly_production_at_full_capacity":12068000,"unsafe__expected__production_at_full_capacity_unit":"tons","life_of_mine__years_":75,"project_inception__year_":1968,"project_completion__year_":2043,"Company Name":"(CBG) Compagnie Des Bauxites De Guinee (100%)","unsafe__expected___investment__mm__":null,"Probability to move to investment by 2020":"high","power_sourcing_arrangement_or_relationship_between_mine_and_":"Self-supply + CSR","Source of power":"On-site Diesel","energy_consumption__kwh_t_product_":4,"annual_energy_consumption__mwh_":48272,"energy_needs__mw_":5.03,"Shareholding Code":"Sole Ownership by a private company","Mine Location":"(10.9333333, -14.3)","Location notes":null,"Region":"WA","Tariff Public Utility":12.6,"Cost relativity":"above tariff","Grid Energy Source":"Mainly Hydro Powered Generation","Grid Reliability":"100 to 150 days","Source":"Infomine","Notes":"CBG has 50 MW installed capacity","Reference":"Infomine, WB, http://www.angloaluminum.com/pdf/NAV-4pgr-Feb4-09.pdf","Projects Pre-2000":"Yes","Projects 2001-2012":"Yes","Projects 2020":"Yes"},{"_id":75,"Property Name":"Sangaredi","Country":"Guinea","Commodity":"Bauxite","Type of Work":"Open-Pit","Status":"Producer","Extent of Processing":"refined","Best Reserve Available":"Indicated Reserves","reserves_tonnes____000__units":179000,"Reserve Grade":48.3,"Reserve grade Unit":"%","Current Production":13088000,"Current Production Unit":"tons","unsafe__expected__yearly_production_at_full_capacity":1500000,"unsafe__expected__production_at_full_capacity_unit":"tons","life_of_mine__years_":31,"project_inception__year_":2007,"project_completion__year_":2038,"Company Name":"Compagnie Des Bauxites De Guinée (Halco Mining 51%)","unsafe__expected___investment__mm__":null,"Probability to move to investment by 2020":"high","power_sourcing_arrangement_or_relationship_between_mine_and_":"Self-supply","Source of power":"On-site Diesel","energy_consumption__kwh_t_product_":620,"annual_energy_consumption__mwh_":930000,"energy_needs__mw_":96.88,"Shareholding Code":"Joint- venture with State Equity","Mine Location":"(11.1, -13.7666667)","Location notes":null,"Region":"WA","Tariff Public Utility":12.6,"Cost relativity":"above tariff","Grid Energy Source":"Mainly Hydro Powered Generation","Grid Reliability":"100 to 150 days","Source":"Infomine","Notes":"In partnership with BHP, GAC is constructing a large alumina refinery in Sangaredi, investment will be US$ 2.3 billion. With a capacity of 1.5 million tpy of alumina","Reference":"Infomine, WB (Guinea Mining and Infrastructure)","Projects Pre-2000":"No","Projects 2001-2012":"Yes","Projects 2020":"Yes"},{"_id":76,"Property Name":"Deziwa/ Ecaille Copper","Country":"Congo, Dem. Rep. of","Commodity":"Copper","Type of Work":"Surface","Status":"Exploration","Extent of Processing":"smelted","Best Reserve Available":"Indicated Reserves","reserves_tonnes____000__units":4600,"Reserve Grade":null,"Reserve grade Unit":null,"Current Production":null,"Current Production Unit":null,"unsafe__expected__yearly_production_at_full_capacity":200000,"unsafe__expected__production_at_full_capacity_unit":"tons","life_of_mine__years_":null,"project_inception__year_":2015,"project_completion__year_":null,"Company Name":"Gecamines","unsafe__expected___investment__mm__":null,"Probability to move to investment by 2020":"low","power_sourcing_arrangement_or_relationship_between_mine_and_":"Grid supply","Source of power":"On-Grid","energy_consumption__kwh_t_product_":6050,"annual_energy_consumption__mwh_":1210000,"energy_needs__mw_":126.04,"Shareholding Code":"Sole ownership by the State-Owned Company","Mine Location":null,"Location notes":"No information","Region":"CA","Tariff Public Utility":4.7,"Cost relativity":"equal tariff","Grid Energy Source":"Mainly Hydro Powered Generation","Grid Reliability":"150 to 200 days","Source":"Infomine","Notes":null,"Reference":"WB, Mining Weekly","Projects Pre-2000":"No","Projects 2001-2012":"No","Projects 2020":"Yes"},{"_id":77,"Property Name":"Alucam","Country":"Cameroon","Commodity":"Aluminum","Type of Work":"Plant","Status":"Advanced Exploration","Extent of Processing":"smelted","Best Reserve Available":"None","reserves_tonnes____000__units":null,"Reserve Grade":null,"Reserve grade Unit":null,"Current Production":null,"Current Production Unit":null,"unsafe__expected__yearly_production_at_full_capacity":210000,"unsafe__expected__production_at_full_capacity_unit":"tons","life_of_mine__years_":null,"project_inception__year_":2017,"project_completion__year_":null,"Company Name":"Rio Tinto","unsafe__expected___investment__mm__":2000,"Probability to move to investment by 2020":"low","power_sourcing_arrangement_or_relationship_between_mine_and_":"Self-supply + sell to the grid","Source of power":"On-site Hydro","energy_consumption__kwh_t_product_":15500,"annual_energy_consumption__mwh_":3255000,"energy_needs__mw_":339.06,"Shareholding Code":"Sole Ownership by a private company","Mine Location":"(3.8, 10.1333333)","Location notes":null,"Region":"CA","Tariff Public Utility":16,"Cost relativity":"below tariff","Grid Energy Source":"Mainly Hydro Powered Generation","Grid Reliability":"0 to 50 days","Source":"WB","Notes":"In October 2005, Rio Tinto Alcan signed a memorandum of understanding with the Government of Cameroon, which was then amended in November 2007, to provide for the expansion of the Alucam smelter and development and construction of a greenfield aluminium smelter. Under the agreed upon terms, Alucam, a joint venture in which Rio Tinto Alcan owns a 47 per cent interest, would build a 300 MW power dam and a 200,000 tonne per year expansion of the existing smelter. In addition, a 930MW power dam would be developed together with a 400,000 tonne per year greenfield aluminium smelter by Rio Tinto Alcan on a 100 per cent basis. The expansion and the greenfield smelter are at different stages of development, but when completed both would be positioned in the first half of the industry cost curve.","Reference":"Company Website","Projects Pre-2000":"No","Projects 2001-2012":"No","Projects 2020":"Yes"},{"_id":78,"Property Name":"Ngaoundal/Minitrap","Country":"Cameroon","Commodity":"Bauxite","Type of Work":"Surface","Status":"Advanced Exploration","Extent of Processing":"refined","Best Reserve Available":"None","reserves_tonnes____000__units":null,"Reserve Grade":null,"Reserve grade Unit":null,"Current Production":null,"Current Production Unit":null,"unsafe__expected__yearly_production_at_full_capacity":8500000,"unsafe__expected__production_at_full_capacity_unit":"tons","life_of_mine__years_":null,"project_inception__year_":2019,"project_completion__year_":null,"Company Name":"Cal","unsafe__expected___investment__mm__":null,"Probability to move to investment by 2020":"low","power_sourcing_arrangement_or_relationship_between_mine_and_":"Self-supply + sell to the grid","Source of power":"On-site Hydro","energy_consumption__kwh_t_product_":620,"annual_energy_consumption__mwh_":5270000,"energy_needs__mw_":548.96,"Shareholding Code":"Sole Ownership by a private company","Mine Location":null,"Location notes":"Adamawa region","Region":"CA","Tariff Public Utility":16,"Cost relativity":"below tariff","Grid Energy Source":"Mainly Hydro Powered Generation","Grid Reliability":"0 to 50 days","Source":"WB","Notes":"A wholly-owned subsidiary of Hydromine Global Mineral (HGM), Cameroon Alumina Limited (CAL) is incorporated and registered in Cameroon. HGM is a joint venture company of Hindalco Industries Ltd, India, Dubai Aluminium Company (DUBAL), UAE, and Hydromine Inc, USA.\nCAL intends to set up a bauxite mining and alumina refinery project based on the bauxite reserves of Minim-Martap and Ngaoundal deposits located in the Adamawa region in the northern Cameroon. Powersourcing arrangements as B because of 2011 Electricity Law in Cameroon","Reference":"http://www.cameroonalumina.com/project/project.html","Projects Pre-2000":"No","Projects 2001-2012":"No","Projects 2020":"Yes"},{"_id":79,"Property Name":"Landau Coal Mine","Country":"South Africa","Commodity":"Coal","Type of Work":"Open-Pit","Status":"Producer","Extent of Processing":"crushed","Best Reserve Available":"None","reserves_tonnes____000__units":null,"Reserve Grade":null,"Reserve grade Unit":null,"Current Production":4171200,"Current Production Unit":"tons","unsafe__expected__yearly_production_at_full_capacity":4000000,"unsafe__expected__production_at_full_capacity_unit":"tons","life_of_mine__years_":29,"project_inception__year_":1990,"project_completion__year_":2019,"Company Name":"Anglo American (100%)","unsafe__expected___investment__mm__":null,"Probability to move to investment by 2020":"high","power_sourcing_arrangement_or_relationship_between_mine_and_":"Self-supply + sell to the grid","Source of power":"On-Site Coal","energy_consumption__kwh_t_product_":37,"annual_energy_consumption__mwh_":148000,"energy_needs__mw_":15.42,"Shareholding Code":"Sole Ownership by a private company","Mine Location":"(-25.7833333, 29.1)","Location notes":null,"Region":"SA","Tariff Public Utility":4,"Cost relativity":"above tariff","Grid Energy Source":"Mainly Coal Fuelled Generation","Grid Reliability":"0 to 50 days","Source":"Infomine","Notes":null,"Reference":"Infomine, Company Website","Projects Pre-2000":"Yes","Projects 2001-2012":"Yes","Projects 2020":"Yes"},{"_id":80,"Property Name":"Optimum Colliery","Country":"South Africa","Commodity":"Coal","Type of Work":"Open-Pit","Status":"Producer","Extent of Processing":"crushed","Best Reserve Available":"Unclassified","reserves_tonnes____000__units":null,"Reserve Grade":null,"Reserve grade Unit":null,"Current Production":11302000,"Current Production Unit":"tons","unsafe__expected__yearly_production_at_full_capacity":13500000,"unsafe__expected__production_at_full_capacity_unit":"tons","life_of_mine__years_":61,"project_inception__year_":1970,"project_completion__year_":2031,"Company Name":"Optimum Coal Holdings","unsafe__expected___investment__mm__":null,"Probability to move to investment by 2020":"high","power_sourcing_arrangement_or_relationship_between_mine_and_":"Self-supply + sell to the grid","Source of power":"On-site Coal","energy_consumption__kwh_t_product_":37,"annual_energy_consumption__mwh_":499500,"energy_needs__mw_":52.03,"Shareholding Code":"Join-venture with only private interests","Mine Location":"(-26.0, 29.6)","Location notes":null,"Region":"SA","Tariff Public Utility":4,"Cost relativity":"above tariff","Grid Energy Source":"Mainly Coal Fuelled Generation","Grid Reliability":"0 to 50 days","Source":"Infomine","Notes":null,"Reference":"Infomine, Company Website","Projects Pre-2000":"Yes","Projects 2001-2012":"Yes","Projects 2020":"Yes"},{"_id":81,"Property Name":"Vanggatfontein","Country":"South Africa","Commodity":"Coal","Type of Work":"Open-Pit/Underground","Status":"Producer","Extent of Processing":"crushed","Best Reserve Available":"Proven Reserves","reserves_tonnes____000__units":24300,"Reserve Grade":55,"Reserve grade Unit":"%","Current Production":null,"Current Production Unit":null,"unsafe__expected__yearly_production_at_full_capacity":2100000,"unsafe__expected__production_at_full_capacity_unit":"tons","life_of_mine__years_":20,"project_inception__year_":2009,"project_completion__year_":2029,"Company Name":"Keaton Energy Holdings Ltd","unsafe__expected___investment__mm__":150,"Probability to move to investment by 2020":"high","power_sourcing_arrangement_or_relationship_between_mine_and_":"Self-supply + sell to the grid","Source of power":"On-site Coal","energy_consumption__kwh_t_product_":55,"annual_energy_consumption__mwh_":115500,"energy_needs__mw_":12.03,"Shareholding Code":"Sole Ownership by a private company","Mine Location":"(-26.15, 28.7666667)","Location notes":null,"Region":"SA","Tariff Public Utility":4,"Cost relativity":"above tariff","Grid Energy Source":"Mainly Coal Fuelled Generation","Grid Reliability":"0 to 50 days","Source":"Infomine","Notes":null,"Reference":"Infomine, Company Website, http://www.miningreview.com/node/16801","Projects Pre-2000":"No","Projects 2001-2012":"Yes","Projects 2020":"Yes"},{"_id":82,"Property Name":"Kakanda North/South","Country":"Congo, Dem. Rep. of","Commodity":"Cobalt","Type of Work":"Surface","Status":"Past Producer","Extent of Processing":"intermediate","Best Reserve Available":"Indicated Reserves","reserves_tonnes____000__units":18500,"Reserve Grade":0.15,"Reserve grade Unit":"%","Current Production":null,"Current Production Unit":null,"unsafe__expected__yearly_production_at_full_capacity":3500,"unsafe__expected__production_at_full_capacity_unit":"tons","life_of_mine__years_":7,"project_inception__year_":null,"project_completion__year_":null,"Company Name":"Greenock Resources Inc. (70%), Gecamines (30%)","unsafe__expected___investment__mm__":900,"Probability to move to investment by 2020":"closed","power_sourcing_arrangement_or_relationship_between_mine_and_":"Grid supply","Source of power":"On-Grid","energy_consumption__kwh_t_product_":6500,"annual_energy_consumption__mwh_":22750,"energy_needs__mw_":2.37,"Shareholding Code":"Joint- venture with State Equity","Mine Location":"(-10.7666667, 26.1666667)","Location notes":null,"Region":"CA","Tariff Public Utility":4.7,"Cost relativity":"equal tariff","Grid Energy Source":"Mainly Hydro Powered Generation","Grid Reliability":"150 to 200 days","Source":"Infomine","Notes":"Project development stalled due to ownership claim dispute between Greenock and third parties. Power: supplied by state authority, annual consumption 25 MWh. Sufficient power for a mining/milling operation (200kV, 50 Hertz, 3-phase) is available from an existing National Electricity Commission (“SNEL”) substation situated at the Kakanda mine site. $2.42/t power cost","Reference":"Infomine, Company Website, Publications","Projects Pre-2000":"No","Projects 2001-2012":"Yes","Projects 2020":"No"},{"_id":83,"Property Name":"Chirodzi","Country":"Mozambique","Commodity":"Coal","Type of Work":"Open-Pit","Status":"Producer","Extent of Processing":"crushed","Best Reserve Available":"Combined Resources","reserves_tonnes____000__units":1200000,"Reserve Grade":50,"Reserve grade Unit":"%","Current Production":null,"Current Production Unit":null,"unsafe__expected__yearly_production_at_full_capacity":10000000,"unsafe__expected__production_at_full_capacity_unit":"tons","life_of_mine__years_":25,"project_inception__year_":2013,"project_completion__year_":2038,"Company Name":"Jindal Steel And Power Limited","unsafe__expected___investment__mm__":180,"Probability to move to investment by 2020":"high","power_sourcing_arrangement_or_relationship_between_mine_and_":"Self-supply + sell to the grid","Source of power":"On-Site Coal","energy_consumption__kwh_t_product_":37,"annual_energy_consumption__mwh_":370000,"energy_needs__mw_":38.54,"Shareholding Code":"Sole Ownership by a private company","Mine Location":null,"Location notes":"Tete Province","Region":"SA","Tariff Public Utility":4.1,"Cost relativity":"above tariff","Grid Energy Source":"Mainly Hydro Powered Generation","Grid Reliability":"50 to 100 days","Source":"Infomine","Notes":"Plan to build a 2600MW plant","Reference":"Company Website, Reuters","Projects Pre-2000":"No","Projects 2001-2012":"No","Projects 2020":"Yes"},{"_id":84,"Property Name":"Kokoya","Country":"Liberia","Commodity":"Gold","Type of Work":"Open-Pit","Status":"Feasibility","Extent of Processing":"refined","Best Reserve Available":"Inferred Resources","reserves_tonnes____000__units":200,"Reserve Grade":2.6,"Reserve grade Unit":"grams","Current Production":null,"Current Production Unit":null,"unsafe__expected__yearly_production_at_full_capacity":50000,"unsafe__expected__production_at_full_capacity_unit":"ounce","life_of_mine__years_":5,"project_inception__year_":null,"project_completion__year_":null,"Company Name":"Amlib","unsafe__expected___investment__mm__":null,"Probability to move to investment by 2020":"high","power_sourcing_arrangement_or_relationship_between_mine_and_":"Self-supply","Source of power":"On-site Diesel","energy_consumption__kwh_t_product_":25000000,"annual_energy_consumption__mwh_":35437,"energy_needs__mw_":3.69,"Shareholding Code":"Sole Ownership by a private company","Mine Location":null,"Location notes":null,"Region":"WA","Tariff Public Utility":53,"Cost relativity":"below tariff","Grid Energy Source":"Mainly Oil Fuelled Generation","Grid Reliability":"0 to 50 days","Source":"WB","Notes":null,"Reference":"Infomine, Company Website","Projects Pre-2000":"No","Projects 2001-2012":"No","Projects 2020":"Yes"},{"_id":85,"Property Name":"Everest North/Vygenhoek","Country":"South Africa","Commodity":"Platinum","Type of Work":"Underground","Status":"Temporary Suspension","Extent of Processing":"refined","Best Reserve Available":"Indicated Reserves","reserves_tonnes____000__units":5266,"Reserve Grade":4.92,"Reserve grade Unit":"grams","Current Production":1331474,"Current Production Unit":"grams","unsafe__expected__yearly_production_at_full_capacity":180000,"unsafe__expected__production_at_full_capacity_unit":"ounce","life_of_mine__years_":15,"project_inception__year_":2003,"project_completion__year_":2018,"Company Name":"Aquarius Platinum Ltd","unsafe__expected___investment__mm__":null,"Probability to move to investment by 2020":"low","power_sourcing_arrangement_or_relationship_between_mine_and_":"Grid supply","Source of power":"On-Grid","energy_consumption__kwh_t_product_":69489780,"annual_energy_consumption__mwh_":354600,"energy_needs__mw_":36.94,"Shareholding Code":"Sole Ownership by a private company","Mine Location":"(-24.9833333, 30.1)","Location notes":null,"Region":"SA","Tariff Public Utility":4,"Cost relativity":"equal tariff","Grid Energy Source":"Mainly Coal Fuelled Generation","Grid Reliability":"0 to 50 days","Source":"Infomine","Notes":"Offtake agreement with Impala Refining Services. Full production of 5PGMs + Au","Reference":"Infomine, Company Website","Projects Pre-2000":"No","Projects 2001-2012":"Yes","Projects 2020":"Yes"},{"_id":86,"Property Name":"Phoenix Mine (Tati Nickel)","Country":"Botswana","Commodity":"Copper","Type of Work":"Open-Pit","Status":"Producer","Extent of Processing":"intermediate","Best Reserve Available":"Proven Reserves","reserves_tonnes____000__units":111800,"Reserve Grade":0.18,"Reserve grade Unit":"%","Current Production":7872,"Current Production Unit":"tons","unsafe__expected__yearly_production_at_full_capacity":17185,"unsafe__expected__production_at_full_capacity_unit":"tons","life_of_mine__years_":20,"project_inception__year_":1995,"project_completion__year_":2015,"Company Name":"Norilsk Nickel (85%), Botswana Govt (15%)","unsafe__expected___investment__mm__":null,"Probability to move to investment by 2020":"closed by 2020","power_sourcing_arrangement_or_relationship_between_mine_and_":"Grid supply","Source of power":"On-Grid","energy_consumption__kwh_t_product_":5000,"annual_energy_consumption__mwh_":85925,"energy_needs__mw_":8.95,"Shareholding Code":"Joint- venture with State Equity","Mine Location":"(-21.2, 27.7666667)","Location notes":null,"Region":"SA","Tariff Public Utility":6.7,"Cost relativity":"equal tariff","Grid Energy Source":"Mainly Coal Fuelled Generation","Grid Reliability":"0 to 50 days","Source":"Infomine","Notes":"The survey shows that by 2009/10, the power consumption at peak load from Tati Nickel would have doubled amid the power crisis that has engulfed the country. Currently at peak load, the mines use 39MW of power and next year they will require 81 MW; Current ore depleted but new exploration projects will likely produce by 2020. For full production IM's highest production historical year has been used","Reference":"Infomine, Company Website, Publications","Projects Pre-2000":"Yes","Projects 2001-2012":"Yes","Projects 2020":"No"},{"_id":87,"Property Name":"Otjihase","Country":"Namibia","Commodity":"Copper","Type of Work":"Open-Pit/Underground","Status":"Producer","Extent of Processing":"intermediate","Best Reserve Available":"Inferred Resources","reserves_tonnes____000__units":1975,"Reserve Grade":1.86,"Reserve grade Unit":"%","Current Production":6300,"Current Production Unit":"tons","unsafe__expected__yearly_production_at_full_capacity":9000,"unsafe__expected__production_at_full_capacity_unit":"tons","life_of_mine__years_":27,"project_inception__year_":2000,"project_completion__year_":2027,"Company Name":"Weatherly 100%","unsafe__expected___investment__mm__":null,"Probability to move to investment by 2020":"high","power_sourcing_arrangement_or_relationship_between_mine_and_":"Grid supply","Source of power":"On-Grid","energy_consumption__kwh_t_product_":7000,"annual_energy_consumption__mwh_":63000,"energy_needs__mw_":6.56,"Shareholding Code":"Sole Ownership by a private company","Mine Location":"(-22.3833333, 17.2333333)","Location notes":null,"Region":"SA","Tariff Public Utility":8.4,"Cost relativity":"equal tariff","Grid Energy Source":"Mainly Hydro Powered Generation","Grid Reliability":"0 to 50 days","Source":"Company Website","Notes":null,"Reference":"Company Website","Projects Pre-2000":"Yes","Projects 2001-2012":"Yes","Projects 2020":"Yes"},{"_id":88,"Property Name":"Williamson (Mwadui)","Country":"Tanzania","Commodity":"Diamond","Type of Work":"Open-Pit","Status":"Producer","Extent of Processing":"separation","Best Reserve Available":"Indicated Reserves","reserves_tonnes____000__units":98634,"Reserve Grade":0.05,"Reserve grade Unit":"carats","Current Production":75932,"Current Production Unit":"carat","unsafe__expected__yearly_production_at_full_capacity":320000,"unsafe__expected__production_at_full_capacity_unit":"carat","life_of_mine__years_":20,"project_inception__year_":2010,"project_completion__year_":null,"Company Name":"Petra Dimaonds  (100%)","unsafe__expected___investment__mm__":null,"Probability to move to investment by 2020":"high","power_sourcing_arrangement_or_relationship_between_mine_and_":"Grid supply","Source of power":"On-Grid","energy_consumption__kwh_t_product_":30000000,"annual_energy_consumption__mwh_":40020,"energy_needs__mw_":4.17,"Shareholding Code":"Sole Ownership by a private company","Mine Location":"(-3.5166667, 33.6)","Location notes":null,"Region":"EA","Tariff Public Utility":5.3,"Cost relativity":"equal tariff","Grid Energy Source":"Mainly Hydro Powered Generation","Grid Reliability":"50 to 100 days","Source":"Infomine","Notes":"Includes the future expansion plan that is now on hold","Reference":"http://www.petradiamonds.com/operations/operating-mines/williamson.aspx","Projects Pre-2000":"No","Projects 2001-2012":"Yes","Projects 2020":"Yes"},{"_id":89,"Property Name":"Blyvooruitzicht","Country":"South Africa","Commodity":"Gold","Type of Work":"Open-Pit/Underground","Status":"Producer","Extent of Processing":"refined","Best Reserve Available":"Proven Reserves","reserves_tonnes____000__units":25859,"Reserve Grade":3.99,"Reserve grade Unit":"grams","Current Production":3767057,"Current Production Unit":"grams","unsafe__expected__yearly_production_at_full_capacity":160000,"unsafe__expected__production_at_full_capacity_unit":"ounce","life_of_mine__years_":88,"project_inception__year_":1942,"project_completion__year_":2030,"Company Name":"Drdgold (74%), Khumo Bathong Holdings (20%), BEE Group (6%)","unsafe__expected___investment__mm__":null,"Probability to move to investment by 2020":"high","power_sourcing_arrangement_or_relationship_between_mine_and_":"Grid supply","Source of power":"On-Grid","energy_consumption__kwh_t_product_":45000000,"annual_energy_consumption__mwh_":204116,"energy_needs__mw_":21.26,"Shareholding Code":"Join-venture with only private interests","Mine Location":"(-26.4, 27.3333333)","Location notes":null,"Region":"SA","Tariff Public Utility":4,"Cost relativity":"equal tariff","Grid Energy Source":"Mainly Coal Fuelled Generation","Grid Reliability":"0 to 50 days","Source":"Infomine","Notes":null,"Reference":"Infomine, Company Website, http://en.wikipedia.org/wiki/Blyvooruitzicht","Projects Pre-2000":"Yes","Projects 2001-2012":"Yes","Projects 2020":"Yes"},{"_id":90,"Property Name":"Kakanda / Kambove Tailings","Country":"Congo, Dem. Rep. of","Commodity":"Copper","Type of Work":"Tailings","Status":"Past Producer","Extent of Processing":"intermediate","Best Reserve Available":"Inferred Resources","reserves_tonnes____000__units":11300,"Reserve Grade":3.14,"Reserve grade Unit":"%","Current Production":null,"Current Production Unit":null,"unsafe__expected__yearly_production_at_full_capacity":45000,"unsafe__expected__production_at_full_capacity_unit":"tons","life_of_mine__years_":15,"project_inception__year_":1982,"project_completion__year_":1997,"Company Name":"Gecamines","unsafe__expected___investment__mm__":240,"Probability to move to investment by 2020":"closed","power_sourcing_arrangement_or_relationship_between_mine_and_":"Mines invest in the grid","Source of power":"On-Grid","energy_consumption__kwh_t_product_":5000,"annual_energy_consumption__mwh_":225000,"energy_needs__mw_":23.44,"Shareholding Code":"Sole ownership by the State-Owned Company","Mine Location":"(-10.85, 26.6166667)","Location notes":null,"Region":"CA","Tariff Public Utility":4.7,"Cost relativity":"equal tariff","Grid Energy Source":"Mainly Hydro Powered Generation","Grid Reliability":"150 to 200 days","Source":"Infomine","Notes":"Kambove abandoned (from Greenock 2008 Kakanda feasibility study):By early 1997 it was evident the Kambove tailings dump could not be treated economically. As a result, it was agreed, between Gécamines and IPRC, during a meeting in April, 1997 toabandon the Kambove tailings. As an alternative, Gécamines provided two hard rock resources at Kakanda, the dormant Kakanda South and North open pit operations.","Reference":"http://www.thefreelibrary.com/Int%27l+Panorama+-+Pre-Feasibility+Study+Completed+on+Congo-Zaire...-a019454855","Projects Pre-2000":"Yes","Projects 2001-2012":"No","Projects 2020":"No"},{"_id":91,"Property Name":"Cullinan Mine","Country":"South Africa","Commodity":"Diamond","Type of Work":"Underground","Status":"Producer","Extent of Processing":"separation","Best Reserve Available":"Indicated Reserves","reserves_tonnes____000__units":265339,"Reserve Grade":0.7,"Reserve grade Unit":"carats","Current Production":888784,"Current Production Unit":"carat","unsafe__expected__yearly_production_at_full_capacity":2400000,"unsafe__expected__production_at_full_capacity_unit":"carat","life_of_mine__years_":116,"project_inception__year_":1946,"project_completion__year_":2062,"Company Name":"Petra Diamonds Ltd","unsafe__expected___investment__mm__":null,"Probability to move to investment by 2020":"high","power_sourcing_arrangement_or_relationship_between_mine_and_":"Grid supply","Source of power":"On-Grid","energy_consumption__kwh_t_product_":37500000,"annual_energy_consumption__mwh_":18000,"energy_needs__mw_":1.88,"Shareholding Code":"Sole Ownership by a private company","Mine Location":"(-25.6666667, 28.5166667)","Location notes":null,"Region":"SA","Tariff Public Utility":4,"Cost relativity":"equal tariff","Grid Energy Source":"Mainly Coal Fuelled Generation","Grid Reliability":"0 to 50 days","Source":"Infomine","Notes":"Mine plan: 18 years; potential mine life: 50+ years. Tailings: Petra continues to ramp up a major tailings operation at Cullinan to treat the 165 million tonne tailings deposit and a new modular, tailings plant is currently under construction","Reference":"Infomine, Company Website","Projects Pre-2000":"Yes","Projects 2001-2012":"Yes","Projects 2020":"Yes"},{"_id":92,"Property Name":"Venetia Mine","Country":"South Africa","Commodity":"Diamond","Type of Work":"Open-Pit","Status":"Producer","Extent of Processing":"separation","Best Reserve Available":"Indicated Reserves","reserves_tonnes____000__units":9800,"Reserve Grade":1.34,"Reserve grade Unit":"carats","Current Production":2204000,"Current Production Unit":"carat","unsafe__expected__yearly_production_at_full_capacity":7500000,"unsafe__expected__production_at_full_capacity_unit":"carat","life_of_mine__years_":29,"project_inception__year_":1992,"project_completion__year_":2021,"Company Name":"De Beers","unsafe__expected___investment__mm__":400,"Probability to move to investment by 2020":"high","power_sourcing_arrangement_or_relationship_between_mine_and_":"Grid supply","Source of power":"On-Grid","energy_consumption__kwh_t_product_":30000000,"annual_energy_consumption__mwh_":45000,"energy_needs__mw_":4.69,"Shareholding Code":"Sole Ownership by a private company","Mine Location":"(-22.4333333, 29.3166667)","Location notes":null,"Region":"SA","Tariff Public Utility":4,"Cost relativity":"equal tariff","Grid Energy Source":"Mainly Coal Fuelled Generation","Grid Reliability":"0 to 50 days","Source":"Infomine","Notes":"Full production was achieved in 1993. A feasibility study for the proposed R15 billion (US $2.1 Billion) investment to convert the open pit into an underground mine is underway. Open pit operations will run to 2021 and the conversion to underground mining is expected to extend the life of the mine by 25 years to 2046.","Reference":"Infomine, Company Website, http://www.mining-technology.com/projects/de_beers/","Projects Pre-2000":"Yes","Projects 2001-2012":"Yes","Projects 2020":"Yes"},{"_id":93,"Property Name":"Loulo (Gara Mine)","Country":"Mali","Commodity":"Gold","Type of Work":"Open-Pit","Status":"Producer","Extent of Processing":"refined","Best Reserve Available":"Inferred Resources","reserves_tonnes____000__units":24755,"Reserve Grade":3.01,"Reserve grade Unit":"grams","Current Production":3085464,"Current Production Unit":"grams","unsafe__expected__yearly_production_at_full_capacity":500000,"unsafe__expected__production_at_full_capacity_unit":"ounce","life_of_mine__years_":22,"project_inception__year_":2005,"project_completion__year_":2027,"Company Name":"Randgold (80%), Mali (20%)","unsafe__expected___investment__mm__":null,"Probability to move to investment by 2020":"high","power_sourcing_arrangement_or_relationship_between_mine_and_":"Self-supply","Source of power":"On-Site Diesel","energy_consumption__kwh_t_product_":25000000,"annual_energy_consumption__mwh_":354369,"energy_needs__mw_":36.91,"Shareholding Code":"Sole Ownership by a private company","Mine Location":"(13.0833333, -11.3666667)","Location notes":null,"Region":"WA","Tariff Public Utility":18,"Cost relativity":"above tariff","Grid Energy Source":"Mainly Hydro Powered Generation","Grid Reliability":"0 to 50 days","Source":"IM","Notes":"Trying to connect to the grid, delayed by coup","Reference":"Infomine, Company Website, WB","Projects Pre-2000":"No","Projects 2001-2012":"Yes","Projects 2020":"Yes"},{"_id":94,"Property Name":"Kolwezi Concentrator","Country":"Congo, Dem. Rep. of","Commodity":"Copper","Type of Work":"Open-Pit","Status":"Producer","Extent of Processing":"intermediate","Best Reserve Available":"None","reserves_tonnes____000__units":null,"Reserve Grade":null,"Reserve grade Unit":null,"Current Production":30954,"Current Production Unit":"tons","unsafe__expected__yearly_production_at_full_capacity":30954,"unsafe__expected__production_at_full_capacity_unit":"tons","life_of_mine__years_":53,"project_inception__year_":2008,"project_completion__year_":2061,"Company Name":"Gecamines(100%)","unsafe__expected___investment__mm__":null,"Probability to move to investment by 2020":"high","power_sourcing_arrangement_or_relationship_between_mine_and_":"Grid supply","Source of power":"On-Grid","energy_consumption__kwh_t_product_":5000,"annual_energy_consumption__mwh_":154770,"energy_needs__mw_":16.12,"Shareholding Code":"Sole ownership by the State-Owned Company","Mine Location":null,"Location notes":null,"Region":"CA","Tariff Public Utility":4.7,"Cost relativity":"equal tariff","Grid Energy Source":"Mainly Hydro Powered Generation","Grid Reliability":"150 to 200 days","Source":"Infomine","Notes":"Concentrator has been decomissioned since 2008. In addition, it represents concentration already captured as recorded with actual mining sites in Katanga","Reference":"http://www.infomine.com/index/pr/Pa348712.PDF","Projects Pre-2000":"No","Projects 2001-2012":"Yes","Projects 2020":"Yes"},{"_id":95,"Property Name":"Sheba's Ridge","Country":"South Africa","Commodity":"Copper","Type of Work":"Open-Pit","Status":"Feasibility","Extent of Processing":"smelted","Best Reserve Available":"Indicated Reserves","reserves_tonnes____000__units":339860,"Reserve Grade":0.07,"Reserve grade Unit":"%","Current Production":null,"Current Production Unit":null,"unsafe__expected__yearly_production_at_full_capacity":11000,"unsafe__expected__production_at_full_capacity_unit":"tons","life_of_mine__years_":20,"project_inception__year_":2013,"project_completion__year_":2033,"Company Name":"Anglo American Platinum Ltd (35%), Aquarius Platinum Ltd (39%), Industrial Development Corp Of South Africa (26%)","unsafe__expected___investment__mm__":972,"Probability to move to investment by 2020":"high","power_sourcing_arrangement_or_relationship_between_mine_and_":"Grid supply","Source of power":"On-Grid","energy_consumption__kwh_t_product_":6050,"annual_energy_consumption__mwh_":66550,"energy_needs__mw_":6.93,"Shareholding Code":"Join-venture with only private interests","Mine Location":"(-25.4333333, 29.5666667)","Location notes":null,"Region":"SA","Tariff Public Utility":4,"Cost relativity":"equal tariff","Grid Energy Source":"Mainly Coal Fuelled Generation","Grid Reliability":"0 to 50 days","Source":"Infomine","Notes":"2009; completion of feasibility report. Ridge continues to consult with Pace Global Energy Services to examine alternatives to reduce reliance on grid supply from Eskom due to the current and projected power supply constraints. Further studies and discussions with Eskom are necessary in order for the Company to be in a position to make a development decision.","Reference":"Infomine, Feasibility Report 2008, http://www.infomine.com/index/pr/PA645346.PDF","Projects Pre-2000":"No","Projects 2001-2012":"No","Projects 2020":"Yes"},{"_id":96,"Property Name":"Yetwene","Country":"Angola","Commodity":"Diamond","Type of Work":"Placer","Status":"Temporary Suspension","Extent of Processing":"separation","Best Reserve Available":"None","reserves_tonnes____000__units":null,"Reserve Grade":null,"Reserve grade Unit":null,"Current Production":120000,"Current Production Unit":"carat","unsafe__expected__yearly_production_at_full_capacity":120000,"unsafe__expected__production_at_full_capacity_unit":"carat","life_of_mine__years_":null,"project_inception__year_":1998,"project_completion__year_":null,"Company Name":"Energem Resources Inc., 48%;[Almazy Rossii-Sakha Joint Stock (Alrosa), Espiritu Santo Bank Of Portugal","unsafe__expected___investment__mm__":null,"Probability to move to investment by 2020":"low","power_sourcing_arrangement_or_relationship_between_mine_and_":"Grid supply","Source of power":"On-Grid","energy_consumption__kwh_t_product_":30000000,"annual_energy_consumption__mwh_":720,"energy_needs__mw_":0.08,"Shareholding Code":"Join-venture with only private interests","Mine Location":"(-8.0833333, 20.3333333)","Location notes":null,"Region":"SA","Tariff Public Utility":4.9,"Cost relativity":"equal tariff","Grid Energy Source":"Mainly Hydro Powered Generation","Grid Reliability":"50 to 100 days","Source":"USGS","Notes":"Temporary suspension since 1999","Reference":"Infomine, Mbendi","Projects Pre-2000":"Yes","Projects 2001-2012":"Yes","Projects 2020":"Yes"},{"_id":97,"Property Name":"Orapa Mine","Country":"Botswana","Commodity":"Diamond","Type of Work":"Open-Pit","Status":"Producer","Extent of Processing":"separation","Best Reserve Available":"Indicated Reserves","reserves_tonnes____000__units":105900,"Reserve Grade":0.34,"Reserve grade Unit":"carats","Current Production":7575000,"Current Production Unit":"carat","unsafe__expected__yearly_production_at_full_capacity":12000000,"unsafe__expected__production_at_full_capacity_unit":"carat","life_of_mine__years_":56,"project_inception__year_":1971,"project_completion__year_":2027,"Company Name":"De Beers (50%), Government Of Botswana (50%)","unsafe__expected___investment__mm__":null,"Probability to move to investment by 2020":"high","power_sourcing_arrangement_or_relationship_between_mine_and_":"Mines invest in the grid","Source of power":"On-Grid","energy_consumption__kwh_t_product_":30000000,"annual_energy_consumption__mwh_":112200,"energy_needs__mw_":11.69,"Shareholding Code":"Joint- venture with State Equity","Mine Location":"(-21.4666667, 25.6)","Location notes":null,"Region":"SA","Tariff Public Utility":6.7,"Cost relativity":"equal tariff","Grid Energy Source":"Mainly Coal Fuelled Generation","Grid Reliability":"0 to 50 days","Source":"Infomine","Notes":"The plant at Orapa Mine was erected as a partnership between Debswana Mine, Botswana Power Corporation and the Botswana Government. For full production IM's highest production historical year has been used. Life of open pit expected to 2027, then shaft operations expected to begin.","Reference":"Infomine, Company Website, Publications","Projects Pre-2000":"Yes","Projects 2001-2012":"Yes","Projects 2020":"Yes"},{"_id":98,"Property Name":"Passendro/Bambari","Country":"Central African Republic","Commodity":"Gold","Type of Work":"Surface","Status":"Feasibility","Extent of Processing":"refined","Best Reserve Available":"Proven Reserves","reserves_tonnes____000__units":3500,"Reserve Grade":1.8,"Reserve grade Unit":"grams","Current Production":1500000,"Current Production Unit":"grams","unsafe__expected__yearly_production_at_full_capacity":180000,"unsafe__expected__production_at_full_capacity_unit":"ounce","life_of_mine__years_":8.300000000000001,"project_inception__year_":2013,"project_completion__year_":2021,"Company Name":"Axmin Inc. (100%)","unsafe__expected___investment__mm__":250,"Probability to move to investment by 2020":"high","power_sourcing_arrangement_or_relationship_between_mine_and_":"Grid supply + self-supply backup","Source of power":"On-Site HFO, On-Grid","energy_consumption__kwh_t_product_":25000000,"annual_energy_consumption__mwh_":127573,"energy_needs__mw_":13.29,"Shareholding Code":"Sole Ownership by a private company","Mine Location":null,"Location notes":"60km north of Bambari","Region":"CA","Tariff Public Utility":11.9,"Cost relativity":"above tariff","Grid Energy Source":"Mainly Hydro Powered Generation","Grid Reliability":"0 to 50 days","Source":"Infomine","Notes":"There is a possibility that the Kembe hydro-electric scheme could come to fruition during the mine life. The Company will co-operate with the local authority so that both they and the mine could ensure a benefit, both during and after the mine life.","Reference":"Infomine, Company Website","Projects Pre-2000":"No","Projects 2001-2012":"No","Projects 2020":"Yes"},{"_id":99,"Property Name":"Mutanda","Country":"Congo, Dem. Rep. of","Commodity":"Copper","Type of Work":"Open-Pit","Status":"Producer","Extent of Processing":"intermediate","Best Reserve Available":"Proven Reserves","reserves_tonnes____000__units":47176,"Reserve Grade":3.4,"Reserve grade Unit":"%","Current Production":66400,"Current Production Unit":"tons","unsafe__expected__yearly_production_at_full_capacity":200000,"unsafe__expected__production_at_full_capacity_unit":"tons","life_of_mine__years_":20,"project_inception__year_":2010,"project_completion__year_":2030,"Company Name":"Samref Congo Sprl (80%) (Glencore Majority Stakeholder Of Samref), Rowny Assets Limited (20%)","unsafe__expected___investment__mm__":650,"Probability to move to investment by 2020":"high","power_sourcing_arrangement_or_relationship_between_mine_and_":"Mines invest in the grid","Source of power":"On-Grid","energy_consumption__kwh_t_product_":5000,"annual_energy_consumption__mwh_":550000,"energy_needs__mw_":57.29,"Shareholding Code":"Join-venture with only private interests","Mine Location":null,"Location notes":"40km SE of Kolwezi","Region":"CA","Tariff Public Utility":4.7,"Cost relativity":"equal tariff","Grid Energy Source":"Mainly Hydro Powered Generation","Grid Reliability":"150 to 200 days","Source":"Infomine","Notes":"Co-invests with Société Nationale d’Electricité (SNEL) to increase power availability as well as refurburish hydroelectric facility in Katanga Province by 2015","Reference":"Infomine, Company Website, Publications","Projects Pre-2000":"No","Projects 2001-2012":"Yes","Projects 2020":"Yes"},{"_id":100,"Property Name":"Sentinel/Kalumbila","Country":"Zambia","Commodity":"Copper","Type of Work":"Underground","Status":"Advanced Exploration","Extent of Processing":"smelted","Best Reserve Available":"Indicated Reserves","reserves_tonnes____000__units":23900,"Reserve Grade":0.48,"Reserve grade Unit":"%","Current Production":null,"Current Production Unit":null,"unsafe__expected__yearly_production_at_full_capacity":300000,"unsafe__expected__production_at_full_capacity_unit":"tons","life_of_mine__years_":20,"project_inception__year_":2015,"project_completion__year_":2035,"Company Name":"First Quantum Minerals Ltd","unsafe__expected___investment__mm__":1000,"Probability to move to investment by 2020":"high","power_sourcing_arrangement_or_relationship_between_mine_and_":"Grid supply","Source of power":"On-Grid","energy_consumption__kwh_t_product_":8050,"annual_energy_consumption__mwh_":2012500,"energy_needs__mw_":209.64,"Shareholding Code":"Sole Ownership by a private company","Mine Location":"(-12.1833333, 25.1166667)","Location notes":null,"Region":"SA","Tariff Public Utility":3.9,"Cost relativity":"equal tariff","Grid Energy Source":"Mainly Hydro Powered Generation","Grid Reliability":"0 to 50 days","Source":"Infomine","Notes":null,"Reference":null,"Projects Pre-2000":"No","Projects 2001-2012":"No","Projects 2020":"Yes"}], "fields": [{"id": "_id", "type": "int"}, {"id": "Property Name", "type": "text", "info": {"label": "Property Name"}}, {"id": "Country", "type": "text", "info": {"label": "Country"}}, {"id": "Commodity", "type": "text", "info": {"label": "Commodity"}}, {"id": "Type of Work", "type": "text", "info": {"label": "Type of Work"}}, {"id": "Status", "type": "text", "info": {"label": "Status"}}, {"id": "Extent of Processing", "type": "text", "info": {"label": "Extent of Processing"}}, {"id": "Best Reserve Available", "type": "text", "info": {"label": "Best Reserve Available"}}, {"id": "reserves_tonnes____000__units", "type": "numeric", "info": {"label": "Reserves Tonnes\u00a0 (,000) Units"}}, {"id": "Reserve Grade", "type": "numeric", "info": {"label": "Reserve Grade"}}, {"id": "Reserve grade Unit", "type": "text", "info": {"label": "Reserve grade Unit"}}, {"id": "Current Production", "type": "numeric", "info": {"label": "Current Production"}}, {"id": "Current Production Unit", "type": "text", "info": {"label": "Current Production Unit"}}, {"id": "unsafe__expected__yearly_production_at_full_capacity", "type": "numeric", "info": {"label": "(Expected) Yearly Production at full capacity"}}, {"id": "unsafe__expected__production_at_full_capacity_unit", "type": "text", "info": {"label": "(Expected) Production at full capacity unit"}}, {"id": "life_of_mine__years_", "type": "numeric", "info": {"label": "Life of Mine (years)"}}, {"id": "project_inception__year_", "type": "numeric", "info": {"label": "Project Inception (Year)"}}, {"id": "project_completion__year_", "type": "numeric", "info": {"label": "Project Completion (Year)"}}, {"id": "Company Name", "type": "text", "info": {"label": "Company Name"}}, {"id": "unsafe__expected___investment__mm__", "type": "numeric", "info": {"label": "(Expected)  Investment (MM$)"}}, {"id": "Probability to move to investment by 2020", "type": "text", "info": {"label": "Probability to move to investment by 2020"}}, {"id": "power_sourcing_arrangement_or_relationship_between_mine_and_", "type": "text", "info": {"label": "Power Sourcing Arrangement or Relationship Between Mine and Grid."}}, {"id": "Source of power", "type": "text", "info": {"label": "Source of power"}}, {"id": "energy_consumption__kwh_t_product_", "type": "numeric", "info": {"label": "Energy Consumption (kwh/t product)"}}, {"id": "annual_energy_consumption__mwh_", "type": "numeric", "info": {"label": "Annual Energy Consumption (MWh)"}}, {"id": "energy_needs__mw_", "type": "numeric", "info": {"label": "Energy needs (MW)"}}, {"id": "Shareholding Code", "type": "text", "info": {"label": "Shareholding Code"}}, {"id": "Mine Location", "type": "text", "info": {"label": "Mine Location"}}, {"id": "Location notes", "type": "text", "info": {"label": "Location notes"}}, {"id": "Region", "type": "text", "info": {"label": "Region"}}, {"id": "Tariff Public Utility", "type": "numeric", "info": {"label": "Tariff Public Utility"}}, {"id": "Cost relativity", "type": "text", "info": {"label": "Cost relativity"}}, {"id": "Grid Energy Source", "type": "text", "info": {"label": "Grid Energy Source"}}, {"id": "Grid Reliability", "type": "text", "info": {"label": "Grid Reliability"}}, {"id": "Source", "type": "text", "info": {"label": "Source"}}, {"id": "Notes", "type": "text", "info": {"label": "Notes"}}, {"id": "Reference", "type": "text", "info": {"label": "Reference"}}, {"id": "Projects Pre-2000", "type": "text", "info": {"label": "Projects Pre-2000"}}, {"id": "Projects 2001-2012", "type": "text", "info": {"label": "Projects 2001-2012"}}, {"id": "Projects 2020", "type": "text", "info": {"label": "Projects 2020"}}], "_links": {"start": "/api/3/action/datastore_search?resource_id=aad8a5d4-5e5f-4464-b720-e8a882c59957", "next": "/api/3/action/datastore_search?resource_id=aad8a5d4-5e5f-4464-b720-e8a882c59957&offset=100"}, "total": 455, "total_was_estimated": false}}